Plain English summary not yet available
The full original text is available below. Check back soon as we process this bill.
I
116TH CONGRESS
1ST SESSION
H. R. 967
To authorize the construction of the Musselshell-Judith Rural Water System
and study of the Dry-Redwater Regional Water Authority System in
the States of Montana and North Dakota, and for other purposes.
IN THE HOUSE OF REPRESENTATIVES
FEBRUARY 5, 2019
Mr. GIANFORTE introduced the following bill; which was referred to the
Committee on Natural Resources
A BILL
To authorize the construction of the Musselshell-Judith
Rural Water System and study of the Dry-Redwater
Regional Water Authority System in the States of Mon-
tana and North Dakota, and for other purposes.
Be it enacted by the Senate and House of Representa-
1
tives of the United States of America in Congress assembled,
2
SECTION 1. SHORT TITLE.
3
This Act may be cited as the ‘‘Clean Water for Rural
4
Communities Act’’.
5
VerDate Sep 11 2014
04:22 Feb 15, 2019
Jkt 089200
PO 00000
Frm 00001
Fmt 6652
Sfmt 6201
E:\BILLS\H967.IH
H967
kjohnson on DSK79L0C42 with BILLS
2
•HR 967 IH
SEC. 2. PURPOSE.
1
The purpose of this Act is to ensure a safe and ade-
2
quate municipal, rural, and industrial water supply for the
3
citizens of—
4
(1) Dawson, Garfield, McCone, Prairie, Rich-
5
land, Judith Basin, Wheatland, Golden Valley, Fer-
6
gus, Yellowstone, and Musselshell Counties in the
7
State of Montana; and
8
(2) McKenzie County, North Dakota.
9
SEC. 3. DEFINITIONS.
10
In this Act:
11
(1)
AUTHORITY.—The
term
‘‘Authority’’
12
means—
13
(A) the Central Montana Regional Water
14
Authority, a publicly owned nonprofit water au-
15
thority formed in accordance with Mont. Code
16
Ann. § 75–6–302 (2007); and
17
(B) any nonprofit successor entity to the
18
Authority described in subparagraph (A).
19
(2) MUSSELSHELL-JUDITH RURAL WATER SYS-
20
TEM.—The term ‘‘Musselshell-Judith Rural Water
21
System’’ means the Musselshell-Judith Rural Water
22
System authorized under section 4(a), with a project
23
service area that includes—
24
(A) Judith Basin, Wheatland, Golden Val-
25
ley, and Musselshell Counties in the State;
26
VerDate Sep 11 2014
04:22 Feb 15, 2019
Jkt 089200
PO 00000
Frm 00002
Fmt 6652
Sfmt 6201
E:\BILLS\H967.IH
H967
kjohnson on DSK79L0C42 with BILLS
3
•HR 967 IH
(B) the portion of Yellowstone County in
1
the State within 2 miles of State Highway 3
2
and within 4 miles of the county line between
3
Golden Valley and Yellowstone Counties in the
4
State, inclusive of the Town of Broadview,
5
Montana; and
6
(C) the portion of Fergus County in the
7
State within 2 miles of U.S. Highway 87 and
8
within 4 miles of the county line between Fer-
9
gus and Judith Basin Counties in the State, in-
10
clusive of the Town of Moore, Montana.
11
(3) SECRETARY.—The term ‘‘Secretary’’ means
12
the Secretary of the Interior.
13
(4) STATE.—The term ‘‘State’’ means the State
14
of Montana.
15
SEC. 4. MUSSELSHELL-JUDITH RURAL WATER SYSTEM.
16
(a) AUTHORIZATION.—The Secretary may carry out
17
the planning, design, and construction of the Musselshell-
18
Judith Rural Water System in a manner that is substan-
19
tially in accordance with the feasibility report entitled
20
‘‘Musselshell-Judith Rural Water System Feasibility Re-
21
port’’ (including any and all revisions of the report).
