I
116TH CONGRESS
1ST SESSION H. R. 2664
To improve energy performance in Federal buildings, and for other purposes.
IN THE HOUSE OF REPRESENTATIVES
MAY 10, 2019
Mr. CARTER of Georgia (for himself and Mr. VEASEY) introduced the fol-
lowing bill; which was referred to the Committee on Energy and Com-
merce, and in addition to the Committee on Transportation and Infra-
structure, for a period to be subsequently determined by the Speaker, in
each case for consideration of such provisions as fall within the jurisdic-
tion of the committee concerned
A BILL
To improve energy performance in Federal buildings, and
for other purposes.
Be it enacted by the Senate and House of Representa-
1
tives of the United States of America in Congress assembled,
2
SECTION 1. SHORT TITLE.
3
This Act may be cited as the ‘‘All-of-the-Above Fed-
4
eral Building Energy Conservation Act of 2019’’.
5
SEC. 2. ENERGY PERFORMANCE REQUIREMENT FOR FED-
6
ERAL BUILDINGS.
7
Section 543 of the National Energy Conservation
8
Policy Act (42 U.S.C. 8253) is amended—
9
VerDate Sep 11 2014
23:04 May 20, 2019
Jkt 089200
PO 00000
Frm 00001
Fmt 6652
Sfmt 6201
E:\BILLS\H2664.IH
H2664
pbinns on DSK79D2C42PROD with BILLS
2
•HR 2664 IH
(1) by striking subsections (a) and (b) and in-
1
serting the following:
2
‘‘(a) ENERGY PERFORMANCE REQUIREMENT
FOR
3
FEDERAL BUILDINGS.—
4
‘‘(1) IN GENERAL.—Subject to paragraph (2),
5
to the maximum extent life cycle cost-effective, each
6
agency shall apply energy conservation measures to,
7
and shall improve the design for the construction of,
8
the Federal buildings of the agency (including each
9
industrial or laboratory facility) so that the energy
10
consumption per gross square foot of the Federal
11
buildings of the agency in fiscal years 2020 through
12
2027 is reduced, as compared with the energy con-
13
sumption per gross square foot of the Federal build-
14
ings of the agency in fiscal year 2018, by the per-
15
centage specified in the following table:
16
‘‘Fiscal Year
Percentage
Reduction
2020 ..............................................................
2.5
2021 ..............................................................
5
2022 ..............................................................
7.5
2023 ..............................................................
10
2024 ..............................................................
12.5
2025 ..............................................................
15
2026 ..............................................................
17.5
2027 ..............................................................
20.
VerDate Sep 11 2014
23:04 May 20, 2019
Jkt 089200
PO 00000
Frm 00002
Fmt 6652
Sfmt 6201
E:\BILLS\H2664.IH
H2664
pbinns on DSK79D2C42PROD with BILLS
3
•HR 2664 IH
‘‘(2) EXCLUSION FOR BUILDINGS WITH ENERGY
1
INTENSIVE ACTIVITIES.—
2
‘‘(A) IN
GENERAL.—An agency may ex-
3
clude from the requirements of paragraph (1)
4
any building (including the associated energy
5
consumption and gross square footage of the
6
building) in which energy intensive activities are
7
carried out.
8
‘‘(B) REPORTS.—Each agency shall iden-
9
tify and include in each report under section
10
548(a) each building designated by the agency
11
for exclusion under subparagraph (A) during
12
the period covered by the report.
13
‘‘(3) RECOMMENDATIONS.—Not later than De-
14
cember 31, 2026, the Secretary shall—
15
‘‘(A) review the results of the implementa-
16
tion of the energy performance requirement es-
17
tablished under paragraph (1); and
18
‘‘(B) submit to Congress recommendations
19
concerning energy performance requirements
20
for fiscal years 2028 through 2037.
21
‘‘(b) ENERGY MANAGEMENT REQUIREMENT
FOR
22
FEDERAL AGENCIES.—
23
‘‘(1) IN GENERAL.—Each agency shall—
24
VerDate Sep 11 2014
23:04 May 20, 2019
Jkt 089200
PO 00000
Frm 00003
Fmt 6652
Sfmt 6201
E:\BILLS\H2664.IH
H2664
pbinns on DSK79D2C42PROD with BILLS
4
•HR 2664 IH
‘‘(A) not later than October 1, 2019, begin
1
installing in Federal buildings owned by the
2
United States all energy and water conservation
3
measures determined by the Secretary to be
4
life-cycle cost-effective; and
5
‘‘(B) complete the installation described in
6
subparagraph (A) as soon as practicable after
7
the date referred to in that subparagraph.
