What This Bill Does
This bill changes the federal definition of "navigable waters" under the Federal Water Pollution Control Act. It narrows which waters receive federal protection and creates a process for property owners to get official determinations about whether their waters are federally regulated.
##
Who It Affects
- Property owners and land developers
- Permit applicants under section 404 of the Federal Water Pollution Control Act
- The Secretary of the Army
- The Environmental Protection Agency (EPA) Administrator
- Federal district courts
##
Key Provisions
- The bill defines "navigable waters" to include: territorial seas, interstate waters used for commerce, permanent or continuously flowing streams and rivers, and wetlands adjacent to and directly connected to those waters (Sec. 2(a))
- The bill explicitly excludes intermittent or seasonal waters that only flow after rain or snowmelt, groundwater, man-made ditches, irrigation systems, prior converted cropland, artificially irrigated areas, and various other constructed water features (Sec. 2(a))
- Property owners can request a binding written determination from the Secretary of the Army about whether their waters qualify as navigable waters, and the Secretary must respond within 60 days at no cost to the property owner (Sec. 2(b))
- If the Secretary does not respond within 60 days, the waters are automatically not considered navigable waters (Sec. 2(b))
- Property owners can challenge the Secretary's determination in federal court within 30 days of the determination (Sec. 2(b))
##
What Changes
The current federal definition of navigable waters will be replaced with this new, narrower definition. Property owners will be able to request official determinations about their specific waters rather than having determinations made case-by-case. Waters that previously received federal protection under the broader definition may no longer be considered navigable waters under this new definition.
##
Important Definitions
- "Continuous surface water connection" means a connection where an ordinary person cannot visually tell by looking at the water where one body of water ends and another begins (Sec. 2(a))
- "Relatively permanent, standing, or continuously flowing bodies of water" means waters that stand or flow continuously for at least 185 days each year (except during extreme drought) and have a defined bed and banks (Sec. 2(a))
- "Affected person" means a permit applicant, property owner, or other person with a legal interest in the property (Sec. 2(b))
##
Effective Date
Not specified in bill text
II
118TH CONGRESS
1ST SESSION
S. 1022
To amend the Federal Water Pollution Control Act to modify the definition
of navigable waters, and for other purposes.
IN THE SENATE OF THE UNITED STATES
MARCH 29, 2023
Mr. BRAUN (for himself, Mr. GRASSLEY, and Ms. ERNST) introduced the fol-
lowing bill; which was read twice and referred to the Committee on Envi-
ronment and Public Works
A BILL
To amend the Federal Water Pollution Control Act to modify
the definition of navigable waters, and for other purposes.
Be it enacted by the Senate and House of Representa-
1
tives of the United States of America in Congress assembled,
2
SECTION 1. SHORT TITLE.
3
This Act may be cited as the ‘‘Define WOTUS Act
4
of 2023’’.
5
SEC. 2. NAVIGABLE WATERS.
6
(a) NAVIGABLE WATERS DEFINITION.—Section 502
7
of the Federal Water Pollution Control Act (33 U.S.C.
8
1362) is amended by striking paragraph (7) and inserting
9
the following:
10
VerDate Sep 11 2014
20:13 Apr 07, 2023
Jkt 039200
PO 00000
Frm 00001
Fmt 6652
Sfmt 6201
E:\BILLS\S1022.IS
S1022
pbinns on DSKJLVW7X2PROD with $$_JOB
2
•S 1022 IS
‘‘(7) NAVIGABLE WATERS.—
1
‘‘(A) IN GENERAL.—The term ‘navigable
2
waters’ means—
3
‘‘(i) the territorial seas;
4
‘‘(ii) interstate waters that are used,
5
or are susceptible to use in the natural and
6
ordinary condition of those waters, as a
7
means in transport of interstate or foreign
8
commerce;
9
‘‘(iii) relatively permanent, standing,
10
or continuously flowing bodies of water
11
that form geographical features commonly
12
known as streams, rivers, or lakes, that
13
flow directly into waters described in
14
clause (ii); and
15
‘‘(iv) wetlands that are adjacent to
16
and have a continuous surface water con-
17
nection to waters described in clause (ii) or
18
(iii).
