Plain English summary not yet available
The full original text is available below. Check back soon as we process this bill.
I
118TH CONGRESS
1ST SESSION H. R. 2731
To require assessments of opportunities to install and maintain floating photo-
voltaic solar panels at Bureau of Reclamation and Corps of Engineers
projects, and for other purposes.
IN THE HOUSE OF REPRESENTATIVES
APRIL 19, 2023
Mr. TONKO (for himself and Mr. HUFFMAN) introduced the following bill;
which was referred to the Committee on Transportation and Infrastruc-
ture, and in addition to the Committee on Natural Resources, for a pe-
riod to be subsequently determined by the Speaker, in each case for con-
sideration of such provisions as fall within the jurisdiction of the com-
mittee concerned
A BILL
To require assessments of opportunities to install and main-
tain floating photovoltaic solar panels at Bureau of Rec-
lamation and Corps of Engineers projects, and for other
purposes.
Be it enacted by the Senate and House of Representa-
1
tives of the United States of America in Congress assembled,
2
SECTION 1. SHORT TITLE.
3
This Act may be cited as the ‘‘Protect Our Waters
4
and Expand Renewables on Our Reservoirs Act’’ or the
5
‘‘POWER Our Reservoirs Act’’.
6
VerDate Sep 11 2014
04:41 Apr 26, 2023
Jkt 039200
PO 00000
Frm 00001
Fmt 6652
Sfmt 6201
E:\BILLS\H2731.IH
H2731
pbinns on DSKJLVW7X2PROD with $$_JOB
2
•HR 2731 IH
SEC. 2. FLOATING SOLAR ENERGY AT RECLAMATION
1
PROJECTS.
2
(a) DEFINITIONS.—In this section:
3
(1)
COMMISSIONER.—The
term
‘‘Commis-
4
sioner’’ means the Commissioner of Reclamation.
5
(2) RECLAMATION PROJECT.—The term ‘‘Rec-
6
lamation project’’ means—
7
(A) any reclamation or irrigation project,
8
including incidental features of the project—
9
(i) that is authorized by the reclama-
10
tion laws;
11
(ii) that is constructed by the United
12
States pursuant to the reclamation laws; or
13
(iii) in connection with which there is
14
a repayment or water service contract exe-
15
cuted by the United States pursuant to the
16
reclamation laws; or
17
(B) any project constructed by the Sec-
18
retary of the Interior for the reclamation of
19
land.
20
(b) ASSESSMENT.—
21
(1) IN GENERAL.—The Commissioner, in con-
22
sultation with the Secretary of Energy and the rel-
23
evant National Laboratories of the Department of
24
Energy, shall conduct an assessment of opportuni-
25
VerDate Sep 11 2014
04:41 Apr 26, 2023
Jkt 039200
PO 00000
Frm 00002
Fmt 6652
Sfmt 6201
E:\BILLS\H2731.IH
H2731
pbinns on DSKJLVW7X2PROD with $$_JOB
3
•HR 2731 IH
ties to install and maintain floating photovoltaic
1
solar panels at Reclamation projects.
