H. R. 7406
To streamline nuclear technology regulatory permitting and licensing, and
for other purposes.
IN THE HOUSE OF REPRESENTATIVES
JUNE 29, 2020
Mr. KINZINGER introduced the following bill; which was referred to the
Committee on Energy and Commerce
A BILL
To streamline nuclear technology regulatory permitting and
licensing, and for other purposes.
Be it enacted by the Senate and House of Representa-
1
tives of the United States of America in Congress assembled,
2
SECTION 1. SHORT TITLE.
3
This Act may be cited as the ‘‘Nuclear Licensing Ef-
4
ficiency Act’’.
5
SEC. 2. STREAMLINING APPLICATION AND SITE PERMIT
6
REVIEWS.
7
Section 185 of the Atomic Energy Act of 1954 (42
8
U.S.C. 2235) is amended by adding at the end the fol-
9
lowing:
10
VerDate Sep 11 2014
22:46 Jul 22, 2020
Jkt 099200
PO 00000
Frm 00001
Fmt 6652
Sfmt 6201
E:\BILLS\H7406.IH
H7406
kjohnson on DSK79L0C42PROD with BILLS
2
•HR 7406 IH
‘‘c. APPLICATION REVIEWS FOR NUCLEAR ENERGY
1
PROJECTS.—
2
‘‘(1) STREAMLINING LICENSE APPLICATION RE-
3
VIEW.—With respect to an application that is dock-
4
eted seeking issuance of a construction permit, oper-
5
ating license, or combined construction permit and
6
operating license for a production or utilization facil-
7
ity, the Commission shall include the following pro-
8
cedures:
9
‘‘(A) Undertake an environmental review
10
process and issue any draft environmental im-
11
pact statement to the maximum extent prac-
12
ticable within 24 months after the application is
13
accepted for docketing.
14
‘‘(B) Complete the technical review process
15
and issue any safety evaluation report and any
16
final environmental impact statement to the
17
maximum extent practicable within 42 months
18
after the application is accepted for docketing.
19
‘‘(2) EARLY SITE PERMIT.—
20
‘‘(A) SUPPLEMENTAL ENVIRONMENTAL IM-
21
PACT STATEMENT.—In a proceeding for a com-
22
bined construction permit and operating license
23
for a site for which an early site permit has
24
been issued, any environmental impact state-
25
VerDate Sep 11 2014
22:46 Jul 22, 2020
Jkt 099200
PO 00000
Frm 00002
Fmt 6652
Sfmt 6201
E:\BILLS\H7406.IH
H7406
kjohnson on DSK79L0C42PROD with BILLS
3
•HR 7406 IH
ment prepared by the Commission and cooper-
1
ating agencies shall be prepared as a supple-
2
ment to the environmental impact statement
3
prepared for the early site permit.
4
‘‘(B) INCORPORATION
BY
REFERENCE.—
5
The supplemental environmental impact state-
6
ment shall—
7
‘‘(i) incorporate by reference the anal-
8
ysis, findings, and conclusions from the en-
9
vironmental impact statement prepared for
10
the early site permit; and
11
‘‘(ii) include additional discussion,
12
analyses, findings, and conclusions on mat-
13
ters resolved in the early site permit pro-
14
ceeding only to the extent necessary to ad-
15
dress information that is new and signifi-
16
cant in that the information would materi-
17
ally change the prior findings or conclu-
18
sions.
19
‘‘(3) PRODUCTION
OR
UTILIZATION
FACILITY
20
LOCATED AT AN EXISTING SITE.—In reviewing an
21
application for an early site permit, construction
22
permit, operating license, or combined construction
23
permit and operating license for a production or uti-
24
lization facility located at the site of a licensed pro-
25
VerDate Sep 11 2014
22:46 Jul 22, 2020
Jkt 099200
PO 00000
Frm 00003
Fmt 6652
Sfmt 6201
E:\BILLS\H7406.IH
H7406
kjohnson on DSK79L0C42PROD with BILLS
4
•HR 7406 IH
duction or utilization facility, the Commission shall,
1
to the extent practicable, use information that was
2
part of the licensing basis of the licensed production
3
or utilization facility.
4
‘‘(4) REGULATIONS.—The Commission shall
5
initiate a rulemaking, not later than 1 year after the
6
date of enactment of this subsection, to amend the
7
regulations of the Commission to implement this
8
subsection.
9
‘‘(5) ENVIRONMENTAL IMPACT STATEMENT DE-
10
FINED.—In this subsection, the term ‘environmental
11
impact statement’ means a detailed statement re-
12
quired under section 102(2)(C) of the National En-
13
vironmental Policy Act of 1969 (42 U.S.C.
14
4332(2)(C)).
15
‘‘(6) RELATIONSHIP TO OTHER LAW.—Nothing
16
in this subsection exempts the Commission from any
17
requirement
for
full
compliance
with
section
18
102(2)(C) of the National Environmental Policy Act
19
of 1969 (42 U.S.C. 4332(2)(C)).’’.
20
SEC. 3. UPDATING HEARING PROCEDURES.
