I
118TH CONGRESS
1ST SESSION H. R. 2749
To facilitate the generation and delivery of power from affordable and reliable
renewable generation projects and energy storage projects.
IN THE HOUSE OF REPRESENTATIVES
APRIL 20, 2023
Ms. CASTOR of Florida (for herself, Mr. CASTEN, and Mr. PETERS) intro-
duced the following bill; which was referred to the Committee on Energy
and Commerce
A BILL
To facilitate the generation and delivery of power from af-
fordable and reliable renewable generation projects and
energy storage projects.
Be it enacted by the Senate and House of Representa-
1
tives of the United States of America in Congress assembled,
2
SECTION 1. SHORT TITLE; DEFINITIONS.
3
(a) SHORT TITLE.—This Act may be cited as the
4
‘‘Efficient Grid Interconnection Act of 2023’’.
5
(b) DEFINITIONS.—In this Act:
6
(1) COMMISSION.—The term ‘‘Commission’’
7
means the Federal Energy Regulatory Commission.
8
VerDate Sep 11 2014
22:13 Apr 26, 2023
Jkt 039200
PO 00000
Frm 00001
Fmt 6652
Sfmt 6201
E:\BILLS\H2749.IH
H2749
pbinns on DSKJLVW7X2PROD with $$_JOB
2
•HR 2749 IH
(2) ENERGY
STORAGE
PROJECT.—The term
1
‘‘energy storage project’’ means equipment which re-
2
ceives, stores, and delivers energy using batteries,
3
compressed air, pumped hydropower, hydrogen stor-
4
age (including hydrolysis), thermal energy storage,
5
regenerative fuel cells, flywheels, capacitors, super-
6
conducting magnets, or other technologies identified
7
by the Secretary of Energy, and which has a capac-
8
ity of not less than 5 kilowatt hours.
9
(3) GENERATION
PROJECT.—The term ‘‘gen-
10
eration project’’ means any facility—
11
(A) that generates electricity; and
12
(B) the interconnection request of which is
13
subject to the jurisdiction of the Commission.
14
(4) GENERATOR TIE LINE.—The term ‘‘gener-
15
ator tie line’’ means a dedicated transmission line
16
that is used to transmit power from a generation
17
project or an energy storage project to a trans-
18
mission facility or a transmission system.
19
(5) GRID ENHANCING TECHNOLOGY.—The term
20
‘‘grid enhancing technology’’ means any technology
21
or equipment that increases the capacity, efficiency,
22
or reliability of a transmission facility or trans-
23
mission system, including—
24
VerDate Sep 11 2014
22:13 Apr 26, 2023
Jkt 039200
PO 00000
Frm 00002
Fmt 6652
Sfmt 6201
E:\BILLS\H2749.IH
H2749
pbinns on DSKJLVW7X2PROD with $$_JOB
3
•HR 2749 IH
(A) power flow control and transmission
1
switching equipment;
2
(B) energy storage technology;
3
(C) topology optimization technology;
4
(D) dynamic line rating technology; and
5
(E) other advanced transmission tech-
6
nologies, such as composite reinforced alu-
7
minum conductors or high temperature super-
8
conductors.
9
(6) INTERCONNECTION CUSTOMER.—The term
10
‘‘interconnection customer’’ means a person or entity
11
that has submitted a request to interconnect a gen-
12
eration project or an energy storage project that is
13
subject to the jurisdiction of the Commission to the
14
owner or operator of a transmission facility or a
15
transmission system.
16
(7) NETWORK UPGRADE.—The term ‘‘network
17
upgrade’’ means—
18
(A) any modification of, addition to, or ex-
19
pansion of any transmission facility or trans-
20
mission system;
21
(B) the construction of a new facility that
22
will become part of a transmission system;
23
VerDate Sep 11 2014
22:13 Apr 26, 2023
Jkt 039200
PO 00000
Frm 00003
Fmt 6652
Sfmt 6201
E:\BILLS\H2749.IH
H2749
pbinns on DSKJLVW7X2PROD with $$_JOB
4
•HR 2749 IH
(C) the addition of an energy storage
1
project to a transmission facility or a trans-
2
mission system; and
3
(D) any construction, deployment, or addi-
4
tion of grid enhancing technology to a trans-
5
mission facility or a transmission system that
6
eliminates or reduces the need to carry out any
7
of the activities described in subparagraphs (A)
8
through (C).