22
(b) COOPERATIVE AGREEMENT.—The Secretary shall
23
enter into a cooperative agreement with the Authority to
24
provide Federal assistance for the planning, design, and
25
VerDate Sep 11 2014
04:22 Feb 15, 2019
Jkt 089200
PO 00000
Frm 00003
Fmt 6652
Sfmt 6201
E:\BILLS\H967.IH
H967
kjohnson on DSK79L0C42 with BILLS
4
•HR 967 IH
construction of the Musselshell-Judith Rural Water Sys-
1
tem.
2
(c) COST-SHARING REQUIREMENT.—
3
(1) FEDERAL SHARE.—
4
(A) IN GENERAL.—The Federal share of
5
the costs relating to the planning, design, and
6
construction of the Musselshell-Judith Rural
7
Water System shall not exceed 65 percent of
8
the total cost of the Musselshell-Judith Rural
9
Water System.
10
(B) LIMITATION.—Amounts made avail-
11
able under subparagraph (A) shall not be re-
12
turnable or reimbursable under the reclamation
13
laws.
14
(2) USE OF FEDERAL FUNDS.—
15
(A) GENERAL USES.—Subject to subpara-
16
graph (B), the Musselshell-Judith Rural Water
17
System may use Federal funds made available
18
to carry out this section for—
19
(i) facilities relating to—
20
(I) water pumping;
21
(II) water treatment;
22
(III) water storage;
23
(IV) water supply wells;
24
(V) distribution pipelines; and
25
VerDate Sep 11 2014
04:22 Feb 15, 2019
Jkt 089200
PO 00000
Frm 00004
Fmt 6652
Sfmt 6201
E:\BILLS\H967.IH
H967
kjohnson on DSK79L0C42 with BILLS
5
•HR 967 IH
(VI) control systems;
1
(ii) transmission pipelines;
2
(iii) pumping stations;
3
(iv) appurtenant buildings, mainte-
4
nance equipment, and access roads;
5
(v) any interconnection facility that
6
connects a pipeline of the Musselshell-Ju-
7
dith Rural Water System to a pipeline of
8
a public water system;
9
(vi) electrical power transmission and
10
distribution facilities required for the oper-
11
ation and maintenance of the Musselshell-
12
Judith Rural Water System;
13
(vii) any other facility or service re-
14
quired for the development of a rural water
15
distribution system, as determined by the
16
Secretary; and
17
(viii) any property or property right
18
required for the construction or operation
19
of a facility described in this subsection.
20
(B) LIMITATION.—Federal funds made
21
available to carry out this section shall not be
22
used for the operation, maintenance, or replace-
23
ment of the Musselshell-Judith Rural Water
24
System.
25
VerDate Sep 11 2014
04:22 Feb 15, 2019
Jkt 089200
PO 00000
Frm 00005
Fmt 6652
Sfmt 6201
E:\BILLS\H967.IH
H967
kjohnson on DSK79L0C42 with BILLS
6
•HR 967 IH
(C) TITLE.—Title to the Musselshell-Ju-
1
dith Rural Water System shall be held by the
2
Authority.
3
SEC. 5. DRY-REDWATER FEASIBILITY STUDY.
4
(a) DEFINITIONS.—In this section:
5
(1) DRY-REDWATER
REGIONAL
WATER
AU-
6
THORITY.—The
term
‘‘Dry-Redwater
Regional
7
Water Authority’’ means—
8
(A) the Dry-Redwater Regional Water Au-
9
thority, a publicly owned nonprofit water au-
10
thority formed in accordance with Mont. Code
11
Ann. § 75–6–302 (2007); and
12
(B) any nonprofit successor entity to the
13
Authority described in subparagraph (A).
14
(2) DRY-REDWATER
REGIONAL
WATER
AU-
15
THORITY
SYSTEM.—The term ‘‘Dry-Redwater Re-
16
gional Water Authority System’’ means the project
17
entitled the ‘‘Dry-Redwater Regional Water Author-
18
ity System’’, with a project service area that in-
19
cludes—
20
(A) Garfield and McCone Counties in the
21
State;
22
(B) the area west of the Yellowstone River
23
in Dawson and Richland Counties in the State;
24
VerDate Sep 11 2014
04:22 Feb 15, 2019
Jkt 089200
PO 00000
Frm 00006
Fmt 6652
Sfmt 6201
E:\BILLS\H967.IH
H967
kjohnson on DSK79L0C42 with BILLS
7
•HR 967 IH
(C) T. 15 N. (including the area north of
1
the Township) in Prairie County in the State;
2
and
3
(D) the portion of McKenzie County,
4
North Dakota, that includes all land that is lo-
5
cated west of the Yellowstone River in the State
6
of North Dakota.
