Nevada
AB109
AB109 - Revises provisions relating to water. (BDR 48-212)
Source: LegiScan ·
2,716 words in original text
Plain English summary not yet available
The full original text is available below. Check back soon as we process this bill.
REQUIRES TWO-THIRDS MAJORITY VOTE
(§§ 1, 3, 6, 8 & NRS 533.435)
A.B. 109
-
*AB109*
ASSEMBLY BILL NO. 109–ASSEMBLYMEMBER LA RUE HATCH
PREFILED JANUARY 22, 2025
____________
Referred to Committee on Natural Resources
SUMMARY—Revises provisions relating to water. (BDR 48-212)
FISCAL NOTE: Effect on Local Government: No.
Effect on the State: Yes.
~
EXPLANATION – Matter in bolded italics is new; matter between brackets [omitted material] is material to be omitted.
AN ACT relating to water; revising provisions governing the
appropriation of water for geothermal wells or dissolved
mineral resources; and providing other matters properly
relating thereto.
Legislative Counsel’s Digest:
Existing law provides that, with certain exceptions, the consumptive use of
1
water brought to the surface outside of a geothermal well is subject to the
2
procedures governing the appropriation of water, except for: (1) water removed
3
from an aquifer or geothermal reservoir to develop and obtain geothermal resources
4
if the water is returned to or reinjected into the same aquifer or reservoir; and (2)
5
the reasonable loss of water under certain circumstances. (NRS 534A.040) Section
6
1 of this bill instead provides that any consumptive or nonconsumptive use of water
7
brought to the surface to develop and obtain geothermal resources is subject to
8
these procedures. Section 1 also removes the exception for water removed from an
9
aquifer or geothermal reservoir and instead creates an exception for water used for
10
an exploratory well.
11
Existing law provides that, with certain exceptions, the owner of real property
12
owns the rights to the underlying geothermal resources. (NRS 534A.050) Section 2
13
of this bill clarifies that underground waters belong to the public and the use of
14
such waters for the development of geothermal resources is subject to existing state
15
laws governing the appropriation of water.
16
Existing law requires a person to obtain a permit from the Administrator of the
17
Division of Minerals of the Commission on Mineral Resources and comply with
18
the conditions of the permit before he or she may drill or operate a geothermal well
19
or drill an exploratory well. (NRS 534A.060) Sections 3 and 4 of this bill require a
20
person to obtain a permit to appropriate water from the State Engineer before he or
21
she may drill or operate such a well, if the well uses water that is subject to the
22
procedures governing the appropriation of water.
23
Existing law provides that ownership of dissolved mineral resources is
24
determined by the applicable federal and state laws and regulations. (NRS
25
534B.010) Section 5 of this bill clarifies that underground waters containing
26
– 2 –
-
*AB109*
dissolved mineral resources belong to the public and are subject to state laws
27
governing the appropriation of water.
28
Existing law exempts from the procedures governing the appropriation of water
29
the reasonable loss of water of not more than 5 acre-feet during the testing and
30
sampling of water pumped within a dissolved mineral resource exploration project.
31
(NRS 534B.110) Existing law also requires a person seeking to drill a dissolved
32
mineral resource exploration well to obtain a permit from the Administrator. (NRS
33
534B.080) Section 6 of this bill requires that, upon receipt of an application for
34
such a permit, the Administrator must transmit the application to the State Engineer
35
for review. If the State Engineer determines that the application may interfere with
36
existing rights or protectable interests in existing domestic wells or threaten the
37
public interest, section 6 requires the applicant to obtain a permit to appropriate
38
water before he or she may proceed with the application. Section 8 of this bill
39
provides that this requirement is an exception to the exemption for the reasonable
40
loss of water of not more than 5 acre-feet.
41
Existing law requires, with certain exceptions, the Administrator to approve or
42
reject an application to drill a dissolved mineral resource exploration well within 30
43
days after receiving the application. (NRS 534B.090) Section 7 of this bill provides
44
an exception from this requirement if the State Engineer requires the applicant to
45
obtain a permit to appropriate water.
