Federal
Interregional Transmission Planning Improvement Act of 2023
Source: Congress.gov ·
762 words in original text
Plain English summary not yet available
The full original text is available below. Check back soon as we process this bill.
II
118TH CONGRESS
1ST SESSION
S. 1748
To require the Federal Energy Regulatory Commission to reform the
interregional transmission planning process, and for other purposes.
IN THE SENATE OF THE UNITED STATES
MAY 18, 2023
Mr. HEINRICH introduced the following bill; which was read twice and referred
to the Committee on Energy and Natural Resources
A BILL
To require the Federal Energy Regulatory Commission to
reform the interregional transmission planning process,
and for other purposes.
Be it enacted by the Senate and House of Representa-
1
tives of the United States of America in Congress assembled,
2
SECTION 1. SHORT TITLE.
3
This Act may be cited as the ‘‘Interregional Trans-
4
mission Planning Improvement Act of 2023’’.
5
SEC. 2. INCREASING EFFECTIVENESS OF INTERREGIONAL
6
TRANSMISSION PLANNING.
7
(a) IN GENERAL.—The Federal Energy Regulatory
8
Commission (referred to in this section as the ‘‘Commis-
9
sion’’) shall ensure—
10
VerDate Sep 11 2014
06:38 Jun 02, 2023
Jkt 039200
PO 00000
Frm 00001
Fmt 6652
Sfmt 6201
E:\BILLS\S1748.IS
S1748
kjohnson on DSK79L0C42PROD with BILLS
2
•S 1748 IS
(1) the effectiveness of existing planning proc-
1
esses for identifying interregional transmission
2
projects that provide economic, reliability, and oper-
3
ational benefits, taking into consideration the public
4
interest, the integrity of markets, and the protection
5
of consumers;
6
(2) any changes to the processes described in
7
paragraph (1) promote efficient, cost-effective, and
8
broadly beneficial interregional transmission solu-
9
tions that are selected for cost allocation—
10
(A) taking into consideration—
11
(i) the public interest;
12
(ii) the integrity of markets;
13
(iii) the protection of consumers;
14
(iv) the broad range of economic, reli-
15
ability, and operational benefits;
16
(v) the need for single projects to se-
17
cure approvals based on a comprehensive
18
assessment of the multiple benefits pro-
19
vided;
20
(vi) that projects that meet inter-
21
regional benefit criteria should not be sub-
22
ject to subsequent reassessment by trans-
23
mission planning authorities;
24
VerDate Sep 11 2014
06:38 Jun 02, 2023
Jkt 039200
PO 00000
Frm 00002
Fmt 6652
Sfmt 6201
E:\BILLS\S1748.IS
S1748
kjohnson on DSK79L0C42PROD with BILLS
3
•S 1748 IS
(vii) the importance of synchroni-
1
zation of planning processes in neighboring
2
regions, such as using a joint model on a
3
consistent timeline with a single set of
4
needs, input assumptions, and benefit
5
metrics;
6
(viii) that evaluation of long-term sce-
7
narios should align with the expected life
8
of a transmission asset to be not less than
9
20 years;
10
(ix) that transmission planning au-
11
thorities should allow for the identification
12
and joint evaluation of alternatives pro-
13
posed by stakeholders;
14
(x) that interregional planning should
15
be done regularly and not less frequently
16
than once every 2 years; and
17
(xi)
the
elimination
of
arbitrary
18
project voltage, size, or cost requirements
19
for interregional solutions; and
20
(B) regardless of the regulatory or busi-
21
ness model of the entity developing the trans-
22
mission project; and
23
(3) the use of cost allocation methodologies
24
that—
25
VerDate Sep 11 2014
06:38 Jun 02, 2023
Jkt 039200
PO 00000
Frm 00003
Fmt 6652
Sfmt 6201
E:\BILLS\S1748.IS
S1748
kjohnson on DSK79L0C42PROD with BILLS
4
•S 1748 IS
(A) reflect the multiple benefits provided
1
by interregional transmission solutions, includ-
2
ing economic, reliability, resiliency, operational
3
benefits; and
4
(B) assign costs broadly to customers
5
based on the multiple benefits described in sub-
6
paragraph (A) received by customers.
7
(b) RECOVERY OF COSTS.—The Commission shall
8
allow a transmission developer of an interregional trans-
9
mission project that meets the criteria described in sub-
10
section (a)(2)(A) to submit to the Commission a request
11
to recover the cost of the project if the transmission devel-
12
oper demonstrates to the satisfaction of the Commission
13
that—
14
(1) the project connects more than 1 planning
15
region;
16
(2) no interregional plan that meets the criteria
17
described in subsection (a)(2)(A) has been adopted
18
by the connected planning regions; and
19
(3) the benefits of the project outweigh the
20
costs of the project.
21
(c) RULEMAKING.—Not later than 18 months after
22
the date of enactment of this Act, the Commission shall
23
promulgate a final rule to implement this section.
24
Æ
VerDate Sep 11 2014
06:38 Jun 02, 2023
Jkt 039200
PO 00000
Frm 00004
Fmt 6652
Sfmt 6301
E:\BILLS\S1748.IS
S1748
kjohnson on DSK79L0C42PROD with BILLS
Important: This plain English summary was generated by AI and is provided for informational purposes only.
It is not legal advice. Always consult the official bill text on Congress.gov
or a qualified attorney for legal matters.