7
(3) RECLAMATION FEASIBILITY STANDARDS.—
8
The term ‘‘reclamation feasibility standards’’ means
9
the eligibility criteria and feasibility study require-
10
ments described in section 106 of the Reclamation
11
Rural Water Supply Act of 2006 (43 U.S.C. 2405)
12
(as in effect on September 29, 2016).
13
(4) SUBMITTED
FEASIBILITY
STUDY.—The
14
term ‘‘submitted feasibility study’’ means the feasi-
15
bility study entitled ‘‘Dry-Redwater Regional Water
16
System Feasibility Study’’ (including revisions of the
17
study), which received funding from the Bureau of
18
Reclamation on September 1, 2010.
19
(b) STUDY.—
20
(1) IN GENERAL.—The Secretary, in consulta-
21
tion with the Dry-Redwater Regional Water Author-
22
ity, may undertake a study, including a review of the
23
submitted feasibility study, to determine the feasi-
24
VerDate Sep 11 2014
04:22 Feb 15, 2019
Jkt 089200
PO 00000
Frm 00007
Fmt 6652
Sfmt 6201
E:\BILLS\H967.IH
H967
kjohnson on DSK79L0C42 with BILLS
8
•HR 967 IH
bility of constructing the Dry-Redwater Regional
1
Water System.
2
(2) REQUIREMENT.—The study under para-
3
graph (1) shall comply with the reclamation feasi-
4
bility standards.
5
(c) COOPERATIVE AGREEMENT.—If the Secretary de-
6
termines that the study under subsection (b) does not
7
comply with the reclamation feasibility standards, the Sec-
8
retary may enter into a cooperative agreement with the
9
Dry-Redwater Regional Water Authority to complete addi-
10
tional work to ensure that the study complies with the rec-
11
lamation feasibility standards.
12
(d) AUTHORIZATION OF APPROPRIATIONS.—There is
13
authorized to be appropriated to the Secretary $5,000,000
14
to carry out this section.
15
(e) TERMINATION.—The authority provided by this
16
section shall expire on the date that is 5 years after the
17
date of enactment of this Act.
18
SEC. 6. WATER RIGHTS.
19
Nothing in this Act—
20
(1) preempts or affects any State water law; or
21
(2) affects any authority of a State, as in effect
22
on the date of enactment of this Act, to manage
23
water resources within that State.
24
VerDate Sep 11 2014
04:22 Feb 15, 2019
Jkt 089200
PO 00000
Frm 00008
Fmt 6652
Sfmt 6201
E:\BILLS\H967.IH
H967
kjohnson on DSK79L0C42 with BILLS
9
•HR 967 IH
SEC. 7. AUTHORIZATION OF APPROPRIATIONS.
1
(a) AUTHORIZATION.—There is authorized to be ap-
2
propriated to carry out the planning, design, and construc-
3
tion of the Musselshell-Judith Rural Water System, sub-
4
stantially in accordance with the cost estimate set forth
5
in the feasibility report described in section 4(a),
6
$56,650,000.
7
(b) COST INDEXING.—The amount authorized to be
8
appropriated under subsection (a) may be increased or de-
9
creased in accordance with ordinary fluctuations in devel-
10
opment costs incurred after November 1, 2014, as indi-
11
cated by any available engineering cost indices applicable
12
to construction activities that are similar to the construc-
13
tion of the Musselshell-Judith Rural Water System.
14
Æ
VerDate Sep 11 2014
04:22 Feb 15, 2019
Jkt 089200
PO 00000
Frm 00009
Fmt 6652
Sfmt 6301
E:\BILLS\H967.IH
H967
kjohnson on DSK79L0C42 with BILLS
Important: This plain English summary was generated by AI and is provided for informational purposes only.
It is not legal advice. Always consult the official bill text on Congress.gov
or a qualified attorney for legal matters.