Texas
SB817
SB817 - Relating to air quality permits for certain concrete plants and crushing facilities.
Source: LegiScan ·
1,600 words in original text
Plain English summary not yet available
The full original text is available below. Check back soon as we process this bill.
  89R425 JXC-F     By: Miles S.B. No. 817       A BILL TO BE ENTITLED   AN ACT   relating to air quality permits for certain concrete plants and   crushing facilities.          BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:          SECTION 1.  Section 382.004(c), Health and Safety Code, is   amended to read as follows:          (c)  A person may not begin construction under this section   if the facility that is the subject of the permit amendment :                 (1)   is [ a concrete batch plant ] located within 880   yards of a building or area described by Section 382.065(a-1); and                 (2)  is a:                       (A)  concrete crushing facility; or                       (B)     concrete plant that performs wet batching,   dry batching, or central mixing [ property that is used as a   residence ].          SECTION 2.  Section 382.05198(a), Health and Safety Code, is   amended to read as follows:           (a)  The commission shall issue a standard permit for a   permanent concrete plant that performs wet batching, dry batching,   or central mixing and that meets the following requirements:                (1)  production records must be maintained on site   while the plant is in operation until the second anniversary of the   end of the period to which they relate;                (2)  each cement or fly ash storage silo and weigh   hopper must be equipped with a fabric or cartridge filter or vented   to a fabric or cartridge filter system;                (3)  each fabric or cartridge filter, fabric or   cartridge filter system, and suction shroud must be maintained and   operated properly with no tears or leaks;                (4)  excluding the suction shroud filter system, each   filter system must be designed to meet a standard of at least 0.01   outlet grain loading as measured in grains per dry standard cubic   foot;                (5)  each filter system and each mixer loading and   batch truck loading emissions control device must meet a   performance standard of no visible emissions exceeding 30 seconds   in a five-minute period as determined using United States   Environmental Protection Agency Test Method 22 as that method   existed on September 1, 2003;                (6)  if a cement or fly ash silo is filled during   nondaylight hours, the silo filter system exhaust must be   sufficiently illuminated to enable a determination of compliance   with the performance standard described by Subdivision (5);                (7)  the conveying system for the transfer of cement or   fly ash to and from each storage silo must be totally enclosed,   operate properly, and be maintained without any tears or leaks;                (8)  except during cement or fly ash tanker connection   or disconnection, each conveying system for the transfer of cement   or fly ash must meet the performance standard described by   Subdivision (5);                (9)  a warning device must be installed on each bulk   storage silo to alert the operator in sufficient time for the   operator to stop loading operations before the silo is filled to a   level that may adversely affect the pollution abatement equipment;                (10)  if filling a silo results in failure of the   pollution abatement system or failure to meet the performance   standard described by Subdivision (5), the failure must be   documented and reported to the commission;                (11)  each road, parking lot, or other area at the plant   site that is used by vehicles must be paved with a cohesive hard   surface that is properly maintained, cleaned, and watered so as to   minimize dust emissions;                (12)  each stockpile must be sprinkled with water or   dust-suppressant chemicals or covered so as to minimize dust   emissions;                (13)  material used in the batch that is spilled must be   immediately cleaned up and contained or dampened so as to minimize   dust emissions;                (14)  production of concrete at the plant must not   exceed 300 cubic yards per hour;                (15)  a suction shroud or other pickup device must be   installed at the batch drop point or, in the case of a central mix   plant, at the drum feed and vented to a fabric or cartridge filter   system with a minimum capacity of 5,000 cubic feet per minute of   air;                (16)  the bag filter and capture system must be   properly designed to accommodate the increased flow from the   suction shroud and achieve a control efficiency of at least 99.5   percent;                (17)  the suction shroud baghouse exhaust must be   located more than 100 feet from any property line; and                (18)  stationary equipment, stockpiles, and vehicles   used at the plant, except for incidental traffic and vehicles as   they enter and exit the site, must be located or operated more than   100 feet from any property line[ ; and                [ (19) the central baghouse must be located at least 440   yards from any building used as a single or multifamily residence,   school, or place of worship at the time the application to use the   permit is filed with the commission if the plant is located in an   area that is not subject to municipal zoning regulation ].          