Plain English summary not yet available
The full original text is available below. Check back soon as we process this bill.
I
117TH CONGRESS
1ST SESSION H. R. 2854
To amend the Federal Power Act to require the Electric Reliability Organiza-
tion to propose a reliability standard that addresses the resilience of
the bulk-power system, and for other purposes.
IN THE HOUSE OF REPRESENTATIVES
APRIL 26, 2021
Mr. THOMPSON of California (for himself, Mr. DESAULNIER, Ms. ESHOO, Mr.
GARAMENDI, Mr. HUFFMAN, Mr. KHANNA, Mr. LAMALFA, Ms. MATSUI,
and Mr. PANETTA) introduced the following bill; which was referred to
the Committee on Energy and Commerce
A BILL
To amend the Federal Power Act to require the Electric
Reliability Organization to propose a reliability standard
that addresses the resilience of the bulk-power system,
and for other purposes.
Be it enacted by the Senate and House of Representa-
1
tives of the United States of America in Congress assembled,
2
SECTION 1. SHORT TITLE.
3
This Act may be cited as the ‘‘Utility Resilience and
4
Reliability Act’’.
5
VerDate Sep 11 2014
05:54 Jun 17, 2021
Jkt 019200
PO 00000
Frm 00001
Fmt 6652
Sfmt 6201
E:\BILLS\H2854.IH
H2854
pbinns on DSKJLVW7X2PROD with BILLS
2
•HR 2854 IH
SEC. 2. PROPOSED RELIABILITY STANDARD.
1
Section 215(d) of the Federal Power Act (16 U.S.C.
2
824o(d)) is amended by adding at the end the following
3
new paragraph:
4
‘‘(7) RESILIENCE OF BULK-POWER SYSTEM.—
5
‘‘(A) IN GENERAL.—Not later than 1 year after
6
the date of enactment of this paragraph, the Electric
7
Reliability Organization shall file with the Commis-
8
sion a proposed reliability standard that addresses
9
the resilience of the bulk-power system.
10
‘‘(B) REGIONAL DIFFERENCES.—The proposed
11
reliability standard filed under subsection (A) shall
12
take into account regional differences.
13
‘‘(C) RESILIENCE
DEFINED.—In this para-
14
graph, the term ‘resilience’ means the ability to—
15
‘‘(i) prepare for and adapt to changing
16
conditions; and
17
‘‘(ii) withstand and rapidly recover from
18
disruptions, including disruptions caused by ex-
19
treme weather conditions.’’.
20
SEC. 3. ELECTRIC GRID RESILIENCE EDUCATION PRO-
21
GRAM.
22
(a) IN GENERAL.—Not later than 1 year after the
23
date of enactment of this section, the Secretary of Energy
24
shall establish a program to provide information and rec-
25
VerDate Sep 11 2014
05:54 Jun 17, 2021
Jkt 019200
PO 00000
Frm 00002
Fmt 6652
Sfmt 6201
E:\BILLS\H2854.IH
H2854
pbinns on DSKJLVW7X2PROD with BILLS
3
•HR 2854 IH
ommendations to States and electric utilities on how to
1
improve the resilience of electric grids.
2
(b) ELECTRIC UTILITY DEFINED.—The term ‘‘elec-
3
tric utility’’ has the meaning given such term in section
4
3 of the Federal Power Act (16 U.S.C. 796).
5
SEC. 4. REPORT ON PLANNED ELECTRIC POWER OUTAGES
6
DUE TO EXTREME WEATHER CONDITIONS.
7
Not later than 1 year after the date of enactment
8
of this section, the Secretary of Energy shall submit to
9
Congress a report, and publish such report on the website
10
of the Department of Energy, that provides recommenda-
11
tions on how to minimize the need for, effects of, and du-
12
ration of planned electric power outages that are due to
13
extreme weather conditions, including such conditions
14
under which the National Weather Service issues a red
15
flag warning.
16
Æ
VerDate Sep 11 2014
05:54 Jun 17, 2021
Jkt 019200
PO 00000
Frm 00003
Fmt 6652
Sfmt 6301
E:\BILLS\H2854.IH
H2854
pbinns on DSKJLVW7X2PROD with BILLS