I
116TH CONGRESS
1ST SESSION H. R. 2139
To amend title 49, United States Code, to improve pipeline safety, and
for other purposes.
IN THE HOUSE OF REPRESENTATIVES
APRIL 8, 2019
Mrs. TRAHAN (for herself, Mr. MOULTON, and Mr. KENNEDY) introduced the
following bill; which was referred to the Committee on Transportation
and Infrastructure, and in addition to the Committee on Energy and
Commerce, for a period to be subsequently determined by the Speaker,
in each case for consideration of such provisions as fall within the juris-
diction of the committee concerned
A BILL
To amend title 49, United States Code, to improve pipeline
safety, and for other purposes.
Be it enacted by the Senate and House of Representa-
1
tives of the United States of America in Congress assembled,
2
SECTION 1. SHORT TITLE.
3
This Act may be cited as the ββLeonel Rondon Pipe-
4
line Safety Actββ.
5
VerDate Sep 11 2014
01:16 Apr 18, 2019
Jkt 089200
PO 00000
Frm 00001
Fmt 6652
Sfmt 6201
E:\BILLS\H2139.IH
H2139
pamtmann on DSKBFK8HB2PROD with BILLS
2
β’HR 2139 IH
SEC. 2. DISTRIBUTION INTEGRITY MANAGEMENT PLANS.
1
(a) IN GENERAL.βSection 60109(e) of title 49,
2
United States Code, is amended by adding at the end the
3
following:
4
ββ(7) IN GENERAL.β
5
ββ(A) EVALUATION
OF
RISK.βNot later
6
than 1 year after the date of enactment of this
7
paragraph, the Secretary shall promulgate regu-
8
lations that ensure that each distribution integ-
9
rity management plan developed by an operator
10
of a distribution pipeline includes an evaluation
11
ofβ
12
ββ(i) the risks resulting from the pres-
13
ence of cast iron pipes and mains in the
14
distribution system; and
15
ββ(ii) the risks that could lead to or re-
16
sult from the operation of a distribution
17
pipeline above the maximum allowable op-
18
erating pressure (as described in section
19
192.619 of title 49, Code of Federal Regu-
20
lations (or successor regulations)).
21
ββ(B) CONSIDERATION.βIn the evaluations
22
required in a plan under subparagraph (A), the
23
regulations promulgated by the Secretary shall
24
ensure that the distribution integrity manage-
25
ment plan evaluates future potential threats in
26
VerDate Sep 11 2014
01:16 Apr 18, 2019
Jkt 089200
PO 00000
Frm 00002
Fmt 6652
Sfmt 6201
E:\BILLS\H2139.IH
H2139
pamtmann on DSKBFK8HB2PROD with BILLS
3
β’HR 2139 IH
a manner that considers factors other than past
1
observed abnormal operating conditions (as de-
2
fined in section 192.803 of title 49, Code of
3
Federal Regulations (or successor regulations))
4
in ranking risks and identifying measures to
5
mitigate those risks under that subparagraph,
6
so that operators avoid using a risk rating of
7
zero for low probability events unless otherwise
8
supported by engineering analysis.
9
ββ(C) DEADLINES.β
10
ββ(i) IN
GENERAL.βNot later than
11
180 days after the date of enactment of
12
this paragraph, each operator of a dis-
13
tribution pipeline shall submit to the Sec-
14
retary or to the relevant certified State au-
15
thority, if applicable, a copy ofβ
16
ββ(I) the distribution integrity
17
management plan of the operator;
18
ββ(II) the emergency response
19
plan under section 192.615 of title 49,
20
Code of Federal Regulations (or suc-
21
cessor regulations); and
22
ββ(III) the procedural manual for
23
operations, maintenance, and emer-
24
gencies under section 192.605 of title
25
VerDate Sep 11 2014
01:16 Apr 18, 2019
Jkt 089200
PO 00000
Frm 00003
Fmt 6652
Sfmt 6201
E:\BILLS\H2139.IH
H2139
pamtmann on DSKBFK8HB2PROD with BILLS
4
β’HR 2139 IH
49, Code of Federal Regulations (or
1
successor regulations).
2
ββ(ii) UPDATES.βEach operator of a
3
distribution pipeline shall submit to the
4
Secretary an updated plan or manual de-
5
scribed in clause (i) by not later than 60
6
days after the date of the update.ββ.
