Plain English summary not yet available
The full original text is available below. Check back soon as we process this bill.
I
118TH CONGRESS
1ST SESSION H. R. 2750
To amend the Federal Power Act to authorize the allocation of the costs
of certain interstate electric power transmission lines and electric power
transmission lines that are located offshore, and for other purposes.
IN THE HOUSE OF REPRESENTATIVES
APRIL 20, 2023
Ms. CASTOR of Florida introduced the following bill; which was referred to the
Committee on Energy and Commerce
A BILL
To amend the Federal Power Act to authorize the allocation
of the costs of certain interstate electric power trans-
mission lines and electric power transmission lines that
are located offshore, and for other purposes.
Be it enacted by the Senate and House of Representa-
1
tives of the United States of America in Congress assembled,
2
SECTION 1. SHORT TITLE.
3
This Act may be cited as the ‘‘Enhancing Electric
4
Grid Resilience Act’’.
5
VerDate Sep 11 2014
22:14 Apr 26, 2023
Jkt 039200
PO 00000
Frm 00001
Fmt 6652
Sfmt 6201
E:\BILLS\H2750.IH
H2750
pbinns on DSKJLVW7X2PROD with $$_JOB
2
•HR 2750 IH
SEC. 2. ALLOCATION OF COSTS OF CERTAIN TRANSMISSION
1
FACILITIES.
2
Part II of the Federal Power Act (16 U.S.C. 824 et
3
seq.) is amended by adding at the end the following:
4
‘‘SEC. 224. ALLOCATION OF COSTS OF CERTAIN TRANS-
5
MISSION FACILITIES.
6
‘‘(a) ALLOCATION OF COSTS.—
7
‘‘(1) IN GENERAL.—Any entity that proposes to
8
own, control, or operate a transmission facility of
9
national significance may file a tariff with the Com-
10
mission in accordance with section 205 and the reg-
11
ulations of the Commission allocating the costs of
12
such transmission facility of national significance.
13
‘‘(2) COST CAUSATION PRINCIPLE.—The Com-
14
mission shall require that any tariff filed under
15
paragraph (1) allocate the costs of a transmission
16
facility of national significance to customers within
17
the applicable transmission planning region or re-
18
gions in a manner that is at least roughly commen-
19
surate with the estimated anticipated benefits de-
20
scribed in paragraph (3).
21
‘‘(3) COST ALLOCATION PRINCIPLE.—The Com-
22
mission shall require that any tariff filed under
23
paragraph (1) allocate costs based on the broad
24
range of reliability, economic, public policy, resil-
25
ience, and other reasonably anticipated benefits of
26
VerDate Sep 11 2014
22:14 Apr 26, 2023
Jkt 039200
PO 00000
Frm 00002
Fmt 6652
Sfmt 6201
E:\BILLS\H2750.IH
H2750
pbinns on DSKJLVW7X2PROD with $$_JOB
3
•HR 2750 IH
the applicable transmission facility of national sig-
1
nificance.
2
‘‘(b) TRANSMISSION FACILITY OF NATIONAL SIG-
3
NIFICANCE.—In this section, the term ‘transmission facil-
4
ity of national significance’ means—
5
‘‘(1) an interstate electric power transmission
6
line (and any facilities necessary for the operation of
7
such electric power transmission line) or an electric
8
power transmission line that is located offshore (and
9
any facilities necessary for the operation of such
10
electric power transmission line)—
11
‘‘(A) that has a transmission capacity of
12
not less than 1,000 megawatts; and
13
‘‘(B) the construction of which is com-
14
pleted on or after the date of enactment of this
15
section; or
16
‘‘(2) an expansion of, or upgrade to, an inter-
17
state electric power transmission line (and any facili-
18
ties necessary for the operation of such electric
19
power transmission line) or an electric power trans-
20
mission line that is located offshore (and any facili-
21
ties necessary for the operation of such electric
22
power transmission line) that—
23
VerDate Sep 11 2014
22:14 Apr 26, 2023
Jkt 039200
PO 00000
Frm 00003
Fmt 6652
Sfmt 6201
E:\BILLS\H2750.IH
H2750
pbinns on DSKJLVW7X2PROD with $$_JOB
4
•HR 2750 IH
‘‘(A) increases the transmission capacity of
1
such electric power transmission line by at least
2
500 megawatts; and
3
‘‘(B) is completed on or after the date of
4
enactment of this section.
5
‘‘(c) SAVINGS PROVISION.—This section does not af-
6
fect the authority of the Commission to approve the alloca-
7
tion of costs of transmission facilities other than trans-
8
mission facilities of national significance.’’.
9
Æ
VerDate Sep 11 2014
22:14 Apr 26, 2023
Jkt 039200
PO 00000
Frm 00004
Fmt 6652
Sfmt 6301
E:\BILLS\H2750.IH
H2750
pbinns on DSKJLVW7X2PROD with $$_JOB
Important: This plain English summary was generated by AI and is provided for informational purposes only.
It is not legal advice. Always consult the official bill text on Congress.gov
or a qualified attorney for legal matters.