9
(8) PARTICIPANT FUNDING.—The term ‘‘partic-
10
ipant funding’’ means any cost allocation method
11
under which an interconnection customer is required
12
to pay, without reimbursement, all or a dispropor-
13
tionate amount of the costs of a network upgrade
14
that is determined to be necessary to ensure the reli-
15
able interconnection of the interconnection cus-
16
tomer’s generation project or energy storage project.
17
(9) PUBLIC UTILITY.—The term ‘‘public util-
18
ity’’ has the meaning given such term in section
19
201(e) of the Federal Power Act (16 U.S.C. 824(e)).
20
(10) RENEWABLE GENERATION PROJECT.—The
21
term ‘‘renewable generation project’’ means a gen-
22
eration project that generates electricity from a re-
23
newable energy resource, including wind, solar, geo-
24
thermal, and hydropower.
25
VerDate Sep 11 2014
22:13 Apr 26, 2023
Jkt 039200
PO 00000
Frm 00004
Fmt 6652
Sfmt 6201
E:\BILLS\H2749.IH
H2749
pbinns on DSKJLVW7X2PROD with $$_JOB
5
•HR 2749 IH
(11) REGIONAL TRANSMISSION ORGANIZATION;
1
INDEPENDENT
SYSTEM
OPERATOR.—The
terms
2
‘‘Regional Transmission Organization’’ and ‘‘Inde-
3
pendent System Operator’’ have the meanings given
4
such terms in section 3 of the Federal Power Act
5
(16 U.S.C. 796).
6
(12)
TRANSMISSION
SYSTEM.—The
term
7
‘‘transmission system’’ means a network of trans-
8
mission facilities used for the transmission of elec-
9
tric energy in interstate commerce.
10
SEC. 2. SENSE OF CONGRESS.
11
It is the sense of Congress that—
12
(1) in much of the United States renewable
13
generation projects and energy storage projects face
14
unfair and inefficient barriers to Commission-juris-
15
dictional interconnection with the electric grid;
16
(2) legislation is needed to accelerate the timely
17
and efficient interconnection of renewable generation
18
projects and energy storage projects, and to ensure
19
that individual interconnection customers are not
20
forced to bear disproportionate amounts of shared
21
network upgrade costs;
22
(3) network upgrades required to be con-
23
structed
to
interconnect
renewable
generation
24
projects and energy storage projects benefit all
25
VerDate Sep 11 2014
22:13 Apr 26, 2023
Jkt 039200
PO 00000
Frm 00005
Fmt 6652
Sfmt 6201
E:\BILLS\H2749.IH
H2749
pbinns on DSKJLVW7X2PROD with $$_JOB
6
•HR 2749 IH
transmission system customers as well as parties
1
that receive power delivered over such transmission
2
systems;
3
(4) the practice of exclusive or disproportionate
4
participant funding, whereby the costs of network
5
upgrades are assigned solely or disproportionately to
6
individual interconnection customers, is unduly dis-
7
criminatory, harmful to consumers, and not in the
8
public interest;
9
(5) in certain cases, the deployment of grid en-
10
hancing technologies can substitute for, and thereby
11
reduce the need for, time required, or cost to con-
12
struct, a traditional transmission upgrade or addi-
13
tion, such as modifying or adding a conductor or
14
substation element, that otherwise would be required
15
to interconnect a new generation project or energy
16
storage project;
17
(6) by reducing the need for, and the time nec-
18
essary to construct, a traditional transmission up-
19
grade or addition, such as modifying or adding a
20
conductor or substation element, the deployment of
21
grid enhancing technologies would facilitate timely,
22
efficient, and cost-effective interconnections, and the
23
renewable generation projects and energy storage
24
projects dependent on those interconnections, and
25
VerDate Sep 11 2014
22:13 Apr 26, 2023
Jkt 039200
PO 00000
Frm 00006
Fmt 6652
Sfmt 6201
E:\BILLS\H2749.IH
H2749
pbinns on DSKJLVW7X2PROD with $$_JOB
7
•HR 2749 IH
the delivery of clean and reliable electricity produced
1
by those projects; and
2
(7) collectively, the development and construc-
3
tion of renewable generation projects, energy storage
4
projects, and grid enhancing technologies should cre-
5
ate tens of thousands of family-sustaining jobs, fa-
6
cilitate rural economic development, enhance Federal
7
and State tax revenues, and further the timely and
8
cost-effective delivery of clean, affordable, and reli-
9
able electricity.
