AB502 - Revises provisions relating to public works. (BDR 28-401)
Source: LegiScan ·
5,519 words in original text
Plain English summary not yet available
The full original text is available below. Check back soon as we process this bill.
-
83rd Session (2025)
Assembly Bill No. 502–Committee
on Government Affairs
CHAPTER..........
AN ACT relating to public works; revising provisions relating to the
compliance of a contractor or subcontractor with certain
requirements relating to apprentices on a public work;
revising requirements relating to identifying numbers for
public works; revising provisions relating to the imposition
of penalties for certain violations; revising provisions relating
to the period within which a person is disqualified from being
awarded a contract for a public work in certain
circumstances;
revising
provisions
relating
to
the
investigation of certain possible violations; creating the
Public Works Compliance Division within the Office of
Labor Commissioner and prescribing its duties; providing a
penalty; and providing other matters properly relating thereto.
Legislative Counsel’s Digest:
Existing law sets forth the requirements for the State and its political
subdivisions to award a contract for the new construction, repair or reconstruction
of specified projects that are financed in whole or in part from public money,
known as public works. (Chapter 338 of NRS) Existing law creates the Office of
Labor Commissioner and requires the Labor Commissioner to enforce specified
provisions relating to employment on public works. (NRS 338.010-338.130,
607.010) Existing law requires contractors or subcontractors engaged on public
works to use apprentices for a certain percentage of the total hours performed on a
public work, depending on certain conditions related to the public work, and to
report certain information regarding the public works for the previous year to the
Labor Commissioner, except identifying information about a public work or an
apprentice or employee. Existing law further requires a contractor or subcontractor
on a public work to maintain and provide to the Labor Commissioner any
supporting documentation to show that the contractor or subcontractor made a good
faith effort to comply with the apprenticeship requirement. Such a good faith effort
includes submitting to an apprenticeship program a request for an apprentice: (1)
not earlier than 10 days before the contractor or subcontractor is scheduled to begin
work on the public work; and (2) if a contractor or subcontractor does not work
continuously on a public work, not earlier than 10 days before the contractor or
subcontractor is scheduled to resume work on the public work. (NRS 338.01165)
Section 1 of this bill increases the 10-day time limitation on requesting an
apprentice to 30 days. Section 1 also removes the exception for not reporting
identifying information about a public work, thereby requiring the reporting of such
information to the Labor Commissioner.
Existing law, in part, requires a public body that undertakes a public work to:
(1) request an identifying number with a designation of the work and include the
number in any advertisement or other type of solicitation; and (2) report to the
Labor Commissioner the award of a contract within 10 days after the award and
subsequently report the completion of the work under the contract. (NRS 338.013)
Section 2 of this bill requires that a public body request such an identifying number
not less than 3 business days before any advertisement or other type of solicitation
– 2 –
-
83rd Session (2025)
for the public work is published or made, as applicable. Section 2 also authorizes a
penalty for each calendar day or portion thereof that a public body is not in
compliance with the reporting requirements.
Under existing law, if an administrative penalty is imposed against a person for
a violation of certain provisions relating to public works, the Labor Commissioner
is authorized to prohibit the person from being awarded a contract for a public
work: (1) for the first offense, for a period of 3 years after the date of the imposition
of the administrative penalty; and (2) for the second or subsequent offense, for a
period of 5 years after the date of the imposition of the administrative penalty.
(NRS 338.017) Section 4 of this bill revises the duration of the period of the
disqualification as follows: (1) for the first offense, for a period of up to 180 days
after the date of the imposition of the administrative penalty; (2) for the second
offense, for a period of up to 3 years but not less than 180 days after the date of the
imposition of the administrative penalty; (3) for the third offense, for a period of up
to 5 years but not less than 3 years after the date of the imposition of the
administrative penalty; and (4) for the fourth or subsequent offense, for a period of
not less than 5 years after the date of the imposition of the administrative penalty.