7
(b) MONITORING.βSection 60105(e) of title 49,
8
United States Code, is amendedβ
9
(1) in the second sentence, by striking ββA
10
Stateββ and inserting the following:
11
ββ(2) COOPERATION.βA Stateββ;
12
(2) by striking ββThe Secretaryββ and inserting
13
the following:
14
ββ(1) IN GENERAL.βThe Secretaryββ; and
15
(3) by adding at the end the following:
16
ββ(3) AUDIT PROGRAM.βNot later than 1 year
17
after the date of enactment of this paragraph, the
18
Secretary shall promulgate regulations to update the
19
annual State Program Evaluations toβ
20
ββ(A) ensure that a State authority has the
21
capability to sufficiently review and evaluate the
22
adequacy of the plans and manuals described in
23
section 60109(e)(7)(C)(i); and
24
VerDate Sep 11 2014
01:16 Apr 18, 2019
Jkt 089200
PO 00000
Frm 00004
Fmt 6652
Sfmt 6201
E:\BILLS\H2139.IH
H2139
pamtmann on DSKBFK8HB2PROD with BILLS
5
β’HR 2139 IH
ββ(B) require that a State authority has a
1
sufficient number of inspectors to ensure safe
2
operations, as determined by a formula that
3
takes into account factors including but not
4
limited toβ
5
ββ(i) the number of miles of cast iron
6
pipe in the State;
7
ββ(ii) the number of customers in the
8
State;
9
ββ(iii) population density in areas with
10
gas distribution pipeline;
11
ββ(iv) the age of the gas distribution
12
system in the State; and
13
ββ(v) environmental factors, including
14
relevant geological issues.ββ.
15
SEC. 3. EMERGENCY RESPONSE PLANS.
16
Section 60102 of title 49, United States Code, is
17
amended by adding at the end the following:
18
ββ(q) EMERGENCY
RESPONSE
PLANS.βNot later
19
than 1 year after the date of the enactment of this sub-
20
section, the Secretary shall promulgate regulations to en-
21
sure that each emergency response plan under section
22
192.615 of title 49, Code of Federal Regulations (or suc-
23
cessor regulations), developed by an operator of a distribu-
24
tion pipeline includes written procedures forβ
25
VerDate Sep 11 2014
01:16 Apr 18, 2019
Jkt 089200
PO 00000
Frm 00005
Fmt 6652
Sfmt 6201
E:\BILLS\H2139.IH
H2139
pamtmann on DSKBFK8HB2PROD with BILLS
6
β’HR 2139 IH
ββ(1) establishing communication with fire, po-
1
lice, and other relevant public officials as soon as
2
practicable, but not later than 30 minutes, after a
3
gas pipeline emergency thatβ
4
ββ(A) includes fires, explosions, or one or
5
more fatalities; or
6
ββ(B) results in the shutdown of gas service
7
to more than 100 customers;
8
ββ(2) establishing public communication as soon
9
as practicable and in consultation with fire, police,
10
and other public officials after a gas pipeline emer-
11
gency thatβ
12
ββ(A) includes fires, explosions, or one or
13
more fatalities; or
14
ββ(B) results in the shutdown of gas service
15
to more than 100 customers; and
16
ββ(3) the development and implementation of a
17
voluntary, opt-in system that would allow operators
18
of distribution pipelines to rapidly communicate with
19
customers in the event of an emergency.ββ.
20
SEC. 4. OPERATIONS AND MAINTENANCE MANUALS.
21
Section 60102 of title 49, United States Code (as
22
amended by section 3), is amended by adding at the end
23
the following:
24
VerDate Sep 11 2014
01:16 Apr 18, 2019
Jkt 089200
PO 00000
Frm 00006
Fmt 6652
Sfmt 6201
E:\BILLS\H2139.IH
H2139
pamtmann on DSKBFK8HB2PROD with BILLS
7
β’HR 2139 IH
ββ(r) OPERATIONS AND MAINTENANCE MANUALS.β
1
Not later than 1 year after the date of enactment of this
2
subsection, the Secretary shall promulgate regulations to
3
ensure that each procedural manual for operations, main-
4
tenance, and emergencies under section 192.605 of title
5
49, Code of Federal Regulations (or successor regula-
6
tions), developed by an operator of a distribution pipeline
7
includes written procedures forβ
8
ββ(1) responding to overpressurization alarms,
9
including a clear timeline and order of operations for
10
shutting down portions of the gas distribution sys-
11
tem, if necessary; and
12
ββ(2) a detailed procedure for a management of
13
change process, which shall be applied to all changes
14
to the distribution system, and which shall ensure
15
that relevant employees of an operator of a distribu-
16
tion pipeline, as determined through the regulations,
17
review construction documents for accuracy, com-
18
pleteness, and correctness.ββ.
