Plain English summary not yet available
The full original text is available below. Check back soon as we process this bill.
I
117TH CONGRESS
1ST SESSION H. R. 2822
To require the Secretary of Energy to carry out an energy storage research
program, loan program, and technical assistance and grant program,
and for other purposes.
IN THE HOUSE OF REPRESENTATIVES
APRIL 22, 2021
Mr. TAKANO introduced the following bill; which was referred to the Com-
mittee on Energy and Commerce, and in addition to the Committee on
Science, Space, and Technology, for a period to be subsequently deter-
mined by the Speaker, in each case for consideration of such provisions
as fall within the jurisdiction of the committee concerned
A BILL
To require the Secretary of Energy to carry out an energy
storage research program, loan program, and technical
assistance and grant program, and for other purposes.
Be it enacted by the Senate and House of Representa-
1
tives of the United States of America in Congress assembled,
2
SECTION 1. SHORT TITLE.
3
This Act may be cited as the ‘‘Advancing Grid Stor-
4
age Act of 2021’’.
5
SEC. 2. DEFINITIONS.
6
In this Act:
7
VerDate Sep 11 2014
22:34 Jun 07, 2021
Jkt 019200
PO 00000
Frm 00001
Fmt 6652
Sfmt 6201
E:\BILLS\H2822.IH
H2822
pamtmann on DSKBC07HB2PROD with BILLS
2
•HR 2822 IH
(1) ENERGY STORAGE SYSTEM.—The term ‘‘en-
1
ergy storage system’’ means a system or strategy
2
that improves the ability to shift the dispatch of en-
3
ergy in time, across multiple timescales.
4
(2) ISLANDING.—The term ‘‘islanding’’ means
5
a distributed generator or energy storage device con-
6
tinuing to power a location in the absence of electric
7
power from the primary source.
8
(3) LOAN.—The term ‘‘loan’’ has the meaning
9
given the term ‘‘direct loan’’ in section 502 of the
10
Federal Credit Reform Act of 1990 (2 U.S.C. 661a).
11
(4) MICROGRID.—The term ‘‘microgrid’’ means
12
an integrated energy system consisting of inter-
13
connected loads and distributed energy resources, in-
14
cluding generators and energy storage devices, with-
15
in clearly defined electrical boundaries that—
16
(A) acts as a single controllable entity with
17
respect to the grid; and
18
(B) can connect and disconnect from the
19
grid to operate in both grid-connected mode
20
and islanding mode.
21
(5) RENEWABLE ENERGY SOURCE.—The term
22
‘‘renewable energy source’’ includes—
23
(A) biomass;
24
(B) geothermal energy;
25
VerDate Sep 11 2014
22:34 Jun 07, 2021
Jkt 019200
PO 00000
Frm 00002
Fmt 6652
Sfmt 6201
E:\BILLS\H2822.IH
H2822
pamtmann on DSKBC07HB2PROD with BILLS
3
•HR 2822 IH
(C) hydropower;
1
(D) landfill gas;
2
(E) municipal solid waste;
3
(F) ocean (including tidal, wave, current,
4
and thermal) energy;
5
(G) organic waste;
6
(H) photosynthetic processes;
7
(I) photovoltaic energy;
8
(J) solar energy; and
9
(K) wind.
10
(6) SECRETARY.—The term ‘‘Secretary’’ means
11
the Secretary of Energy.
12
SEC. 3. ENERGY STORAGE RESEARCH PROGRAM.
13
(a) IN GENERAL.—The Secretary shall carry out,
14
within the Office of Electricity, a program for the research
15
of energy storage systems.
16
(b) AUTHORIZATION OF APPROPRIATIONS.—There is
17
authorized to be appropriated to carry out this section
18
$50,000,000.
19
SEC. 4. ENERGY STORAGE SYSTEM DEMONSTRATION AND
20
DEPLOYMENT LOAN PROGRAM.