2
(2) REQUIREMENTS.—In conducting the assess-
3
ment under paragraph (1), the Commissioner
4
shall—
5
(A) determine the economic, environ-
6
mental, and technical feasibility of installing
7
and maintaining, or contracting with third par-
8
ties to install and maintain, photovoltaic solar
9
panels at Reclamation projects;
10
(B)(i) identify Reclamation projects with a
11
high potential for the installation and mainte-
12
nance of floating photovoltaic solar panels, in-
13
cluding which Reclamation projects are likely to
14
have high cobenefits; and
15
(ii) determine whether the installation and
16
maintenance at Reclamation projects identified
17
under clause (i) would require additional au-
18
thorization;
19
(C) account for potential effects and bene-
20
fits on Reclamation projects and the authorized
21
purposes of the Reclamation projects of install-
22
ing and maintaining floating photovoltaic solar
23
panels at the Reclamation projects, including—
24
(i) evaporation suppression;
25
VerDate Sep 11 2014
04:41 Apr 26, 2023
Jkt 039200
PO 00000
Frm 00003
Fmt 6652
Sfmt 6201
E:\BILLS\H2731.IH
H2731
pbinns on DSKJLVW7X2PROD with $$_JOB
4
•HR 2731 IH
(ii) energy yield;
1
(iii) dam safety;
2
(iv) recreation;
3
(v) water quality; and
4
(vi) fish and wildlife;
5
(D) account for potential damage to float-
6
ing photovoltaic solar panels from—
7
(i) weather;
8
(ii) water-level fluctuations; and
9
(iii) recreational and other uses of the
10
Reclamation projects;
11
(E)(i) identify methods to monetarily
12
quantify cobenefits of floating photovoltaic solar
13
panel projects; and
14
(ii) identify mechanisms to pass those ben-
15
efits to project developers, and assess whether
16
the use of such mechanisms may increase the
17
viability of floating photovoltaic solar panel
18
projects; and
19
(F) account for the availability of electric
20
grid
infrastructure
close
to
Reclamation
21
projects, including underutilized transmission
22
infrastructure.
23
(3) REPORT TO CONGRESS.—Not later than 18
24
months after the date of enactment of this Act, the
25
VerDate Sep 11 2014
04:41 Apr 26, 2023
Jkt 039200
PO 00000
Frm 00004
Fmt 6652
Sfmt 6201
E:\BILLS\H2731.IH
H2731
pbinns on DSKJLVW7X2PROD with $$_JOB
5
•HR 2731 IH
Commissioner shall submit to Congress and make
1
publicly available (including on a publicly available
2
website) a report describing the results of the assess-
3
ment conducted under paragraph (1).
4
(c) PILOT PROGRAM.—
5
(1) IN GENERAL.—Not later than 2 years after
6
the date of enactment of this Act, if the Commis-
7
sioner determines, based on the results of the assess-
8
ment conducted under subsection (b), that estab-
9
lishing a pilot program is advisable, the Commis-
10
sioner shall establish a pilot program under which
11
the Commissioner, or an applicable non-Federal en-
12
tity that is acting in partnership with the Commis-
13
sioner, subject to paragraph (2), shall carry out
14
projects to deploy floating photovoltaic solar panels
15
at Reclamation projects identified under subsection
16
(b)(2)(B).
17
(2) REQUIREMENTS.—To be eligible to carry
18
out a project under paragraph (1), a non-Federal
19
entity shall—
20
(A) agree to invest in and deploy floating
21
photovoltaic solar panels at the applicable Rec-
22
lamation project; and
23
(B) have the authority to enter into agree-
24
ments, including through public-private partner-
25
VerDate Sep 11 2014
04:41 Apr 26, 2023
Jkt 039200
PO 00000
Frm 00005
Fmt 6652
Sfmt 6201
E:\BILLS\H2731.IH
H2731
pbinns on DSKJLVW7X2PROD with $$_JOB
6
•HR 2731 IH
ships, for the purpose of carrying out the appli-
1
cable project under that paragraph.
2
(3) FEDERAL SHARE.—The Federal share of
3
the cost of carrying out a project under paragraph
4
(1)—
5
(A) shall not exceed 100 percent, in the
6
case of a project carried out by the Commis-
7
sioner; and
8
(B) shall not exceed 50 percent, in the
9
case of a project carried out by a non-Federal
10
entity, acting in partnership with the Commis-
11
sioner.
12
(d) AUTHORIZATION OF APPROPRIATIONS.—There is
13
authorized to be appropriated to the Commissioner to
14
carry out this section $12,000,000 for fiscal year 2024,
15
to remain available until expended.
16
(e) NO EFFECT ON PROJECT PURPOSES.—Nothing
17
in this section affects the authorized purposes of a Rec-
18
lamation project.