19
‘‘(B) EXCLUSIONS.—The term ‘navigable
20
waters’ does not include—
21
‘‘(i) intermittent or ephemeral waters,
22
including features that flow only in re-
23
sponse to precipitation or melt from
24
snowpack;
25
VerDate Sep 11 2014
20:13 Apr 07, 2023
Jkt 039200
PO 00000
Frm 00002
Fmt 6652
Sfmt 6201
E:\BILLS\S1022.IS
S1022
pbinns on DSKJLVW7X2PROD with $$_JOB
3
•S 1022 IS
‘‘(ii) subsurface waters, such as
1
groundwater or underground streams, in-
2
cluding subsurface waters drained through
3
subsurface drainage systems, such as drain
4
tiling;
5
‘‘(iii) intrastate waters, unless the
6
waters meet the requirements described in
7
subparagraph (A);
8
‘‘(iv) a man-made channel or ditch,
9
including
irrigation,
distribution,
and
10
drainage systems;
11
‘‘(v) prior converted cropland;
12
‘‘(vi) artificially irrigated areas;
13
‘‘(vii) artificial lakes and ponds con-
14
structed in upland;
15
‘‘(viii) water-filled depressions created
16
in upland, including water-filled depres-
17
sions incidental to mining or construction
18
activity;
19
‘‘(ix) stormwater control features ex-
20
cavated or constructed in upland to convey,
21
treat, infiltrate, or store stormwater run-
22
off;
23
‘‘(x) wastewater recycling structures
24
constructed in upland;
25
VerDate Sep 11 2014
20:13 Apr 07, 2023
Jkt 039200
PO 00000
Frm 00003
Fmt 6652
Sfmt 6201
E:\BILLS\S1022.IS
S1022
pbinns on DSKJLVW7X2PROD with $$_JOB
4
•S 1022 IS
‘‘(xi) waste treatment systems;
1
‘‘(xii) waters that require the use of
2
means beyond visual inspection by the
3
naked eye, including aerial photographs,
4
satellite imaging, or hydrological testing, to
5
determine if the waters meets the require-
6
ments described in subparagraph (A); or
7
‘‘(xiii) any other waters that do not
8
meet the requirements under subparagraph
9
(A), without regard to whether the water—
10
‘‘(I) previously met or would have
11
met those requirements; or
12
‘‘(II) may in the future meet
13
those requirements.
14
‘‘(C) ASSOCIATED DEFINITIONS.—For the
15
purposes of this paragraph:
16
‘‘(i) CONTINUOUS
SURFACE
WATER
17
CONNECTION.—The term ‘continuous sur-
18
face water connection’ means a connection
19
with respect to which an ordinary person
20
would not be able to visually determine by
21
the naked eye, by looking at the water sur-
22
face, where 1 body of water ends and the
23
other begins.
24
VerDate Sep 11 2014
20:13 Apr 07, 2023
Jkt 039200
PO 00000
Frm 00004
Fmt 6652
Sfmt 6201
E:\BILLS\S1022.IS
S1022
pbinns on DSKJLVW7X2PROD with $$_JOB
5
•S 1022 IS
‘‘(ii)
RELATIVELY
PERMANENT,
1
STANDING, OR
CONTINUOUSLY
FLOWING
2
BODIES OF WATER.—The term ‘relatively
3
permanent, standing, or continuously flow-
4
ing bodies of water’ means waters that, ex-
5
cept in cases of extreme events (such as a
6
drought)—
7
‘‘(I) stand or have continuous
8
flow for not less than 185 days each
9
year; and
10
‘‘(II) exhibit a bed and banks.’’.
11
(b) JURISDICTIONAL DETERMINATION.—Title V of
12
the Federal Water Pollution Control Act is amended—
13
(1) by redesignating section 520 (33 U.S.C.
14
1251 note) as section 521; and
15
(2) by inserting after section 519 (33 U.S.C.