SECTION 3.  Section 382.065, Health and Safety Code, is   amended to read as follows:          Sec. 382.065.  CERTAIN LOCATIONS FOR OPERATING CERTAIN   CONCRETE FACILITIES [ CRUSHING FACILITY ] PROHIBITED. (a)   This   section applies only to a facility that is:                 (1)  a concrete crushing facility; or                 (2)     a concrete plant that performs wet batching, dry   batching, or central mixing.           (a-1)   The commission by rule shall prohibit the operation of   a [ concrete crushing ] facility within 440 yards of the following   types of buildings or areas:                 (1)   a building in use as a single or multifamily   residence, school, or place of worship ;                 (2)     a place of business where employees of the   business perform outdoor work near the facility; or                 (3)     a park or other outdoor recreational area,   including a playing field [ at the time the application for a permit   to operate the facility at a site near the residence, school, or   place of worship is filed with the commission ].           (a-2)   The measurement of distance for purposes of this   section is the shortest distance between [ subsection shall be taken   from the point on ] the [ concrete crushing ] facility and a building   or area described by Subsection (a-1) [ that is nearest to the   residence, school, or place of worship toward the point on the   residence, school, or place of worship that is nearest the concrete   crushing facility ].          (b)   A rule adopted under this section [ Subsection (a) ] does   not apply to a [ concrete crushing facility ]:                (1)   concrete crushing facility at a location for which   commission authorization for the operation of a concrete crushing   facility was in effect on September 1, 2001;                (2)   facility at a location that satisfies the distance   requirements of Subsection (a-1) [ (a) ] at the time the application   for the initial authorization for the operation of that facility at   that location is filed with the commission, provided that the   authorization is granted and maintained, regardless of whether a   building, place of business, or outdoor recreational facility   described by Subsection (a-1) [ single or multifamily residence,   school, or place of worship ] is subsequently built or put to use   within 440 yards of the facility; or                (3)   facility that:                      (A)  uses a concrete crusher:                            (i)  in the manufacture of products that   contain recycled materials; and                            (ii)  that is located in an enclosed   building; and                      (B)  is located:                            (i)  within 25 miles of an international   border; and                            (ii)  in a municipality with a population of   not less than 6,100 but not more than 20,000.          (c)  Except as provided by Subsection (d), Subsection (a-1)   [ (a) ] does not apply to a concrete crushing facility that:                (1)  is engaged in crushing concrete and other   materials produced by the demolition of a structure at the location   of the structure and the concrete and other materials are being   crushed primarily for use at that location;                (2)  operates at that location for not more than 180   days;                (3)  the commission determines will cause no adverse   environmental or health effects by operating at that location; and                (4)  complies with conditions stated in commission   rules, including operating conditions.          (d)  Notwithstanding Subsection (c), Subsection (a-1) [ (a) ]   applies to a [ concrete crushing ] facility in a county with a   population of 3.3 million or more or in a county adjacent to such a   county.          SECTION 4.  Section 382.058(c), Health and Safety Code, is   repealed.          SECTION 5.  The changes in law made by this Act apply only to   an application for a permit, permit amendment, or authorization to   use a permit filed with the Texas Commission on Environmental   Quality on or after the effective date of this Act. An application   for a permit, permit amendment, or authorization to use a permit   filed before the effective date of this Act is governed by the law   in effect on the date of filing, and that law is continued in effect   for that purpose.          SECTION 6.  This Act takes effect September 1, 2025.
Important: This plain English summary was generated by AI and is provided for informational purposes only.
It is not legal advice. Always consult the official bill text on LegiScan
or a qualified attorney for legal matters.