Plain English summary not yet available
The full original text is available below. Check back soon as we process this bill.
I
116TH CONGRESS
1ST SESSION
H. R. 700
To increase the number of operational aircraft carriers of the Navy, and
for other purposes.
IN THE HOUSE OF REPRESENTATIVES
JANUARY 22, 2019
Mr. CONAWAY introduced the following bill; which was referred to the
Committee on Armed Services
A BILL
To increase the number of operational aircraft carriers of
the Navy, and for other purposes.
Be it enacted by the Senate and House of Representa-
1
tives of the United States of America in Congress assembled,
2
SECTION 1. SHORT TITLE.
3
This Act may be cited as the ‘‘12 Carrier Act’’.
4
SEC. 2. FINDINGS.
5
Congress finds the following:
6
(1) The aircraft carrier can fulfill the Navy’s
7
core missions of forward presence, sea control, en-
8
suring safe sea lanes, and power projection as well
9
VerDate Sep 11 2014
01:57 Feb 05, 2019
Jkt 089200
PO 00000
Frm 00001
Fmt 6652
Sfmt 6201
E:\BILLS\H700.IH
H700
pbinns on DSK79D2C42PROD with BILLS
2
•HR 700 IH
as providing flexibility and versatility to execute a
1
wide range of additional missions.
2
(2) Forward airpower is integral to the security
3
and joint forces operations of the United States.
4
Carriers play a central role in delivering forward air-
5
power from sovereign territory of the United States
6
in both permissive and nonpermissive environments.
7
(3) Aircraft carriers provide our Nation the
8
ability to rapidly and decisively respond to national
9
threats, as well as conducting worldwide, on-station
10
diplomacy and providing deterrence against threats
11
to the United States allies, partners, and friends.
12
(4) Since the end of the cold war, aircraft car-
13
rier deployments have increased while the aircraft
14
carrier force structure has declined.
15
(5) Considering the increased array of complex
16
threats across the globe, the Navy aircraft carrier is
17
operating at maximum capacity, increasing deploy-
18
ment lengths and decreasing maintenance periods in
19
order to meet operational requirements.
20
(6) To meet global peacetime and wartime re-
21
quirements, the Navy has indicated a requirement to
22
maintain two aircraft carriers deployed overseas and
23
have three additional aircraft carriers capable of de-
24
ploying within 90 days. However, the Navy has indi-
25
VerDate Sep 11 2014
01:57 Feb 05, 2019
Jkt 089200
PO 00000
Frm 00002
Fmt 6652
Sfmt 6201
E:\BILLS\H700.IH
H700
pbinns on DSK79D2C42PROD with BILLS
3
•HR 700 IH
cated that the existing aircraft carrier force struc-
1
ture cannot support these military requirements.
2
(7) Despite the requirement to maintain an air-
3
craft carrier strike group in both the United States
4
Central Command and United States Pacific Com-
5
mand, the Navy has been unable to generate suffi-
6
cient capacity to support our combatant com-
7
manders and has developed significant carrier gaps
8
in these critical areas.
9
(8) Because of continuing use of a diminished
10
aircraft carrier force structure, extensive mainte-
11
nance availabilities result which typically exceed pro-
12
gram costs and increase time in shipyards. These ex-
13
pansive maintenance availabilities exacerbate exist-
14
ing carrier gaps.
15
(9) Because of maintenance overhaul exten-
16
sions, the Navy is truncating basic aircraft carrier
17
training to expedite the deployment of available air-
18
craft carriers. Limiting aircraft carrier training de-
19
creases operational capabilities and increases sailor
20
risk.
21
(10) The Navy has adopted a two-phase acqui-
22
sition strategy for the U.S.S. John F. Kennedy
23
(CVN–79), an action that will delay the introduction
24
VerDate Sep 11 2014
01:57 Feb 05, 2019
Jkt 089200
PO 00000
Frm 00003
Fmt 6652
Sfmt 6201
E:\BILLS\H700.IH
H700
pbinns on DSK79D2C42PROD with BILLS
4
•HR 700 IH
of this aircraft carrier by up to two years, exacer-
1
bating existing carrier gaps.
2
(11) Developing an alternative design to the
3
Ford-class aircraft carrier is not cost beneficial. A
4
smaller design is projected to incur significant de-
5
sign and engineering cost while significantly reduc-
6
ing magazine size, carrier air wing size, sortie rate,
7
and on-station effectiveness among other vital fac-
8
tors when compared to the Ford class. Furthermore,
9
a new design will delay the introduction of future
10
aircraft carriers, exacerbating existing carrier gaps
11
and threatening the national security of the United
12
States.
13
SEC. 3. INCREASE IN NUMBER OF OPERATIONAL AIRCRAFT
14
CARRIERS OF THE NAVY.
15
(a) INCREASE.—Section 8062(b) of title 10, United
16
States Code, is amended by striking ‘‘11 operational air-
17
craft carriers’’ and inserting ‘‘12 operational aircraft car-
18
riers’’.
19
(b) EFFECTIVE DATE.—The amendment made by
20
subsection (a) shall take effect on September 30, 2023.
21
Æ
VerDate Sep 11 2014
01:57 Feb 05, 2019
Jkt 089200
PO 00000
Frm 00004
Fmt 6652
Sfmt 6301
E:\BILLS\H700.IH
H700
pbinns on DSK79D2C42PROD with BILLS
Important: This plain English summary was generated by AI and is provided for informational purposes only.
It is not legal advice. Always consult the official bill text on Congress.gov
or a qualified attorney for legal matters.