Federal
To require the Secretary of the Army, acting through the Chief of Engineers, to convey certain property to the Tri-County Levee District.
Source: Congress.gov Β·
815 words in original text
Plain English summary not yet available
The full original text is available below. Check back soon as we process this bill.
I
116TH CONGRESS
2D SESSION
H. R. 6771
To require the Secretary of the Army, acting through the Chief of Engineers,
to convey certain property to the Tri-County Levee District.
IN THE HOUSE OF REPRESENTATIVES
MAY 8, 2020
Mr. LUETKEMEYER introduced the following bill; which was referred to the
Committee on Transportation and Infrastructure
A BILL
To require the Secretary of the Army, acting through the
Chief of Engineers, to convey certain property to the
Tri-County Levee District.
Be it enacted by the Senate and House of Representa-
1
tives of the United States of America in Congress assembled,
2
SECTION 1. TRI-COUNTY LEVEE DISTRICT.
3
(a) CONVEYANCE.βNot later than 12 months after
4
the date of enactment of this Act, the Secretary of the
5
Army, acting through the Chief of Engineers, shall convey
6
to the Tri-County Levee District #1, Missouri, without
7
consideration and subject to subsection (b), all right, title,
8
and interest in and to real property described in sub-
9
section (c).
10
VerDate Sep 11 2014
01:26 May 21, 2020
Jkt 099200
PO 00000
Frm 00001
Fmt 6652
Sfmt 6201
E:\BILLS\H6771.IH
H6771
pamtmann on DSKBC07HB2PROD with BILLS
2
β’HR 6771 IH
(b) CONDITIONS.β
1
(1) SURVEY TO OBTAIN LEGAL DESCRIPTION.β
2
The exact acreage and the legal description of any
3
real property to be conveyed under this section shall
4
be determined by a survey, to be completed and pro-
5
vided by the Tri-County Levee District #1, that is
6
satisfactory to the Secretary.
7
(2) APPLICABILITY OF PROPERTY SCREENING
8
PROVISIONS.βSection 2696 of title 10, United
9
States Code, shall not apply to any conveyance
10
under this section.
11
(3) ADDITIONAL
TERMS
AND
CONDITIONS.β
12
The Secretary may require that any conveyance
13
under this section be subject to such additional
14
terms and conditions as the Secretary considers nec-
15
essary and appropriate to protect the interests of the
16
United States.
17
(4) COSTS
OF
CONVEYANCE.βAn entity to
18
which a conveyance is made under this section shall
19
be responsible for all reasonable and necessary costs,
20
including real estate transaction and environmental
21
documentation costs, associated with the conveyance.
22
(5) LIABILITY.βAn entity to which a convey-
23
ance is made under this section shall hold the
24
United States harmless from any liability with re-
25
VerDate Sep 11 2014
01:26 May 21, 2020
Jkt 099200
PO 00000
Frm 00002
Fmt 6652
Sfmt 6201
E:\BILLS\H6771.IH
H6771
pamtmann on DSKBC07HB2PROD with BILLS
3
β’HR 6771 IH
spect to activities carried out, on or after the date
1
of the conveyance, on real property conveyed. The
2
United States shall remain responsible for any liabil-
3
ity with respect to activities carried out, before such
4
date, on the real property conveyed.
5
(c) PROPERTY.βThe property to be conveyed is part
6
of Sections 1 and 12 Township 45 North Range 6 West
7
of the 5th P.M. in Montgomery Co. Mo. described as fol-
8
lows:
9
(1) A tract of land being 60β wide and lying
10
South and East of and adjoining the centerline of
11
the existing levee and being described as follows:
12
Commencing at the NW corner of Section 12, thence
13
S 87Β° 52β 35ββ E 587.4β, thence S 01Β° 29β 25ββ W
14
453.68β to the point of the beginning; said point
15
being in the center of the levee, thence with the cen-
16
terline of the levee N 77Β° 01β 30ββ E 164.92β, thence
17
N 74Β° 26β 55ββ E 250.0β, thence N 72Β° 27β 55ββ E
18
270.0β, thence N 69Β° 06β 10ββ E 300.0β, thence N
19
66Β° 42β 15ββ E 500.0β, thence N 64Β° 14β 30ββ E
20
270.0β, thence N 61Β° 09β 10ββ E 800.0β, thence N
21
60Β° 58β 15ββ E 1724.45β, thence leaving the center-
22
line S 01Β° 10β 35ββ W 69.43β, thence parallel with
23
the above described centerline S 60Β° 58β 15ββ W
24
1689.62β, thence S 61Β° 09β 10ββ W 801.71β, thence
25
VerDate Sep 11 2014
01:26 May 21, 2020
Jkt 099200
PO 00000
Frm 00003
Fmt 6652
Sfmt 6201
E:\BILLS\H6771.IH
H6771
pamtmann on DSKBC07HB2PROD with BILLS
4
β’HR 6771 IH
S 64Β° 14β 30ββ W 272.91β, thence S 66Β° 42β 15ββ W
1
502.55β, thence S 69Β° 06β 10ββ W 303.02β, thence S
2
72Β° 27β 55ββ W 272.8β, thence S 74Β° 26β 55ββ W
3
252.39β, thence S 77Β° 01β 30ββ W 181.75β, thence
4
leaving the South side of the levee N 01Β° 26β 25ββ
5
E 61.96β to the point of beginning and containing
6
5.89 acres more or less.
7
(2) Subject to restrictions of record: if any.
8
Γ
VerDate Sep 11 2014
01:26 May 21, 2020
Jkt 099200
PO 00000
Frm 00004
Fmt 6652
Sfmt 6301
E:\BILLS\H6771.IH
H6771
pamtmann on DSKBC07HB2PROD with BILLS
Important: This plain English summary was generated by AI and is provided for informational purposes only.
It is not legal advice. Always consult the official bill text on Congress.gov
or a qualified attorney for legal matters.