16
1377a) the following:
17
‘‘SEC. 520. JURISDICTIONAL DETERMINATIONS.
18
‘‘(a) DEFINITIONS.—In this section:
19
‘‘(1) AFFECTED PERSON.—The term ‘affected
20
person’ means an applicant for a permit under sec-
21
tion 404, landowner, or other affected person with
22
an identifiable and substantial legal interest in a
23
property.
24
VerDate Sep 11 2014
20:13 Apr 07, 2023
Jkt 039200
PO 00000
Frm 00005
Fmt 6652
Sfmt 6201
E:\BILLS\S1022.IS
S1022
pbinns on DSKJLVW7X2PROD with $$_JOB
6
•S 1022 IS
‘‘(2) SECRETARY.—The term ‘Secretary’ means
1
the Secretary of the Army.
2
‘‘(b) BINDING DETERMINATION.—On written request
3
of an affected person, the Secretary shall provide a bind-
4
ing determination of whether the waters on the property
5
of the affected person are navigable waters that meet the
6
requirements described in section 502(7)(A)(iv).
7
‘‘(c) COSTS.—A determination of the Secretary under
8
subsection (b) shall be made at the cost of the Secretary.
9
‘‘(d) TIMING.—
10
‘‘(1) IN GENERAL.—The Secretary shall make a
11
determination under subsection (b) not later than 60
12
days after the date on which the Secretary receives
13
a written request from an affected person.
14
‘‘(2) EFFECT OF NONRESPONSE.—If the Sec-
15
retary does not make a determination by the end of
16
the period described in paragraph (1), the waters on
17
the property of the affected person shall not be con-
18
sidered to be navigable waters.
19
‘‘(e) TERM OF DETERMINATION.—
20
‘‘(1) FINDING OF NAVIGABLE WATERS.—If the
21
Secretary determines under subsection (b) that the
22
waters on the property of the affected person are
23
navigable waters, the determination shall be binding
24
on the Secretary and the Administrator for a period
25
VerDate Sep 11 2014
20:13 Apr 07, 2023
Jkt 039200
PO 00000
Frm 00006
Fmt 6652
Sfmt 6201
E:\BILLS\S1022.IS
S1022
pbinns on DSKJLVW7X2PROD with $$_JOB
7
•S 1022 IS
to be determined by the Secretary, but in any case
1
not longer than 5 years after the date of the deter-
2
mination.
3
‘‘(2) FINDING OF NONNAVIGABLE WATERS.—If
4
the Secretary determines under subsection (b) that
5
the waters on the property of the affected person are
6
not navigable waters, the determination shall be
7
binding on the Secretary and the Administrator for
8
as long as the affected person has an identifiable
9
and substantial legal interest in the property.
10
‘‘(f) JUDICIAL REVIEW.—
11
‘‘(1) IN GENERAL.—An affected person may ob-
12
tain expedited judicial review of a determination of
13
the Secretary under subsection (b).
14
‘‘(2) TIMING.—To obtain expedited judicial re-
15
view under paragraph (1), the affected person shall
16
submit a claim under that paragraph not later than
17
30 days after the date on which the Secretary makes
18
the determination under subsection (b).
19
‘‘(3) JURISDICTION.—A district court of the
20
United States with appropriate venue for the State
21
in which the affected person resides or in which a
22
substantial part of the property of the affected per-
23
VerDate Sep 11 2014
20:13 Apr 07, 2023
Jkt 039200
PO 00000
Frm 00007
Fmt 6652
Sfmt 6201
E:\BILLS\S1022.IS
S1022
pbinns on DSKJLVW7X2PROD with $$_JOB
8
•S 1022 IS
son is located shall have jurisdiction over an action
1
under this subsection.’’.
2
Æ
VerDate Sep 11 2014
20:13 Apr 07, 2023
Jkt 039200
PO 00000
Frm 00008
Fmt 6652
Sfmt 6301
E:\BILLS\S1022.IS
S1022
pbinns on DSKJLVW7X2PROD with $$_JOB