Federal
To require the Secretary of Energy to establish an energy efficiency materials pilot program, and for other purposes.
Source: Congress.gov ·
811 words in original text
Plain English summary not yet available
The full original text is available below. Check back soon as we process this bill.
I
116TH CONGRESS
1ST SESSION H. R. 3120
To require the Secretary of Energy to establish an energy efficiency materials
pilot program, and for other purposes.
IN THE HOUSE OF REPRESENTATIVES
JUNE 5, 2019
Mr. CARTWRIGHT (for himself, Mr. WELCH, Mr. CONNOLLY, Mr. PASCRELL,
Mr. TONKO, Mr. NEGUSE, Mr. GARCI´A of Illinois, Mr. ROUDA, Mr.
SCHIFF, Mr. POCAN, Ms. NORTON, Mr. SARBANES, Mr. RASKIN, Mr.
SIRES, and Mr. FITZPATRICK) introduced the following bill; which was re-
ferred to the Committee on Energy and Commerce
A BILL
To require the Secretary of Energy to establish an energy
efficiency materials pilot program, and for other purposes.
Be it enacted by the Senate and House of Representa-
1
tives of the United States of America in Congress assembled,
2
SECTION 1. ENERGY EFFICIENCY MATERIALS PILOT PRO-
3
GRAM.
4
(a) DEFINITIONS.—In this section:
5
(1) APPLICANT.—The term ‘‘applicant’’ means
6
a nonprofit organization that applies for a grant
7
under this section.
8
(2) ENERGY EFFICIENCY MATERIAL.—
9
VerDate Sep 11 2014
16:51 Jun 12, 2019
Jkt 089200
PO 00000
Frm 00001
Fmt 6652
Sfmt 6201
E:\BILLS\H3120.IH
H3120
pamtmann on DSKBFK8HB2PROD with BILLS
2
•HR 3120 IH
(A) IN GENERAL.—The term ‘‘energy effi-
1
ciency material’’ means a material (including a
2
product, equipment, or system) the installation
3
of which results in a reduction in use of energy
4
or fuel.
5
(B) INCLUSIONS.—The term ‘‘energy effi-
6
ciency material’’ includes—
7
(i) a roof or lighting system or compo-
8
nent of the system;
9
(ii) a window;
10
(iii) a door, including a security door;
11
(iv) a heating, ventilation, or air con-
12
ditioning system or component of the sys-
13
tem (including insulation and wiring and
14
plumbing improvements needed to serve a
15
more efficient system); and
16
(v) a renewable energy generation or
17
heating system, including a solar, photo-
18
voltaic, wind, geothermal, or biomass (in-
19
cluding wood pellet) system or component
20
of the system.
21
(3) NONPROFIT BUILDING.—
22
(A) IN
GENERAL.—The term ‘‘nonprofit
23
building’’ means a building operated and owned
24
by a nonprofit organization.
25
VerDate Sep 11 2014
16:51 Jun 12, 2019
Jkt 089200
PO 00000
Frm 00002
Fmt 6652
Sfmt 6201
E:\BILLS\H3120.IH
H3120
pamtmann on DSKBFK8HB2PROD with BILLS
3
•HR 3120 IH
(B) INCLUSIONS.—The term ‘‘nonprofit
1
building’’ includes a building described in sub-
2
paragraph (A) that is—
3
(i) a hospital;
4
(ii) a youth center;
5
(iii) a school;
6
(iv) a social-welfare program facility;
7
(v) a facility of a faith-based organiza-
8
tion; or
9
(vi) any other nonresidential and non-
10
commercial structure.
11
(4) NONPROFIT
ORGANIZATION.—The term
12
‘‘nonprofit organization’’ means an organization that
13
is described in section 501(c)(3) of the Internal Rev-
14
enue Code of 1986 and exempt from tax under sec-
15
tion 501(a) of such Code.
16
(5) SECRETARY.—The term ‘‘Secretary’’ means
17
the Secretary of Energy.
18
(b) ESTABLISHMENT.—Not later than 1 year after
19
the date of enactment of this Act, the Secretary shall es-
20
tablish a pilot program to award grants to nonprofit orga-
21
nizations to purchase energy efficiency materials to install
22
in nonprofit buildings.
23
(c) GRANTS.—
24
VerDate Sep 11 2014
16:51 Jun 12, 2019
Jkt 089200
PO 00000
Frm 00003
Fmt 6652
Sfmt 6201
E:\BILLS\H3120.IH
H3120
pamtmann on DSKBFK8HB2PROD with BILLS
4
•HR 3120 IH
(1) APPLICATION.—The Secretary may award a
1
grant under the pilot program established under
2
subsection (b) if an applicant submits to the Sec-
3
retary an application at such time, in such form,
4
and containing such information as the Secretary
5
may prescribe.
6
(2) CRITERIA
FOR
GRANT.—In determining
7
whether to award a grant under the pilot program
8
established under subsection (b), the Secretary shall
9
apply performance-based criteria, which shall give
10
priority to applicants based on—
11
(A) the energy savings expected to be
12
achieved;
13
(B) the cost-effectiveness of the use of the
14
energy efficiency materials that are proposed to
15
be purchased;
16
(C) an effective plan for evaluation, meas-
17
urement, and verification of energy savings; and
18
(D) the financial need of the applicant.
19
(3)
LIMITATION
ON
INDIVIDUAL
GRANT
20
AMOUNT.—Each grant awarded under this section
21
shall not exceed $200,000.
22
(d) AUTHORIZATION OF APPROPRIATIONS.—There is
23
authorized to be appropriated to carry out this section
24
VerDate Sep 11 2014
16:51 Jun 12, 2019
Jkt 089200
PO 00000
Frm 00004
Fmt 6652
Sfmt 6201
E:\BILLS\H3120.IH
H3120
pamtmann on DSKBFK8HB2PROD with BILLS
5
•HR 3120 IH
$10,000,000 for each of fiscal years 2020 through 2024,
1
to remain available until expended.
2
Æ
VerDate Sep 11 2014
16:51 Jun 12, 2019
Jkt 089200
PO 00000
Frm 00005
Fmt 6652
Sfmt 6301
E:\BILLS\H3120.IH
H3120
pamtmann on DSKBFK8HB2PROD with BILLS
Important: This plain English summary was generated by AI and is provided for informational purposes only.
It is not legal advice. Always consult the official bill text on Congress.gov
or a qualified attorney for legal matters.