Texas
SB1757
SB1757 - Relating to the operation of rock crushing facilities.
Source: LegiScan ·
1,959 words in original text
Plain English summary not yet available
The full original text is available below. Check back soon as we process this bill.
      By: Birdwell, Alvarado S.B. No. 1757       Johnson     A BILL TO BE ENTITLED   AN ACT   relating to the operation of rock crushing facilities.          BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:          SECTION 1.  Section 382.05101, Health and Safety Code, is   amended to read as follows:          Sec. 382.05101.  DE MINIMIS AIR CONTAMINANTS.  The   commission may develop by rule the criteria to establish a de   minimis level of air contaminants for facilities or groups of   facilities below which the following types of permits are not   required:                (1)  a permit under Section 382.0518 or 382.0519;                (2)  a standard permit under Section 382.05195,   382.05198, [ or ] 382.051985 , or 382.0651 ; or                (3)  a permit by rule under Section 382.05196.          SECTION 2.  Section 382.0511(c), Health and Safety Code, is   amended to read as follows:          (c)  The commission may authorize changes in a federal source   to proceed before the owner or operator obtains a federal operating   permit or revisions to a federal operating permit if:                (1)  the changes are de minimis under Section   382.05101; or                (2)  the owner or operator:                      (A)  has obtained a preconstruction permit or   permit amendment required by Section 382.0518; or                      (B)  is operating under:                            (i)  a standard permit under Section   382.05195, 382.05198, [ or ] 382.051985 , or 382.0651 ;                            (ii)  a permit by rule under Section   382.05196; or                            (iii)  an exemption allowed under Section   382.057.          SECTION 3.  Subchapter C, Chapter 382, Health and Safety   Code, is amended by adding Sections 382.0651 and 382.0652 to read as   follows:           Sec.   382.0651.     STANDARD PERMIT FOR CERTAIN ROCK CRUSHING   FACILITIES.   (a)   The commission shall issue a standard permit for a   rock crushing facility that:                 (1)     is located at an aggregate production operation   required to be registered under Section 28A.051, Water Code;                 (2)     processes not more than 1,500 tons of rock per   hour; and                 (3)  meets the requirements of this section.           (b)     The standard permit issued under this section must   require that an owner or operator of a facility authorized to use   the permit, in addition to any other applicable requirements of   this chapter:                 (1)     install and operate for the first 12 consecutive   months of operation under the standard permit equipment to monitor:                       (A)     water quality in sedimentation ponds at the   aggregate production operation for the presence of contaminants   regulated by the commission's multi-sector general permit for   mineral mining and processing facilities issued under Chapter 26,   Water Code;                       (B)     the seismicity of extraction activities,   including blasting along active extraction areas; and                       (C)     emissions of air contaminants, if the   facility is located within 440 yards of two or more other aggregate   production operations;                 (2)     maintain records of monitoring data from the   monitoring equipment required by Subdivision (1) until the first   anniversary of the date on which the data was collected;                 (3)     establish a plan for providing notice of   emergencies to owners and tenants of adjacent real property;                 (4)  implement best management practices for:                       (A)  conserving water; and                       (B)     minimizing visible dust from active   extraction areas at the aggregate production operation; and                 (5)     except as provided by Subsection (d), submit to   the commission a post-extraction land use plan that includes, if   applicable:                       (A)     provisions for permanent removal of   extraction equipment;                       (B)     provisions for revegetation, including the   use of appropriate local vegetation types that are adequate for   post-extraction uses of land, as determined by the owner or   operator;                       (C)     proposed land reuse options, such as   agricultural, natural, open space, or redevelopment uses or the   creation of a pond or lake; and                       (D)     if the extraction area contains a pit that is   deeper than 10 feet, provisions for benching at 10-foot intervals   or as consistent with the geology of the pit and face wall.           (c)     The commission by rule shall adopt best management   practices for the purposes of Subsection (b)(4).           (d)     If the land on which the facility to be permitted is   located is owned by a person other than the owner or operator of the   facility, the owner or operator of the facility may submit to the   commission an agreement made between the landowner and the facility   owner or operator for post-extraction land uses instead of the   post-extraction land use plan required under Subsection (b)(5).           (e)     The commission shall inspect a facility for compliance   with this section during regular inspections under this chapter and   Chapter 28A, Water Code.           Sec.   382.0652.     STANDARD PERMIT FOR CERTAIN ROCK CRUSHING   FACILITIES: NOTICE AND MEETING.   (a)   A person may not begin   construction of a new or modification of an existing rock crushing   facility under a standard permit issued under Section 382.0651   unless the commission authorizes the person to use the permit as   provided by this section.   The notice and meeting requirements of   this section apply only to an application for authorization to use a   standard permit issued under Section 382.0651.           (b)     An applicant for an authorization to use a standard   permit issued under Section 382.0651 must publish notice under this   section not later than the earlier of:                 (1)     the 30th day after the date the applicant receives   written notice from the executive director that the application is   technically complete; or                 (2)     the 75th day after the date the executive director   receives the application.           (c)     The applicant must publish notice at least once in a   newspaper of general circulation in the municipality in which the   facility is located or proposed to be located or in the municipality   nearest to the location or proposed location of the facility.   If   the elementary or middle school nearest to the location or proposed   location of the facility provides a bilingual education program as   required by Subchapter B, Chapter 29, Education Code, the applicant   must also publish the notice at least once in an additional   publication of general circulation in each municipality or county   in which the facility is located or proposed to be located that is   published in the language taught in the bilingual education   program.   This requirement is waived if such a publication does not   exist or if the publisher refuses to publish the notice.           (d)  The notice must include:                 (1)     a brief description of the location or proposed   location and nature of the facility;                 (2)     a description, including a telephone number, of   the manner in which the executive director may be contacted for   further information;                 (3)     a description, including a telephone number, of   the manner in which the applicant may be contacted for further   information;                 (4)     the location and hours of operation of the   commission's regional office at which a copy of the application is   available for review and copying; and                 (5)     a brief description of the public comment process,   including the time and location of the public meeting to be held   under Subsection (e) and the mailing address and deadline for   filing written comments.           (e)     The applicant, in cooperation with the executive   director, must hold a public meeting in the county in which the   facility is located or proposed to be located not less than 30 days   and not more than 45 days after the first date notice is published   under Subsection (b).           (f)     At the site of the facility or proposed facility, the   applicant shall place a sign declaring the filing of an application   for an authorization to use a standard permit issued under Section   382.0651 for a rock crushing facility at the site and stating the   manner in which the commission may be contacted for further   information.   The commission shall adopt any rule necessary to   carry out this subsection.           (g)     The public comment period for written comments begins on   the first date notice is published under Subsection (b) and must   remain open for 36 hours after the close of the public meeting.           (h)     Not later than the 30th day before the date of the public   meeting, the commission shall notify the following entities of the   date, time, and place of the meeting:                 (1)     each municipality and county in which the facility   is located or proposed to be located;                 (2)  the Texas Department of Transportation;                 (3)     each groundwater conservation district with   jurisdiction over the area in which the facility is located or   proposed to be located; and                 (4)     each state representative and state senator   representing the area in which the facility is located or proposed   to be located.           (i)     Section 382.056 of this code and Chapter 2001,   Government Code, do not apply to a public m
[Text truncated for display. Full text available on LegiScan.]
Important: This plain English summary was generated by AI and is provided for informational purposes only.
It is not legal advice. Always consult the official bill text on LegiScan
or a qualified attorney for legal matters.