10
SEC. 3. EQUITABLE COST ALLOCATION.
11
(a) IN GENERAL.—Not later than 180 days after the
12
date of enactment of this Act, the Commission shall issue
13
a new regulation, or revise existing regulations, to prohibit
14
the use of exclusive or disproportionate participant fund-
15
ing.
16
(b) ALLOCATION OF COSTS.—
17
(1) IN GENERAL.—In prohibiting the use of ex-
18
clusive or disproportionate participant funding under
19
subsection (a), the Commission shall, except as pro-
20
vided in paragraph (4), require that each public util-
21
ity—
22
(A) may not allocate the costs of a network
23
upgrade solely to the requesting interconnection
24
customer; and
25
VerDate Sep 11 2014
22:13 Apr 26, 2023
Jkt 039200
PO 00000
Frm 00007
Fmt 6652
Sfmt 6201
E:\BILLS\H2749.IH
H2749
pbinns on DSKJLVW7X2PROD with $$_JOB
8
•HR 2749 IH
(B) shall reasonably allocate such costs to
1
parties that—
2
(i) use the transmission facility or the
3
transmission system;
4
(ii) take electricity from the trans-
5
mission facility or the transmission system;
6
or
7
(iii) otherwise benefit from a network
8
upgrade of the transmission facility or the
9
transmission system.
10
(2) INTERCONNECTION
TO
MULTIPLE
TRANS-
11
MISSION SYSTEMS.—With respect to a network up-
12
grade that is associated with a generation project or
13
an energy storage project that has a significant im-
14
pact on two or more transmission systems, the costs
15
for such a network upgrade shall be allocated pursu-
16
ant to a methodology designed jointly by the im-
17
pacted transmission systems to ensure that all such
18
costs are equitably shared by the parties that benefit
19
from such network upgrade.
20
(3) DETERMINATION
OF
BENEFITTING
PAR-
21
TIES.—In determining which parties benefit for pur-
22
poses of paragraph (1)(B)(iii) and paragraph (2),
23
the Commission shall consider all material benefits
24
of the network upgrade, including—
25
VerDate Sep 11 2014
22:13 Apr 26, 2023
Jkt 039200
PO 00000
Frm 00008
Fmt 6652
Sfmt 6201
E:\BILLS\H2749.IH
H2749
pbinns on DSKJLVW7X2PROD with $$_JOB
9
•HR 2749 IH
(A) those that cannot be directly quan-
1
tified, including resilience benefits; and
2
(B) environmental benefits, including re-
3
duced and avoided emissions of greenhouse
4
gases and conventional air pollutants.
5
(4) GENERATOR TIE LINES.—A public utility
6
may require an interconnection customer to pay for
7
the costs of construction of any generator tie lines
8
that will be used to transmit power from the inter-
9
connection customer’s generation project or energy
10
storage project, as applicable, to the transmission fa-
11
cility or the transmission system.
12
(5) VOLUNTARY PAYMENT.—
13
(A) IN GENERAL.—An interconnection cus-
14
tomer may pay upfront some or all of the costs
15
of a network upgrade at the transmission facil-
16
ity or transmission system to which they plan
17
to interconnect their generation project or en-
18
ergy storage project in accordance with sub-
19
paragraph (B).