19
SEC. 5. PIPELINE SAFETY MANAGEMENT SYSTEMS.
20
Section 60102 of title 49, United States Code (as
21
amended by section 4), is amended by adding at the end
22
the following:
23
ββ(s) PIPELINE SAFETY MANAGEMENT SYSTEMS.β
24
VerDate Sep 11 2014
01:16 Apr 18, 2019
Jkt 089200
PO 00000
Frm 00007
Fmt 6652
Sfmt 6201
E:\BILLS\H2139.IH
H2139
pamtmann on DSKBFK8HB2PROD with BILLS
8
β’HR 2139 IH
ββ(1) IN GENERAL.βNot later than 1 year after
1
the date of enactment of this subsection, the Sec-
2
retary shall promulgate regulations directing each
3
operator of a distribution pipeline to develop and im-
4
plement a pipeline safety management systems
5
framework in accordance with Recommended Prac-
6
tice 1173 of the American Petroleum Institute (API
7
RP 1173).
8
ββ(2) UPDATES.βThe Secretary may periodi-
9
cally revise such regulations to adopt new best in-
10
dustry practices for promoting safety management
11
systems, as appropriate.
12
ββ(3) SUBMISSION.βEach operator of a dis-
13
tribution pipeline shall submit to the Secretary or
14
the relevant State authority, as certified under sec-
15
tion 60105 of title 49, United States Codeβ
16
ββ(A) a copy of the pipeline safety manage-
17
ment systems framework developed under para-
18
graph (1) by not later than 2 years after the
19
date of enactment of this subsection; and
20
ββ(B) any updates to the framework de-
21
scribed in subparagraph (A) by not later than
22
3 years after the date of enactment of this sub-
23
section after the update.
24
VerDate Sep 11 2014
01:16 Apr 18, 2019
Jkt 089200
PO 00000
Frm 00008
Fmt 6652
Sfmt 6201
E:\BILLS\H2139.IH
H2139
pamtmann on DSKBFK8HB2PROD with BILLS
9
β’HR 2139 IH
ββ(4)
EVALUATION
AND
CERTIFICATION.β
1
Under a timeline established by the Secretary
2
through regulation, the Secretary or the relevant
3
State authority, as certified under section 60105 of
4
title 49, United States Code, shallβ
5
ββ(A) evaluate pipeline safety management
6
systems frameworks developed under paragraph
7
(1), including by using independent third-party
8
evaluators if necessary; and
9
ββ(B) certify thatβ
10
ββ(i) those frameworks are effective
11
and complete; and
12
ββ(ii) operators of distribution pipe-
13
lines are in compliance with those frame-
14
works.ββ.
15
SEC. 6. PIPELINE SAFETY PRACTICES.
16
Section 60102 of title 49, United States Code (as
17
amended by section 5), is amended by adding at the end
18
the following:
19
ββ(t) OTHER PIPELINE SAFETY PRACTICES.β
20
ββ(1) RECORDS.βNot later than 180 days after
21
the date of enactment of this subsection, the Sec-
22
retary shall promulgate regulations to require an op-
23
erator of a distribution pipelineβ
24
VerDate Sep 11 2014
01:16 Apr 18, 2019
Jkt 089200
PO 00000
Frm 00009
Fmt 6652
Sfmt 6201
E:\BILLS\H2139.IH
H2139
pamtmann on DSKBFK8HB2PROD with BILLS
10
β’HR 2139 IH
ββ(A) to develop and maintain traceable, re-
1
liable, complete, and up-to-date records of the
2
gas distribution system in each region of oper-
3
ation that depict high-, medium-, and low-gas
4
pressure systems, including maps and other
5
drawings; and
6
ββ(B) to ensure that the records described
7
in subparagraph (A) are accessible to all em-
8
ployees of the operator and provided to the Sec-
9
retary or the relevant State authority.
