Plain English summary not yet available
The full original text is available below. Check back soon as we process this bill.
I
116TH CONGRESS
2D SESSION
H. R. 5770
To establish a national network of electric vehicle charging stations, and
for other purposes.
IN THE HOUSE OF REPRESENTATIVES
FEBRUARY 6, 2020
Mr. LEVIN of Michigan (for himself and Ms. OCASIO-CORTEZ) introduced the
following bill; which was referred to the Committee on Energy and Com-
merce, and in addition to the Committee on Transportation and Infra-
structure, for a period to be subsequently determined by the Speaker, in
each case for consideration of such provisions as fall within the jurisdic-
tion of the committee concerned
A BILL
To establish a national network of electric vehicle charging
stations, and for other purposes.
Be it enacted by the Senate and House of Representa-
1
tives of the United States of America in Congress assembled,
2
SECTION 1. SHORT TITLE.
3
This Act may be cited as the ‘‘Electric Vehicle Free-
4
dom Act’’ or the ‘‘EV Freedom Act’’.
5
SEC. 2. FINDINGS; PURPOSE.
6
(a) FINDINGS.—Congress finds the following:
7
VerDate Sep 11 2014
04:02 Feb 07, 2020
Jkt 099200
PO 00000
Frm 00001
Fmt 6652
Sfmt 6201
E:\BILLS\H5770.IH
H5770
kjohnson on DSK79L0C42PROD with BILLS
2
•HR 5770 IH
(1) Electric vehicles will play an important role
1
in transitioning to a cleaner transportation system
2
that protects Americans’ health and our planet. Ac-
3
cording to the United States Department of Energy,
4
electric vehicles ‘‘produce fewer emissions that con-
5
tribute to climate change and smog than conven-
6
tional vehicles.’’
7
(2) Electric vehicles are becoming more popular
8
among American consumers. United States sales of
9
electric vehicles increased 27 percent between 2016
10
and 2017, and 81 percent between 2017 and 2018.
11
(3) Access to electric vehicle charging stations
12
is currently insufficient to meet consumer demand.
13
According to the National Renewable Energy Lab-
14
oratory, ‘‘two key areas of needed improvement in
15
actual vehicle charging are speed (reducing battery
16
charging times) and coverage (having adequate and
17
accessible charging stations)’’.
18
(4) Demand for publicly accessible electric vehi-
19
cle chargers is projected to grow. At the end of
20
2017, there were an estimated 17,000 electric vehi-
21
cle direct current fast charging stations with 55,000
22
electric vehicle direct current fast charging plugs
23
available in the United States. Estimates by the Na-
24
tional Renewable Energy Laboratory suggest that,
25
VerDate Sep 11 2014
04:02 Feb 07, 2020
Jkt 099200
PO 00000
Frm 00002
Fmt 6652
Sfmt 6201
E:\BILLS\H5770.IH
H5770
kjohnson on DSK79L0C42PROD with BILLS
3
•HR 5770 IH
by 2050, between 106,000 and 138,000 stations
1
with 343,000 and 447,000 plugs could be needed to
2
meet consumer demand.
3
(5) Failure to expand access to publicly acces-
4
sible electric vehicle chargers will prevent the wider
5
adoption of electric vehicles and, therefore, hinder
6
progress towards a more sustainable transportation
7
system. According to a study produced by the Michi-
8
gan Energy Office and Michigan State University,
9
‘‘limited charging infrastructure for electric vehicles
10
has been one of the main barriers in adopting these
11
vehicles’’.
12
(6) Expediting the wider adoption of electric ve-
13
hicles will require considerable changes to consumer
14
behavior, which will not be possible without the cre-
15
ation of necessary infrastructure. According to a
16
study produced by the Transportation Research
17
Board and National Research Council, ‘‘adoption
18
and diffusion of new innovations can be a long-term,
19
complicated process that is especially slow for prod-
20
ucts that cost tens of thousands of dollars and where
21
consumers have questions about infrastructure avail-
22
ability, resale value, and other variables’’, and ‘‘a
23
perception of a lack of public charging infrastructure
24
might hinder [plug-in electric vehicle] deployment.’’
