116TH CONGRESS
1ST SESSION H. R. 5511
To require the Federal Energy Regulatory Commission to initiate a rule-
making to reform the interregional transmission planning process, and
for other purposes.
IN THE HOUSE OF REPRESENTATIVES
DECEMBER 19, 2019
Ms. HAALAND introduced the following bill; which was referred to the
Committee on Energy and Commerce
A BILL
To require the Federal Energy Regulatory Commission to
initiate a rulemaking to reform the interregional trans-
mission planning process, and for other purposes.
Be it enacted by the Senate and House of Representa-
1
tives of the United States of America in Congress assembled,
2
SECTION 1. SHORT TITLE.
3
This Act may be cited as the ‘‘Interregional Trans-
4
mission Planning Improvement Act of 2019’’.
5
VerDate Sep 11 2014
18:49 Dec 29, 2019
Jkt 099200
PO 00000
Frm 00001
Fmt 6652
Sfmt 6201
E:\BILLS\H5511.IH
H5511
pamtmann on DSKBC07HB2PROD with BILLS
2
•HR 5511 IH
SEC. 2. RULEMAKING TO INCREASE THE EFFECTIVENESS
1
OF INTERREGIONAL TRANSMISSION PLAN-
2
NING.
3
(a) IN GENERAL.—Not later than 6 months after the
4
date of enactment of this Act, the Federal Energy Regu-
5
latory Commission shall initiate a rulemaking to con-
6
sider—
7
(1) the effectiveness of existing planning proc-
8
esses for identifying transmission projects across re-
9
gions that provide economic, reliability, operational,
10
and public policy benefits, taking into consideration
11
the public interest, the integrity of markets, and the
12
protection of consumers;
13
(2) changes to the processes described in para-
14
graph (1) to ensure that efficient, cost-effective, and
15
broadly beneficial transmission solutions are selected
16
for construction, taking into consideration—
17
(A) the public interest;
18
(B) the integrity of markets;
19
(C) the protection of consumers;
20
(D) the broad range of benefits that inter-
21
regional transmission provides;
22
(E) the need for single projects to secure
23
approvals based on a comprehensive assessment
24
of the multiple benefits provided;
25
VerDate Sep 11 2014
18:49 Dec 29, 2019
Jkt 099200
PO 00000
Frm 00002
Fmt 6652
Sfmt 6201
E:\BILLS\H5511.IH
H5511
pamtmann on DSKBC07HB2PROD with BILLS
3
•HR 5511 IH
(F) that projects that meet interregional
1
benefit criteria should not be subject to subse-
2
quent reassessment by regional entities;
3
(G) the importance of synchronization of
4
planning processes in neighboring regions, such
5
as using a joint model on a consistent timeline
6
with a single set of needs, input assumptions,
7
and benefit metrics;
8
(H) that evaluation of long-term scenarios
9
should align with the expected life of a trans-
10
mission asset;
11
(I) that transmission planning authorities
12
should allow for the identification and joint
13
evaluation of alternatives proposed by stake-
14
holders;
15
(J) that interregional planning should be
16
done regularly and not less frequently than
17
once every 3 years; and
18
(K) the elimination of arbitrary project
19
voltage, size, or cost requirements for inter-
20
regional solutions; and
21
(3) cost allocation methodologies that reflect
22
the multiple benefits provided by interregional solu-
23
tions.
24
VerDate Sep 11 2014
18:49 Dec 29, 2019
Jkt 099200
PO 00000
Frm 00003
Fmt 6652
Sfmt 6201
E:\BILLS\H5511.IH
H5511
pamtmann on DSKBC07HB2PROD with BILLS
4
•HR 5511 IH
(b) TIMING.—Not later than 18 months after the
1
date of enactment of this Act, the Federal Energy Regu-
2
latory Commission shall promulgate a final rule to com-
3
plete the rulemaking initiated under subsection (a).
4
Æ