10
ββ(2) APPROVAL OF CERTAIN ACTIVITIES.β
11
ββ(A) IN GENERAL.βNot later than 1 year
12
after the date of enactment of this subsection,
13
the Secretary shall promulgate regulations to
14
require that, before carrying out any covered
15
task (as defined in section 192.801(b) of title
16
49, Code of Federal Regulations (or successor
17
regulations)), the covered task is approved by a
18
professional engineer licensed to practice in the
19
State in which it is to be carried out.
20
ββ(B) INCLUSION.βIn promulgating regula-
21
tions under subparagraph (A), the Secretary
22
shall ensure that professional engineers are pro-
23
vided access to all relevant records and prior
24
VerDate Sep 11 2014
01:16 Apr 18, 2019
Jkt 089200
PO 00000
Frm 00010
Fmt 6652
Sfmt 6201
E:\BILLS\H2139.IH
H2139
pamtmann on DSKBFK8HB2PROD with BILLS
11
β’HR 2139 IH
work plans needed to certify the safety of the
1
covered task.
2
ββ(C) APPLICATION.βThe following provi-
3
sions shall not apply to a standard promulgated
4
under subparagraph (A):
5
ββ(i) Subsections (c) and (d) of section
6
60118.
7
ββ(ii) Section 60131(e)(5).
8
ββ(3) PRESENCE OF QUALIFIED EMPLOYEES.β
9
ββ(A) IN
GENERAL.βNot later than 180
10
days after the date of enactment of this sub-
11
section, the Secretary shall promulgate regula-
12
tions to require that not less than 1 employee
13
of an operator of a distribution pipeline who is
14
qualified to perform relevant covered tasks (as
15
defined in section 192.801(b) of title 49, Code
16
of Federal Regulations (or successor regula-
17
tions)), shall monitor gas pressure and have the
18
capability to shut down the flow of gas at a dis-
19
trict regulator station during any construction
20
project that has the potential to cause a haz-
21
ardous over-pressurization at that station, in-
22
cluding tie-ins and abandonment of distribution
23
lines and mains, based on an evaluation of
24
VerDate Sep 11 2014
01:16 Apr 18, 2019
Jkt 089200
PO 00000
Frm 00011
Fmt 6652
Sfmt 6201
E:\BILLS\H2139.IH
H2139
pamtmann on DSKBFK8HB2PROD with BILLS
12
β’HR 2139 IH
threats that could result in unsafe operation
1
conducted by the operator.
2
ββ(B) EXCLUSION.βIn promulgating regu-
3
lations under subparagraph (A), the Secretary
4
shall ensure that those regulations do not apply
5
to a district regulating station that has a moni-
6
toring system and the capability for remote or
7
automatic shutoff.
8
ββ(4) DISTRICT REGULATOR STATIONS.β
9
ββ(A) IN GENERAL.βNot later than 1 year
10
after the date of enactment of this subsection,
11
the Secretary shall promulgate regulations to
12
require that each operator of a distribution
13
pipeline assesses and upgrades, as appropriate,
14
each district regulator station of the operator to
15
ensure thatβ
16
ββ(i) there is no possibility for a com-
17
mon mode of failure in the regulator tech-
18
nology of the station that could lead to an
19
operating pressure that is greater than the
20
maximum allowable operating pressure (as
21
described in section 192.619 of title 49,
22
Code of Federal Regulations (or successor
23
regulations));
24
VerDate Sep 11 2014
01:16 Apr 18, 2019
Jkt 089200
PO 00000
Frm 00012
Fmt 6652
Sfmt 6201
E:\BILLS\H2139.IH
H2139
pamtmann on DSKBFK8HB2PROD with BILLS
13
β’HR 2139 IH
ββ(ii) the station has monitoring tech-
1
nology that provides constant awareness of
2
gas press
[Text truncated for display. Full text available on Congress.gov.]
Important: This plain English summary was generated by AI and is provided for informational purposes only.
It is not legal advice. Always consult the official bill text on Congress.gov
or a qualified attorney for legal matters.