25
VerDate Sep 11 2014
04:02 Feb 07, 2020
Jkt 099200
PO 00000
Frm 00003
Fmt 6652
Sfmt 6201
E:\BILLS\H5770.IH
H5770
kjohnson on DSK79L0C42PROD with BILLS
4
•HR 5770 IH
Thus, greatly expanding access to publicly accessible
1
electric vehicle chargers will be essential to changing
2
consumer behavior radically and, accordingly, accel-
3
erating the wider adoption of electric vehicles.
4
(b) PURPOSE.—The purpose of this Act is to estab-
5
lish a network of electric vehicle charging stations along
6
eligible roads so that the United States may lead the world
7
in protecting the environment while improving consumer
8
experiences. The implementation of this Act will encourage
9
the widespread adoption of light-, medium-, and heavy-
10
duty electric vehicles by—
11
(1) eliminating ‘‘range anxiety’’;
12
(2) allowing drivers to charge vehicles more
13
quickly; and
14
(3) ensuring that vehicle charging is equitably
15
accessible and reasonably priced, enabling long-dis-
16
tance travel along eligible roads.
17
(c) DEFINITIONS.—In this Act:
18
(1) ELIGIBLE ROAD.—The term ‘‘eligible road’’
19
means a road that—
20
(A) is part of the National Highway Sys-
21
tem (as such term is defined in section 101 of
22
title 23, United States Code); and
23
VerDate Sep 11 2014
04:02 Feb 07, 2020
Jkt 099200
PO 00000
Frm 00004
Fmt 6652
Sfmt 6201
E:\BILLS\H5770.IH
H5770
kjohnson on DSK79L0C42PROD with BILLS
5
•HR 5770 IH
(B) is a public road (as such term is de-
1
fined in section 101 of title 23, United States
2
Code).
3
(2) PUBLICLY AVAILABLE EVSE.—
4
(A) IN
GENERAL.—The term ‘‘publicly
5
available EVSE’’ means electric vehicle supply
6
equipment and any associated parking spaces
7
designated by the property owner or lessee to be
8
available to, and accessible by, the public for
9
any period of time, including electric vehicle
10
supply equipment and associated parking spaces
11
located in garages or gated facilities if any
12
member of the public can obtain vehicular ac-
13
cess to the facility for free or through payment
14
of a fee.
15
(B)
EXCLUSION.—The
term
‘‘publicly
16
available EVSE’’ does not include electric vehi-
17
cle supply equipment and any associated park-
18
ing spaces in a workplace if the electric vehicle
19
supply equipment and associated parking spaces
20
are clearly marked and operated as available ex-
21
clusively to employees or contracted drivers.
22
(3) RENEWABLE ENERGY SOURCE.—The term
23
‘‘renewable energy source’’ means a renewable
24
source of generated energy, including the following:
25
VerDate Sep 11 2014
04:02 Feb 07, 2020
Jkt 099200
PO 00000
Frm 00005
Fmt 6652
Sfmt 6201
E:\BILLS\H5770.IH
H5770
kjohnson on DSK79L0C42PROD with BILLS
6
•HR 5770 IH
(A) Solar, including electricity.
1
(B) Wind.
2
(C) Ocean, including tidal, wave, current,
3
and thermal.
4
(D) Geothermal, including electricity and
5
heat pumps.
6
(E) New hydroelectric generation capacity
7
achieved from increased efficiency or additions
8
of new capacity at an existing hydroelectric
9
project after January 1, 1999.
10
SEC. 3. NATIONAL NETWORK OF ELECTRIC VEHICLE
11
CHARGING
STATIONS
ALONG
ELIGIBLE
12
ROADS.
13
(a) PLAN.—The Secretary of Transportation, in co-
14
ordination with the Secretary of Energy, shall devise a
15
plan to create a network of publicly available EVSE along
16
eligible roads.