21
(a) INFORMAL HEARING PROCEDURES.—Section 189
22
a. of the Atomic Energy Act of 1954 (42 U.S.C. 2239(a))
23
is amended by adding at the end the following:
24
VerDate Sep 11 2014
22:46 Jul 22, 2020
Jkt 099200
PO 00000
Frm 00004
Fmt 6652
Sfmt 6201
E:\BILLS\H7406.IH
H7406
kjohnson on DSK79L0C42PROD with BILLS
5
•HR 7406 IH
‘‘(3) The Commission may use informal adjudicatory
1
procedures for any hearing required under this section for
2
which the Commission determines that adjudicatory proce-
3
dures under section 554 of title 5, United States Code,
4
are unnecessary.’’.
5
(b) STUDY ON THE IMPACT OF THE ELIMINATION OF
6
MANDATORY HEARING FOR UNCONTESTED LICENSING
7
APPLICATIONS.—Not later than 18 months after the date
8
of enactment of this Act, the Comptroller General shall
9
transmit to Congress a report containing the results of
10
a study on the effects of eliminating the hearings required
11
under section 189 a. of the Atomic Energy Act of 1954
12
(42 U.S.C. 2239(a)) for an application under section 103
13
or section 104 b. of such Act for a construction permit
14
for a facility in the absence of a request of any person
15
whose interest may be affected by the proceeding.
16
SEC. 4. EFFICIENCY OF ADVISORY COMMITTEE ON REAC-
17
TOR SAFEGUARDS.
18
(a) COMMITTEE COMPOSITION.—Section 29 of the
19
Atomic Energy Act of 1954 (42 U.S.C. 2039) is amended
20
by inserting ‘‘The Commission shall seek to include a di-
21
versity of disciplines and operational experiences when ap-
22
pointing members of the Committee.’’ after ‘‘four years
23
each.’’.
24
VerDate Sep 11 2014
22:46 Jul 22, 2020
Jkt 099200
PO 00000
Frm 00005
Fmt 6652
Sfmt 6201
E:\BILLS\H7406.IH
H7406
kjohnson on DSK79L0C42PROD with BILLS
6
•HR 7406 IH
(b) LICENSE APPLICATIONS.—Section 182 b. of the
1
Atomic Energy Act of 1954 (42 U.S.C. 2232(b)) is
2
amended by adding at the end the following: ‘‘If the Com-
3
mission determines referral of an application to the Com-
4
mittee is necessary, the Committee shall initiate a review
5
of the application not later than 30 days after receiving
6
such referral, and shall submit a report thereon under this
7
subsection not later than 180 days after initiating such
8
review.’’.
9
SEC. 5. UPDATING NUCLEAR REGULATORY COMMISSION
10
USER FEES AND CHARGES.
11
Section 102(b)(3)(B) of the Nuclear Energy Innova-
12
tion and Modernization Act (Public Law 115–439) is
13
amended—
14
(1) by redesignating clause (ii) as clause (iii);
15
(2) by inserting after clause (i) the following:
16
‘‘(ii) FUEL FACILITIES.—
17
‘‘(I) IN GENERAL.—The total an-
18
nual charges under subparagraph (A)
19
charged to fuel facility licensees, to
20
the maximum extent practicable, shall
21
not exceed an amount that is equal to
22
the total annual fees collected from
23
the fuel facilities class under the final
24
rule of the Commission entitled ‘Revi-
25
VerDate Sep 11 2014
22:46 Jul 22, 2020
Jkt 099200
PO 00000
Frm 00006
Fmt 6652
Sfmt 6201
E:\BILLS\H7406.IH
H7406
kjohnson on DSK79L0C42PROD with BILLS
7
•HR 7406 IH
sion of Fee Schedules; Fee Recovery
1
for Fiscal Year 2016’ (81 Fed Reg.
2
41171
(June
24,
2016)),
which
3
amount may be adjusted annually by
4
the Commission to reflect changes in
5
the Consumer Price Index published
6
by the Bureau of Labor Statistics of
7
the Department of Labor.
8
‘‘(II) EXCEPTION.—Subclause (I)
9
shall not apply if the number of li-
10
censed facilities classified by the Com-
11
mission as fuel facilities exceeds
12
seven.
13
‘‘(III)
CHANGES
TO
ANNUAL
14
CHARGES.—Any change in an annual
15
charge
under
subparagraph
(A)
16
charged to a fuel facility licensee shall
17
be based on—
18
‘‘(aa) a change in the regu-
19
latory services provided with re-
20
spect to the fuel facility; or
21
‘‘(bb) an adjustment de-
22
scribed in subclause (I).’’; and
23
VerDate Sep 11 2014
22:46 Jul 22, 2020
Jkt 099200
PO 00000
Frm 00007
Fmt 6652
Sfmt 6201
E:\BILLS\H7406.IH
H7406
kjohnson on DSK79L0C42PROD with BILLS
8
•HR 7406 IH
(3) in clause (iii), as redesignated by paragraph
1
(1) of this section, by striking ‘‘clause (i)’’ and in-
2
serting ‘‘clause (i) or (ii)’’.
3
Æ
VerDate Sep 11 2014
22:46 Jul 22, 2020
Jkt 099200
PO 00000
Frm 00008
Fmt 6652
Sfmt 6301
E:\BILLS\H7406.IH
H7406
kjohnson on DSK79L0C42PROD with BILLS
Important: This plain English summary was generated by AI and is provided for informational purposes only.
It is not legal advice. Always consult the official bill text on Congress.gov
or a qualified attorney for legal matters.