19
SEC. 3. FLOATING SOLAR ENERGY AT CORPS OF ENGI-
20
NEERS PROJECTS.
21
(a) DEFINITIONS.—In this section:
22
(1) CORPS OF ENGINEERS PROJECT.—The term
23
‘‘Corps of Engineers project’’ means any water re-
24
sources development project—
25
VerDate Sep 11 2014
04:41 Apr 26, 2023
Jkt 039200
PO 00000
Frm 00006
Fmt 6652
Sfmt 6201
E:\BILLS\H2731.IH
H2731
pbinns on DSKJLVW7X2PROD with $$_JOB
7
•HR 2731 IH
(A) constructed by the Secretary; or
1
(B) for which the Secretary has financial
2
or operational responsibility.
3
(2) SECRETARY.—The term ‘‘Secretary’’ means
4
the Secretary of the Army.
5
(b) SUSTAINABILITY REPORTS.—Beginning not later
6
than 2 years after the date of enactment of this Act, the
7
Secretary shall include renewable energy from floating
8
photovoltaic solar panels as part of any sustainability re-
9
port and implementation plan of the Corps of Engineers.
10
(c) PILOT PROGRAM.—
11
(1) IN GENERAL.—Not later than 2 years after
12
the date of enactment of this Act, if supported by
13
the results of the assessment conducted under sub-
14
section (a) of section 8232 of the Water Resources
15
Development Act of 2022 (Public Law 117–263),
16
the Secretary shall establish a pilot program for the
17
deployment of floating photovoltaic solar panels at
18
Corps of Engineers projects identified under para-
19
graph (2)(B) of that subsection under which the
20
Secretary or an applicable non-Federal interest—
21
(A) agrees to invest in and deploy floating
22
photovoltaic solar panels; and
23
VerDate Sep 11 2014
04:41 Apr 26, 2023
Jkt 039200
PO 00000
Frm 00007
Fmt 6652
Sfmt 6201
E:\BILLS\H2731.IH
H2731
pbinns on DSKJLVW7X2PROD with $$_JOB
8
•HR 2731 IH
(B) may enter into agreements, including
1
through public-private partnerships, for the
2
purpose of carrying out such activities.
3
(2) COST SHARE.—The Federal share of the
4
cost of a project carried out under this subsection
5
shall be—
6
(A) not more than 100 percent, in the case
7
of a project carried out by the Secretary; and
8
(B) not more than 50 percent, in the case
9
of a project carried out by a non-Federal inter-
10
est.
11
(d) FUNDING.—
12
(1) IN
GENERAL.—The Secretary shall carry
13
out this section using amounts made available to the
14
Secretary to carry out section 8232 of the Water
15
Resources Development Act of 2022 (Public Law
16
117–263) that are not otherwise obligated.
17
(2) AUTHORIZATION OF APPROPRIATIONS.—In
18
addition to amounts made available under paragraph
19
(1), there is authorized to be appropriated to the
20
Secretary to carry out this section $2,000,000 for
21
fiscal year 2024, to remain available until expended.
22
VerDate Sep 11 2014
04:41 Apr 26, 2023
Jkt 039200
PO 00000
Frm 00008
Fmt 6652
Sfmt 6201
E:\BILLS\H2731.IH
H2731
pbinns on DSKJLVW7X2PROD with $$_JOB
9
•HR 2731 IH
(e) NO EFFECT ON PROJECT PURPOSES.—Nothing
1
in this section affects the authorized purposes of a Corps
2
of Engineers project.
3
Æ
VerDate Sep 11 2014
04:41 Apr 26, 2023
Jkt 039200
PO 00000
Frm 00009
Fmt 6652
Sfmt 6301
E:\BILLS\H2731.IH
H2731
pbinns on DSKJLVW7X2PROD with $$_JOB
Important: This plain English summary was generated by AI and is provided for informational purposes only.
It is not legal advice. Always consult the official bill text on Congress.gov
or a qualified attorney for legal matters.