17
(b) SUBMISSION.—Not later than 3 years after the
18
date of enactment of this Act, the Secretary of Transpor-
19
tation and the Secretary of Energy shall submit the plan
20
to the Speaker of the House of Representatives, the Mi-
21
nority Leader of the House of Representatives, the Major-
22
ity Leader of the Senate, the Minority Leader of the Sen-
23
ate, and the Chairs and Ranking Members of—
24
VerDate Sep 11 2014
04:02 Feb 07, 2020
Jkt 099200
PO 00000
Frm 00006
Fmt 6652
Sfmt 6201
E:\BILLS\H5770.IH
H5770
kjohnson on DSK79L0C42PROD with BILLS
7
•HR 5770 IH
(1) the Committee on Transportation and In-
1
frastructure of the House of Representatives;
2
(2) the Committee on Environment and Public
3
Works of the Senate;
4
(3) the Committee on Energy and Commerce of
5
the House of Representatives;
6
(4) the Committee on Energy and Natural Re-
7
sources of the Senate;
8
(5) the Subcommittee on Transportation, Hous-
9
ing and Urban Development, and Related Agencies
10
of the Committee on Appropriations of the House of
11
Representatives;
12
(6) the Subcommittee on Transportation, Hous-
13
ing and Urban Development, and Related Agencies
14
of the Committee on Appropriations of the Senate;
15
(7) the Subcommittee on Energy and Water
16
Development, and Related Agencies of the Com-
17
mittee on Appropriations of the House of Represent-
18
atives; and
19
(8) the Subcommittee on Energy and Water
20
Development of the Committee on Appropriations of
21
the Senate.
22
(c) CONSIDERATIONS.—The Secretary of Transpor-
23
tation and the Secretary of Energy shall consider the fol-
24
lowing in developing the plan:
25
VerDate Sep 11 2014
04:02 Feb 07, 2020
Jkt 099200
PO 00000
Frm 00007
Fmt 6652
Sfmt 6201
E:\BILLS\H5770.IH
H5770
kjohnson on DSK79L0C42PROD with BILLS
8
•HR 5770 IH
(1) The distance between publicly available
1
EVSE locations.
2
(2) Connections to the electric grid, including
3
electric distribution upgrades that account for charg-
4
ing during peaking periods, and plans for the use of
5
renewable energy sources to power charging and en-
6
ergy storage.
7
(3) The ability to incorporate technologies not
8
yet invented or technically feasible, or infrastructure
9
that can allow the addition of new capabilities and
10
functionalities as they become available.
11
(4) The number of charging stations at each
12
publicly available EVSE location, accounting for
13
dense corridors where multiple stations or a greater
14
number of charging ports at the location are nec-
15
essary and for rural corridors where special consid-
16
erations will need to be made for less dense corridors
17
that will still require publicly available EVSE place-
18
ment.
19
(5) The placement of publicly available EVSE
20
within parking facilities and other locations, includ-
21
ing recommendations for promoting efficient dwell
22
times based on best practices.
23
(6) The availability of onsite amenities for vehi-
24
cle operators, including restrooms or food facilities.
25
VerDate Sep 11 2014
04:02 Feb 07, 2020
Jkt 099200
PO 00000
Frm 00008
Fmt 6652
Sfmt 6201
E:\BILLS\H5770.IH
H5770
kjohnson on DSK79L0C42PROD with BILLS
9
•HR 5770 IH
(7) The long-term operation and maintenance
1
of publicly available EVSE, including consideration
2
of the need for expanded capacity resulting from in-
3
creasing demand into the future, to avoid stranded
4
assets and protect the investment of public funds in
5
that infrastructure.
6
(8) A maximum distance for publicly available
7
EVSE placement off of eligible roads.
8
(9) Existing private as well as national, State,
9
local, Tribal, and territorial government electric
10
charging infrastructure incentives and programs, in-
11
cluding alternative fueling corridor networks.
12
(10) Pricing guidelines that enable operators of
13
publicly available EVSE to allow free charging or
14
impose a fee for charging, promoting a consistent,
15
reliable consumer charging and payment experience.