46
THE PEOPLE OF THE STATE OF NEVADA, REPRESENTED IN
SENATE AND ASSEMBLY, DO ENACT AS FOLLOWS:
Section 1. NRS 534A.040 is hereby amended to read as
1
follows:
2
534A.040 A consumptive or nonconsumptive use of water
3
brought to the surface [outside of a] to develop and obtain
4
geothermal [well] resources is subject to the appropriation
5
procedures of chapters 533 and 534 of NRS, except for:
6
1. Water [that is removed from an aquifer or geothermal
7
reservoir to develop and obtain geothermal resources if the water is
8
returned to or reinjected into the same aquifer or reservoir;] used in
9
an exploratory well; or
10
2. The reasonable loss of water:
11
(a) During a test of a geothermal well; or
12
(b) From the temporary failure of all or part of a system that
13
removes water from an aquifer or geothermal reservoir, transfers the
14
heat from that water and reinjects that water into the same aquifer or
15
reservoir.
16
Sec. 2. NRS 534A.050 is hereby amended to read as follows:
17
534A.050 1. The owner of real property owns the rights to
18
the underlying geothermal resources unless they have been reserved
19
by or conveyed to another person.
20
2. In
accordance
with
NRS
533.025
and
534.020,
21
underground waters belong to the public and the use of such
22
underground waters for the development of geothermal resources
23
– 3 –
-
*AB109*
is subject to appropriation for beneficial use only under the laws
1
of this State.
2
Sec. 3. NRS 534A.060 is hereby amended to read as follows:
3
534A.060 1. A person may not drill or operate a geothermal
4
well or drill an exploratory well without obtaining [a] :
5
(a) A permit from the Administrator of the Division of Minerals
6
of the Commission on Mineral Resources ; and
7
(b) Except as otherwise provided in NRS 534A.040, a permit to
8
appropriate water from the State Engineer in accordance with the
9
requirements of chapters 533 and 534 of NRS,
10
and complying with the conditions of [the] each permit.
11
2. An application for a permit from the Administrator of the
12
Division of Minerals required pursuant to paragraph (a) of
13
subsection 1 must set forth such information as the Administrator
14
requires by regulation.
15
Sec. 4. NRS 534A.070 is hereby amended to read as follows:
16
534A.070 1. The Administrator of the Division of Minerals
17
of the Commission on Mineral Resources shall approve or reject an
18
application for a permit to drill an exploratory well within 10 days
19
after the Administrator receives the application in proper form. The
20
permit must not be effective for more than 2 years, but may be
21
extended by the Administrator.
22
2. Upon receipt of an application for a permit to drill or operate
23
a geothermal well, the Administrator of the Division of Minerals
24
shall transmit copies of the application to the State Engineer, the
25
Administrator of the Division of Environmental Protection of the
26
State Department of Conservation and Natural Resources, and
27
the Director of the Department of Wildlife. After consultation with
28
the State Engineer, the Administrator of the Division of
29
Environmental Protection, and the Director of the Department of
30
Wildlife, the Administrator of the Division of Minerals may issue a
31
permit to drill or operate a geothermal well if [it] :
32
(a) It is determined that issuance of a permit is consistent with:
33
[(a)] (1) The policies specified in NRS 445A.305 and
34
445B.100;
35
[(b)] (2) The [purposes] requirements of chapters 533 and 534
36
of NRS; and
37
[(c)] (3) The purposes specified in chapter 501 of NRS [.] ; and
38
(b) Except as otherwise provided in NRS 534A.040, the State
39
Engineer has issued a permit to appropriate water.
40
3. The Administrator of the Division of Minerals shall approve
41
or reject the application to drill or operate a geothermal well within
42
90 days after the Administrator receives it in proper form, unless it
43
is determined that a conflict exists pursuant to subsection 2 or a
44
public hearing is necessary pursuant to subsection 4. Notice of the
45
– 4 –
-
*AB109*
conflict or need for a public hearing must be provided to the
1
applicant within the 90-day period.
2
4. The State Engineer and the Administrator of the Division of
3
Minerals may hold public hearings jointly or separately to gather
4
such evidence or information as they deem necessary for a full
5
understanding of all the rights involved and to guard properly the
6
public interest.
7
5. A permit issued pursuant to this section must include any
8
conditions:
9
(a) Deemed necessary by the Administrator of the Division of
10
Minerals to carry out the purposes of this section; and
11
(b) Imposed by the State Engineer consistent with the provisions
12
of chapters 533 and 534 of NRS.
13
Sec. 5. NRS 534B.010 is hereby amended to read as follows:
14
534B.010 1. The
provisions
of
this
chapter
govern
15
exploration for dissolved mineral resources.
16
2. Ownership of dissolved mineral resources is determined by
17
the applicable federal and state laws or regulations. In accordance
18
with NRS 533.025 and 534.020, underground waters containing
19
dissolved mineral resources belong to the public and are subject to
20
appropriation for beneficial use only under the laws of this State.