8
‘‘(2) EXPLANATION OF NONCOMPLIANCE.—
9
‘‘(A) IN GENERAL.—If an agency fails to
10
comply with paragraph (1), the agency shall
11
submit to the Secretary, using guidelines devel-
12
oped by the Secretary, an explanation of the
13
reasons for the failure.
14
‘‘(B) REPORT
TO
CONGRESS.—Not later
15
than October 1, 2021, and every 2 years there-
16
after, the Secretary shall submit to Congress a
17
report describing any noncompliance with the
18
requirements of paragraph (1).’’; and
19
(2) in subsection (f)—
20
(A) in paragraph (1)—
21
(i) by redesignating subparagraphs
22
(E), (F), and (G) as subparagraphs (F),
23
(G), and (H), respectively; and
24
VerDate Sep 11 2014
23:04 May 20, 2019
Jkt 089200
PO 00000
Frm 00004
Fmt 6652
Sfmt 6201
E:\BILLS\H2664.IH
H2664
pbinns on DSK79D2C42PROD with BILLS
5
•HR 2664 IH
(ii) by inserting after subparagraph
1
(D) the following:
2
‘‘(E)
ONGOING
COMMISSIONING.—The
3
term ‘ongoing commissioning’ means an ongo-
4
ing process of commissioning using monitored
5
data, the primary goal of which is to ensure
6
continuous optimum performance of a facility,
7
in accordance with design or operating needs,
8
over the useful life of the facility, while meeting
9
facility occupancy requirements.’’;
10
(B) in paragraph (2), by adding at the end
11
the following:
12
‘‘(C) ENERGY MANAGEMENT SYSTEM.—An
13
energy manager designated for a facility under
14
subparagraph (A) shall take into consider-
15
ation—
16
‘‘(i) the use of a system to manage
17
energy use at the facility; and
18
‘‘(ii) the applicability of certification
19
of the facility in accordance with the Inter-
20
national Organization for Standardization
21
standard numbered 50001 and entitled
22
‘Energy Management Systems’.’’; and
23
(C) by striking paragraphs (3) and (4) and
24
inserting the following:
25
VerDate Sep 11 2014
23:04 May 20, 2019
Jkt 089200
PO 00000
Frm 00005
Fmt 6652
Sfmt 6201
E:\BILLS\H2664.IH
H2664
pbinns on DSK79D2C42PROD with BILLS
6
•HR 2664 IH
‘‘(3) ENERGY AND WATER EVALUATIONS AND
1
COMMISSIONING.—
2
‘‘(A) EVALUATIONS.—Except as provided
3
in subparagraph (B), not later than the date
4
that is 180 days after the date of enactment of
5
the All-of-the-Above Federal Building Energy
6
Conservation Act of 2019, and annually there-
7
after, each energy manager shall complete, for
8
the preceding calendar year, a comprehensive
9
energy and water evaluation and recommis-
10
sioning or retrocommissioning for approxi-
11
mately 25 percent of the facilities of the appli-
12
cable agency that meet the criteria under para-
13
graph (2)(B) in a manner that ensures that an
14
evaluation of each such facility is completed not
15
less frequently than once every 4 years.