Existing law requires any public body awarding a contract for a public work to
investigate possible violations of certain laws relating to public works and
determine whether a violation has been committed and inform the Labor
Commissioner of any such violations. (NRS 338.070) Section 5 of this bill requires
a public body, within 90 days after substantial completion of a contract for a public
work, to: (1) conduct an investigation and make a determination regarding any
violation; or (2) refer the matter to the Public Works Compliance Division, which is
created within the Office of Labor Commissioner in section 8 of this bill. Section 7
of this bill requires the Division to: (1) investigate possible violations of certain
laws relating to public works at the direction of the Labor Commissioner or upon
receipt of a referral from a public body; (2) submit to the Labor Commissioner a
written report concerning such an investigation and, if applicable, provide a copy of
the report to the referring public body upon completion of the investigation; and (3)
perform any other duties related to the enforcement of certain provisions relating to
public works, as directed by the Labor Commissioner. Sections 9 and 10 of this
bill make conforming changes related to the creation of the Division.
Existing law requires a public body to withhold and retain from payments to a
contractor on a public work sums that are forfeited as a result of the violation of
certain laws relating to public works. Existing law also prohibits any sums from
being withheld, retained or forfeited, except from the final payment, without a full
investigation being made by the awarding public body. (NRS 338.070) Section 5
requires a public body who refers the investigation of possible offenses to the
Division to withhold and retain all sums believed to be forfeited by the violation of
such laws until an investigation has been completed by the Division and the Labor
Commissioner has determined if any violations were committed. Section 5
authorizes the Labor Commissioner to impose against a public body that fails to
investigate possible violations of certain laws relating to a public work or refer
possible violations to the Public Works Compliance Division within the prescribed
time period: (1) a fee of $1,000 for each contractor or subcontractor found to be in
violation of such provisions; and (2) an administrative penalty of $2,000 for each
contractor or subcontractor found to be in violation of such provisions. Section 5
also prohibits a public body from withholding from any contractor or subcontractor
engaged on a public work any amount due to the contractor or subcontractor in
order to recover any fee or penalty assessed against the public body by the Labor
Commissioner pursuant to section 5.
– 3 –
-
83rd Session (2025)
EXPLANATION – Matter in bolded italics is new; matter between brackets [omitted material] is material to be omitted.
THE PEOPLE OF THE STATE OF NEVADA, REPRESENTED IN
SENATE AND ASSEMBLY, DO ENACT AS FOLLOWS:
Section 1. NRS 338.01165 is hereby amended to read as
follows:
338.01165 1. Notwithstanding any other provision of this
chapter and except as otherwise provided in this section, a
contractor or subcontractor engaged in vertical construction who
employs workers on one or more public works during a calendar
year pursuant to NRS 338.040 shall use one or more apprentices for
at least 10 percent, or any increased percentage established pursuant
to subsection 3, of the total hours of labor worked for each
apprenticed craft or type of work to be performed on those public
works.
2. Notwithstanding any other provision of this chapter and
except as otherwise provided in this section, a contractor or
subcontractor engaged in horizontal construction who employs
workers on one or more public works during a calendar year
pursuant to NRS 338.040 shall use one or more apprentices for at
least 3 percent, or any increased percentage established pursuant to
subsection 3, of the total hours of labor worked for each apprenticed
craft or type of work to be performed on those public works.
3. On or after January 1, 2021, the Labor Commissioner, in
collaboration with the State Apprenticeship Council, may adopt
regulations to increase the percentage of total hours of labor
required to be performed by an apprentice pursuant to subsection 1
or 2 by not more than 2 percentage points.
4. An apprentice who graduates from an apprenticeship
program while employed on a public work shall:
(a) Be deemed an apprentice on the public work for the purposes
of subsections 1 and 2.
(b) Be deemed a journeyman for all other purposes, including,
without limitation, the payment of wages or the payment of wages
and benefits to a journeyman covered by a collective bargaining
agreement.
5. If a contractor or subcontractor who is a signatory to a
collective bargaining agreement with a union that sponsors an
apprenticeship program for an apprenticed craft or type of work for
which the term of apprenticeship is not more than 3 years requests
an apprentice from that apprenticeship program and an apprentice in
the appropriate craft or type of work is not available, the contractor
– 4 –
-
83rd Session (2025)
or subcontractor may utilize a person who graduated from the
apprenticeship program in that craft or type of work within the 3
years immediately preceding the request from the contractor or
subcontractor. Such a person:
(a) Shall be deemed an apprentice on the public work for the
purposes of subsections 1 and 2.