20
(B)
REPAYMENT.—Any
interconnection
21
customer that pays costs under subparagraph
22
(A) shall be refunded such costs allocable to
23
other parties pursuant to the Commission’s reg-
24
ulations issued or revised under this section,
25
VerDate Sep 11 2014
22:13 Apr 26, 2023
Jkt 039200
PO 00000
Frm 00009
Fmt 6652
Sfmt 6201
E:\BILLS\H2749.IH
H2749
pbinns on DSKJLVW7X2PROD with $$_JOB
10
•HR 2749 IH
over a period that is not longer than 10 years
1
beginning on the date on which the interconnec-
2
tion customer’s interconnection is complete.
3
(6) UPDATING PROCEDURES.—Not later than
4
the date that is 3 months after the date on which
5
the Commission issues or revises regulations as re-
6
quired under subsection (a), each public utility shall
7
make a filing pursuant to section 205 of the Federal
8
Power Act (16 U.S.C. 824d) to amend their inter-
9
connection procedures to comply with such regula-
10
tions.
11
SEC.
4.
DEPLOYMENT
OF
GRID
ENHANCING
TECH-
12
NOLOGIES.
13
Not later than 180 days after the date of enactment
14
of this Act, the Commission shall issue a new regulation,
15
or revise existing regulations, to require the following:
16
(1) CONSULTATION.—
17
(A) IN GENERAL.—With respect to proc-
18
essing a request to interconnect a generation
19
project or an energy storage project, the Re-
20
gional Transmission Organization, Independent
21
System Operator, or transmission planning co-
22
ordinator, as applicable, shall—
23
(i) consult with the relevant owner of
24
the transmission facility or transmission
25
VerDate Sep 11 2014
22:13 Apr 26, 2023
Jkt 039200
PO 00000
Frm 00010
Fmt 6652
Sfmt 6201
E:\BILLS\H2749.IH
H2749
pbinns on DSKJLVW7X2PROD with $$_JOB
11
•HR 2749 IH
system, and the interconnection customer,
1
regarding deploying grid enhancing tech-
2
nology in addition to, or as a substitute to,
3
carrying out a traditional transmission up-
4
grade or addition, such as modifying or
5
adding a conductor or substation element;
6
and
7
(ii) study the efficacy of deploying
8
grid enhancing technology for the purposes
9
described in clause (i).
10
(B) UNCONNECTED TRANSMISSION FACILI-
11
TIES.—With respect to a request to inter-
12
connect a generation project or an energy stor-
13
age project to a transmission facility that is not
14
connected to a transmission system, the owner
15
or operator of such a facility shall—
16
(i) consult with the interconnection
17
customer regarding deploying grid enhanc-
18
ing technology in addition to, or as a sub-
19
stitute to, carrying out a traditional trans-
20
mission upgrade or addition, such as modi-
21
fying or adding a conductor or substation
22
element; and
23
VerDate Sep 11 2014
22:13 Apr 26, 2023
Jkt 039200
PO 00000
Frm 00011
Fmt 6652
Sfmt 6201
E:\BILLS\H2749.IH
H2749
pbinns on DSKJLVW7X2PROD with $$_JOB
12
•HR 2749 IH
(ii) study the efficacy of deploying
1
grid enhancing technology for the purposes
2
described in clause (i).
3
(2) DEPLOYMENT.—
4
(A) IN GENERAL.—An interconnection cus-
5
tomer that is consulted with under paragraph
6
(1) may request that grid enhancing technology
7
that was the subject of such consultation be de-
8
ployed.
9
(B) DETERMINATION.—The owner of the
10
transmission facility or transmission system to
11
which such technology would be deployed shall
12
determine whether to deploy such technology,
13
subject to an appeal under subparagraph (C).
14
(C) APPEAL.—
15
(i) IN GENERAL.—An interconnection
16
customer that requests deployment of grid
17
enhancing technology under subparagraph
18
(A) may submit to the Commission a re-
19
quest for a hearing to appeal the decision
20
under subparagraph (B) to not deploy grid
21
enhancing technology.
22
(ii) EFFECT
OF
APPEAL.—Af
[Text truncated for display. Full text available on Congress.gov.]
Important: This plain English summary was generated by AI and is provided for informational purposes only.
It is not legal advice. Always consult the official bill text on Congress.gov
or a qualified attorney for legal matters.