16
‘‘(B) EXCEPTIONS.—An evaluation and re-
17
commissioning or retrocommissioning shall not
18
be required under subparagraph (A) with re-
19
spect to a facility that, as of the date on which
20
the
evaluation
and
recommissioning
or
21
retrocommissioning would otherwise occur—
22
‘‘(i) has had a comprehensive energy
23
and water evaluation during the preceding
24
8-year period;
25
VerDate Sep 11 2014
23:04 May 20, 2019
Jkt 089200
PO 00000
Frm 00006
Fmt 6652
Sfmt 6201
E:\BILLS\H2664.IH
H2664
pbinns on DSK79D2C42PROD with BILLS
7
•HR 2664 IH
‘‘(ii)(I) has been commissioned, re-
1
commissioned, or retrocommissioned dur-
2
ing the preceding 10-year period; or
3
‘‘(II) is under ongoing commissioning;
4
‘‘(iii) has not had a major change in
5
function or use since the previous evalua-
6
tion and recommissioning;
7
‘‘(iv) has been benchmarked with pub-
8
lic disclosure under paragraph (8) during
9
the preceding calendar year; and
10
‘‘(v)(I) based on the benchmarking de-
11
scribed in clause (iv), has achieved at a fa-
12
cility level the most-recent cumulative en-
13
ergy savings target under subsection (a),
14
as compared to the earlier of—
15
‘‘(aa) the date of the most recent
16
evaluation; and
17
‘‘(bb) the date—
18
‘‘(AA) of the most recent
19
commissioning, recommissioning,
20
or retrocommissioning; or
21
‘‘(BB) on which ongoing
22
commissioning began; or
23
‘‘(II) has a long-term contract in
24
place guaranteeing energy savings at least
25
VerDate Sep 11 2014
23:04 May 20, 2019
Jkt 089200
PO 00000
Frm 00007
Fmt 6652
Sfmt 6201
E:\BILLS\H2664.IH
H2664
pbinns on DSK79D2C42PROD with BILLS
8
•HR 2664 IH
as great as the energy savings target under
1
subclause (I).
2
‘‘(4) IMPLEMENTATION OF IDENTIFIED ENERGY
3
AND
WATER
EFFICIENCY
MEASURES.—Not later
4
than 2 years after the completion of each evaluation
5
under paragraph (3), each energy manager shall—
6
‘‘(A) implement any energy- or water-sav-
7
ing measure that the Federal agency identified
8
in the evaluation conducted that is life cycle
9
cost-effective; and
10
‘‘(B) bundle individual measures of varying
11
paybacks together into combined projects.’’.
12
SEC. 3. FEDERAL BUILDING ENERGY EFFICIENCY PER-
13
FORMANCE
STANDARDS;
CERTIFICATION
14
SYSTEM AND LEVEL FOR GREEN BUILDINGS.
15
(a) DEFINITIONS.—Section 303 of the Energy Con-
16
servation and Production Act (42 U.S.C. 6832) is amend-
17
ed—
18
(1) in each of paragraphs (1) through (16), by
19
inserting a paragraph heading, the text of which is
20
comprised of the term defined in that paragraph;
21
(2) by redesignating paragraphs (2) through
22
(16) (as so amended) as paragraphs (3), (4), (6),
23
(7), (8), (10), (12), (13), (14), (15), (16), (9), (17),
24
VerDate Sep 11 2014
23:04 May 20, 2019
Jkt 089200
PO 00000
Frm 00008
Fmt 6652
Sfmt 6201
E:\BILLS\H2664.IH
H2664
pbinns on DSK79D2C42PROD with BILLS
9
•HR 2664 IH
(5), and (2), respectively, and moving the para-
1
graphs so as to appear in numerical order; and
2
(3) by inserting after paragraph (10) (as so re-
3
designated) the following:
4
‘‘(11) MAJOR RENOVATION.—The term ‘major
5
renovation’ means a modification of the energy sys-
6
tems of a building that is sufficiently extensive to
7
ensure that the entire building can achieve compli-
8
ance with applicable energy standards for new build-
9
ings, based on such criteria as the Secretary shall
10
establish, by regulation.’’.
11
(b) FEDERAL
BUILDING
ENERGY
EFFICIENCY
12
STANDARDS.—Section 305(a)(2)(A) of the Energy Con-
13
servation and Production Act (42 U.S.C. 6834(a)(2)(A))
14
is amended by striking ‘‘the 2004 International Energy
15
Conservation Code (in the case of residential buildings)
16
or ASHRAE Standard 90.1–2004 (in the case of commer-
17
cial buildings)’’ and inserting ‘‘the most recently published
18
edition of the International Energy Conservation Code (in
19
the case of residential buildings) or ASHRAE Standard
20
90.1 (in the case of commercial buildings) on the date of
21
enactment of the All-of-the-Above Federal Building En-
22
ergy Conservation Act of 2019’’.