(b) Shall be deemed a journeyman for all other purposes,
including, without limitation, the payment of wages and benefits to
a journeyman pursuant to the collective bargaining agreement.
6. A contractor or subcontractor engaged on a public work is
not required to use an apprentice in a craft or type of work
performed in a jurisdiction recognized by the State Apprenticeship
Council as not having apprentices in that craft or type of work.
7. A contractor or subcontractor engaged on a public work
shall maintain and provide to the Labor Commissioner any
supporting documentation to show that the contractor or
subcontractor made a good faith effort to comply with subsection 1
or 2, as applicable, as determined by the Labor Commissioner. For
purposes of this subsection, a contractor or subcontractor:
(a) Makes a good faith effort to comply with subsection 1 or 2,
as applicable, if the contractor or subcontractor:
(1) Submits to the apprenticeship program, on the form
prescribed by the Labor Commissioner, a request for an apprentice
not earlier than [10] 30 days before the contractor or subcontractor
is scheduled to begin work on the public work and not later than 5
days after the contractor or subcontractor actually begins work on
the public work.
(2) If the apprenticeship program does not provide an
apprentice for the appropriate apprenticed craft or type of work
upon a request pursuant to subparagraph (1), submits additional
requests to the apprenticeship program, on the form prescribed by
the Labor Commissioner, at least once every 30 days during the
period that the contractor or subcontractor is working on the public
work. If a contractor or subcontractor does not work continuously
on the public work, the contractor or subcontractor shall submit an
additional request each time that the contractor or subcontractor
resumes work on the public work not earlier than [10] 30 days
before the contractor or subcontractor is scheduled to resume work
on the public work and not later than 5 days after the contractor or
subcontractor actually resumes work on the public work. The
requirement for the submission of an additional request in this
subparagraph does not apply whenever a contractor or subcontractor
– 5 –
-
83rd Session (2025)
has one or more apprentices employed for that apprenticed craft or
type of work.
(b) Does not make a good faith effort to comply with subsection
1 or 2, as applicable, as determined by the Labor Commissioner, if
the contractor or subcontractor is required to enter into an
apprenticeship agreement pursuant to subsection 16 and refuses to
do so.
8. The supporting documentation required pursuant to
subsection 7 may include, without limitation:
(a) Documentation of the submission by the contractor or
subcontractor of one or more requests, as applicable, pursuant to
subsection 7; and
(b) Documentation that the apprenticeship program denied such
a request, did not respond to such a request or responded that the
program was unable to provide the requested apprentice.
9. The contractor or subcontractor and the apprenticeship
program shall coordinate the starting date for any apprentice
provided by the program.
10. On or before February 15 of each year, a contractor or
subcontractor engaged in vertical or horizontal construction, as
applicable, who employs a worker on one or more public works
pursuant to NRS 338.040 shall report to the Labor Commissioner,
on the form prescribed by the Labor Commissioner, the following
information regarding those public works for the previous calendar
year:
(a) For each apprenticed craft or type of work, the total number
of hours worked on vertical construction.
(b) For each apprenticed craft or type of work, the total number
of hours worked on horizontal construction.
(c) For each apprenticed craft or type of work, the total number
of hours worked by apprentices on vertical construction.
(d) For each apprenticed craft or type of work, the total number
of hours worked by apprentices on horizontal construction.
(e) For each apprenticed craft or type of work, the percentage of
the total number of hours worked on vertical construction that were
worked by apprentices.
(f) For each apprenticed craft or type of work, the percentage of
the total number of hours worked on horizontal construction that
were worked by apprentices.
[Text truncated for display. Full text available on LegiScan.]
Important: This plain English summary was generated by AI and is provided for informational purposes only.
It is not legal advice. Always consult the official bill text on LegiScan
or a qualified attorney for legal matters.