21
3. Except as expressly provided, nothing in this chapter shall
22
be construed to abrogate the provisions of chapter 445A, 519A, 533,
23
534 or 534A of NRS.
24
Sec. 6. NRS 534B.080 is hereby amended to read as follows:
25
534B.080 1. A person may not drill a dissolved mineral
26
resource exploration well without first obtaining a permit from the
27
Administrator and complying with the conditions of the permit.
28
2. To obtain a permit to drill a dissolved mineral resource
29
exploration well, a person must submit an application for a permit to
30
the Administrator in the form and containing such information as
31
prescribed by the Administrator in accordance with regulations
32
adopted pursuant to this chapter.
33
3. An application submitted pursuant to subsection 2 must
34
include:
35
(a) The location, design and expected depth of the well;
36
(b) The materials of construction for the well;
37
(c) The status of the land on which the well will be constructed;
38
(d) A plan for monitoring the well and a plan for plugging and
39
abandoning the well in accordance with any regulations adopted
40
pursuant to this chapter;
41
(e) A plan for managing any fluids generated as part of testing
42
or sampling, which must include, without limitation, a description of
43
how the fluids will be managed in accordance with the requirements
44
of chapter 445A of NRS and as required by the Division of
45
– 5 –
-
*AB109*
Environmental Protection of the State Department of Conservation
1
and Natural Resources; and
2
(f) Any other reporting, information or analysis necessary to
3
prevent the migration of fluids between aquifers and the degradation
4
of the water quality in accordance with any regulations adopted
5
pursuant to this chapter.
6
4. Upon receipt of an application submitted pursuant to
7
subsection 2, the Administrator shall transmit a copy of the
8
application to the State Engineer for review. If the State Engineer
9
determines that a dissolved mineral resource exploration well or a
10
dissolved mineral resource exploration borehole may impact
11
existing rights or protectable interests in existing domestic wells or
12
prove detrimental to the public interest, the State Engineer shall
13
require that the applicant obtain a permit to appropriate water in
14
accordance with the requirements of chapters 533 and 534 of
15
NRS.
16
5. In addition to any other requirement of this section, a
17
dissolved mineral resource exploration well or a dissolved mineral
18
resource exploration borehole must be drilled by a person who is
19
licensed to drill wells pursuant to NRS 534.140.
20
[5.] 6. The issuance of a permit pursuant to NRS 534B.090
21
does not authorize a person to produce dissolved mineral resources
22
without a water right.
23
Sec. 7. NRS 534B.090 is hereby amended to read as follows:
24
534B.090 1. The Administrator shall approve or reject an
25
application for a permit to drill a dissolved mineral resource
26
exploration well within 30 days after the Administrator receives an
27
application in proper form, unless [the] :
28
(a) The Administrator determines that the application conflicts
29
with the requirements of NRS 445A.300 to 445A.730, inclusive,
30
and any regulations adopted pursuant thereto, or any other laws and
31
regulations administered by the Division of Environmental
32
Protection of the State Department of Conservation and Natural
33
Resources [.] ; or
34
(b) The State Engineer requires the applicant to obtain a
35
permit to appropriate water pursuant to NRS 534B.080.
36
2. A permit issued pursuant to this section must not be
37
effective for more than 2 years, but may be extended one time by
38
the Administrator for an additional 2 years if he or she determines
39
that the permit complies with the requirements of this chapter and
40
any regulations adopted pursuant thereto.
41
3. The Administrator and the State Engineer may hold public
42
hearings jointly or separately to gather such evidence or information
43
as they deem necessary for a full understanding of all the rights
44
involved and to properly guard the public interest. The
45
– 6 –
-
*AB109*
Administrator and the State Engineer, as applicable, must notify
1
the applicant [, the State Engineer] and the Administrator of the
2
Division of Environmental Protection of the State Department of
3
Conservation and Natural Resources in advance of any hearing held
4
pursuant to this section.
5
4. A permit issued pursuant to this section must include any
6
conditions and reporting requirements deemed necessary by the
7
Administrator.
8
5. The holder of any permit issued pursuant to this section must
9
comply with the requirements of NRS 4
[Text truncated for display. Full text available on LegiScan.]
Important: This plain English summary was generated by AI and is provided for informational purposes only.
It is not legal advice. Always consult the official bill text on LegiScan
or a qualified attorney for legal matters.