23
(c) REVISED
FEDERAL
BUILDING
EFFICIENCY
24
STANDARDS.—Section 305(a)(3) of the Energy Conserva-
25
VerDate Sep 11 2014
23:04 May 20, 2019
Jkt 089200
PO 00000
Frm 00009
Fmt 6652
Sfmt 6201
E:\BILLS\H2664.IH
H2664
pbinns on DSK79D2C42PROD with BILLS
10
•HR 2664 IH
tion and Production Act (42 U.S.C. 6834(a)(3)) is amend-
1
ed—
2
(1) by striking ‘‘(3)(A) Not later than’’ and all
3
that follows through subparagraph (B) and inserting
4
the following:
5
‘‘(3) REVISED FEDERAL BUILDING ENERGY EF-
6
FICIENCY
PERFORMANCE
STANDARDS;
CERTIFI-
7
CATION FOR GREEN BUILDINGS.—
8
‘‘(A) REVISED
FEDERAL
BUILDING
EN-
9
ERGY
EFFICIENCY
PERFORMANCE
STAND-
10
ARDS.—
11
‘‘(i) IN GENERAL.—Not later than 1
12
year after the date of enactment of the All-
13
of-the-Above
Federal
Building
Energy
14
Conservation Act of 2019, the Secretary
15
shall establish, by regulation, revised Fed-
16
eral building energy efficiency performance
17
standards that require that—
18
‘‘(I) unless demonstrated not to
19
be life-cycle cost-effective for new
20
Federal buildings and Federal build-
21
ings with major renovations—
22
‘‘(aa) the buildings shall be
23
designed to achieve energy con-
24
sumption levels that are not less
25
VerDate Sep 11 2014
23:04 May 20, 2019
Jkt 089200
PO 00000
Frm 00010
Fmt 6652
Sfmt 6201
E:\BILLS\H2664.IH
H2664
pbinns on DSK79D2C42PROD with BILLS
11
•HR 2664 IH
than 30 percent below the levels
1
established in the most recently
2
published
version
of
the
3
ASHRAE Standard or the Inter-
4
national
Energy
Conservation
5
Code, as appropriate, on the date
6
of enactment of the All-of-the-
7
Above Federal Building Energy
8
Conservation Act of 2019, unless
9
the Secretary determines, pursu-
10
ant to subparagraph (B), that a
11
subsequent version of such a
12
standard or code shall apply; and
13
‘‘(bb)
sustainable
design
14
principles are applied to the loca-
15
tion, siting, design, and construc-
16
tion of all new Federal buildings
17
and replacement Federal build-
18
ings;
19
‘‘(II) if water is used to achieve
20
energy efficiency, water conservation
21
technologies shall be applied to the ex-
22
tent that the technologies are life-
23
cycle cost-effective; and
24
VerDate Sep 11 2014
23:04 May 20, 2019
Jkt 089200
PO 00000
Frm 00011
Fmt 6652
Sfmt 6201
E:\BILLS\H2664.IH
H2664
pbinns on DSK79D2C42PROD with BILLS
12
•HR 2664 IH
‘‘(III) if life-cycle cost-effective,
1
as compared to other reasonably avail-
2
able technologies, not less than 30
3
percent of the hot water demand for
4
each new Federal building or Federal
5
building undergoing a major renova-
6
tion shall be met through the installa-
7
tion and use of solar hot water heat-
8
ers.
9
‘‘(B) UPDATES.—Not later than 1 year
10
after the date of approval of each subsequent
11
revision of the ASHRAE Standard or the Inter-
12
national Energy Conservation Code, as appro-
13
priate, the Secretary shall determine whether
14
the revised standards established under sub-
15
paragraph (A) and the Federal building energy
16
standards established under paragraph (1)
17
should be updated to reflect the revisions, based
18
on the energy savings and life-cycle cost-effec-
19
tiveness of the revisions.’’;
20
(2) in subparagraph (C)—
21
(A) by striking ‘‘(C) In the budget re-
22
quest’’ and inserting the following:
23
‘‘(C) BUDGET
REQUEST.—In the budget
24
request’’; and
25
VerDate Sep 11 2014
23:04 May 20, 2019
Jkt 089200
PO 00000
Frm 00012
Fmt 6652
Sfmt 6201
E:\BILLS\H2664.IH
H2664
pbinns on DSK79D2C42PROD with BILLS
13
•HR 2664 IH
(B) by indenting clauses (i) and (ii) appro-
1
priately; and
2
(3) in subparagraph (D)—
3
(A) in the matter preceding clause (i), by
4
striking ‘‘that require that:’’ and inserting
5
‘‘tha
[Text truncated for display. Full text available on Congress.gov.]
Important: This plain English summary was generated by AI and is provided for informational purposes only.
It is not legal advice. Always consult the official bill text on Congress.gov
or a qualified attorney for legal matters.