16
(11) Publicly available EVSE placement and
17
construction in communities in which climate
18
change, pollution, or environmental destruction have
19
exacerbated systemic racial, regional, social, environ-
20
mental, and economic injustices by disproportion-
21
ately affecting indigenous peoples, communities of
22
color, migrant communities, deindustrialized commu-
23
nities, depopulated rural communities, the poor, low-
24
VerDate Sep 11 2014
04:02 Feb 07, 2020
Jkt 099200
PO 00000
Frm 00009
Fmt 6652
Sfmt 6201
E:\BILLS\H5770.IH
H5770
kjohnson on DSK79L0C42PROD with BILLS
10
•HR 5770 IH
income workers, women, the elderly, the unhoused,
1
people with disabilities, or youth.
2
(d) CONSULTATIONS.—In developing the plan, the
3
Secretary of Transportation and the Secretary of Energy
4
shall consult with stakeholders, including the following:
5
(1) Federal partners, including the Secretary of
6
the Interior and the Administrator of the Environ-
7
mental Protection Agency.
8
(2) State, local, Tribal, and territorial govern-
9
ments, including State air quality and utility regu-
10
lators.
11
(3) Metropolitan planning organizations.
12
(4) Unionized labor groups.
13
(5) Environmental and environmental justice
14
organizations.
15
(6) Automobile and truck manufacturers.
16
(7) Electric utilities.
17
(8) Infrastructure providers.
18
(9) Technology providers.
19
(10) Software and network services providers.
20
(11) Infrastructure construction and component
21
parts suppliers.
22
(12) Multi-State and regional entities.
23
(13) Fuel station owners and operators.
24
(14) Fleet owners.
25
VerDate Sep 11 2014
04:02 Feb 07, 2020
Jkt 099200
PO 00000
Frm 00010
Fmt 6652
Sfmt 6201
E:\BILLS\H5770.IH
H5770
kjohnson on DSK79L0C42PROD with BILLS
11
•HR 5770 IH
(15) Fleet managers.
1
SEC. 4. TRANSPORTATION RESEARCH BOARD REPORT ON
2
FINANCING THE PLACEMENT OF ELECTRIC
3
VEHICLE CHARGERS.
4
(a) IN GENERAL.—The Secretary of Transportation
5
shall commission the Transportation Research Board of
6
the National Academy of Sciences to conduct a study on
7
options for financing the placement of publicly available
8
EVSE along eligible roads that includes consideration of
9
financial instruments and optimization of public-private
10
partnerships.
11
(b) DEADLINE.—The Secretary shall submit to Con-
12
gress the study commissioned under subsection (a) not
13
later than 2 years after the date of enactment of this Act.
14
SEC. 5. ESTABLISHMENT OF NETWORK OF ELECTRIC VEHI-
15
CLE CHARGERS ALONG ELIGIBLE ROADS.
16
(a) PLAN IMPLEMENTATION.—Not later than 5 years
17
after the date of enactment of this Act, using the plan
18
developed pursuant to section 3 and the recommendations
19
in the report described in section 4, the Secretary of
20
Transportation and the Secretary of Energy shall com-
21
plete the establishment of a national network of publicly
22
available EVSE.
23
(b) GRANT PROGRAM.—
24
VerDate Sep 11 2014
04:02 Feb 07, 2020
Jkt 099200
PO 00000
Frm 00011
Fmt 6652
Sfmt 6201
E:\BILLS\H5770.IH
H5770
kjohnson on DSK79L0C42PROD with BILLS
12
•HR 5770 IH
(1) ESTABLISHMENT.—Not later than 3 years
1
after the date of enactment of this Act, the Sec-
2
retary of Transportation in coordination with the
3
Secretary of Energy shall establish a competitive
4
grant program to award grants to eligible entities to
5
implement the plan developed in section 3 of this
6
Act.
7
(2) APPLICATIONS.—To be eligible to receive a
8
grant under this subsection, an eligible entity shall
9
submit to the Secretary of Transportation and the
10
Secretary of Energy an application at such tim
[Text truncated for display. Full text available on Congress.gov.]
Important: This plain English summary was generated by AI and is provided for informational purposes only.
It is not legal advice. Always consult the official bill text on Congress.gov
or a qualified attorney for legal matters.