21
(a) LOAN PROGRAM.—
22
(1) IN GENERAL.—Subject to the provisions of
23
this subsection and subsections (b) and (c), the Sec-
24
VerDate Sep 11 2014
22:34 Jun 07, 2021
Jkt 019200
PO 00000
Frm 00003
Fmt 6652
Sfmt 6201
E:\BILLS\H2822.IH
H2822
pamtmann on DSKBC07HB2PROD with BILLS
4
•HR 2822 IH
retary shall carry out a program to provide to eligi-
1
ble entities—
2
(A) loans for the demonstration and de-
3
ployment of energy storage systems in a specific
4
project; and
5
(B) loans to provide funding for programs
6
to finance the demonstration and deployment of
7
multiple energy storage systems through a re-
8
volving loan fund, credit enhancement program,
9
or other financial assistance program.
10
(2) ELIGIBILITY.—Entities eligible to receive a
11
loan under paragraph (1) include—
12
(A) a State, territory, or possession of the
13
United States;
14
(B) a State energy office;
15
(C) a tribal organization (as defined in sec-
16
tion 4 of the Indian Self-Determination and
17
Education Assistance Act (25 U.S.C. 5304));
18
(D) an institution of higher education (as
19
defined in section 101 of the Higher Education
20
Act of 1965 (20 U.S.C. 1001)); and
21
(E) an electric utility, including—
22
(i) a rural electric cooperative;
23
(ii) a municipally owned electric util-
24
ity; and
25
VerDate Sep 11 2014
22:34 Jun 07, 2021
Jkt 019200
PO 00000
Frm 00004
Fmt 6652
Sfmt 6201
E:\BILLS\H2822.IH
H2822
pamtmann on DSKBC07HB2PROD with BILLS
5
•HR 2822 IH
(iii) an investor-owned utility.
1
(3) SELECTION REQUIREMENTS.—In selecting
2
eligible entities to receive a loan under this section,
3
the Secretary shall, to the maximum extent prac-
4
ticable, ensure—
5
(A) regional diversity among eligible enti-
6
ties that receive the loans, including participa-
7
tion by rural States and small States; and
8
(B) that specific projects and programs se-
9
lected for loans—
10
(i) expand on the existing technology
11
demonstration and deployment programs
12
of the Department of Energy; and
13
(ii) are designed to achieve 1 or more
14
of the objectives described in paragraph
15
(4).
16
(4) OBJECTIVES.—Each demonstration and de-
17
ployment project, and each program, selected for a
18
loan under paragraph (1) shall include 1 or more of
19
the following objectives:
20
(A) With respect to energy storage sys-
21
tems, the improvement of—
22
(i) the feasibility of microgrids or
23
islanding; or
24
VerDate Sep 11 2014
22:34 Jun 07, 2021
Jkt 019200
PO 00000
Frm 00005
Fmt 6652
Sfmt 6201
E:\BILLS\H2822.IH
H2822
pamtmann on DSKBC07HB2PROD with BILLS
6
•HR 2822 IH
(ii) the transmission and distribution
1
capability to improve reliability in rural
2
areas, including high energy cost rural
3
areas.
4
(B) Use of energy storage systems to im-
5
prove the security of emergency response infra-
6
structure.
7
(C) Integration of energy storage systems
8
with a renewable energy source, at the source
9
or away from the source.
10
(D) Use of energy storage systems to pro-
11
vide ancillary services for grid management.
12
(E) Advancement of power conversion sys-
13
tems to make the systems smarter, more effi-
14
cient, able to communicate with other indenters,
15
and able to control voltage.
16
(F) Use of energy storage systems to opti-
17
mize transmission and distribution operation
18
and power quality to address overloaded lines
19
and maintenance of transformers and sub-
20
stations.
21
(G) Use of energy storage systems for
22
peak load management of homes, businesses,
23
and the grid, particularly to offset investments
24
in new grid capacity.
25
VerDate Sep 11 2014
22:34 Jun 07, 2021
Jkt 019200
PO 00000
Frm 00006
Fmt 6652
Sfmt 6201
E:\BILLS\H2822.IH
H2822
pamtmann on DSKBC07HB2PROD with BILLS
7
•HR 2822 IH
(H) Use of energy storage system devices
1
to meet electricity demand during nonpeak gen-
2
eration periods to make better use of existing
3
grid assets.
4
(5) RESTRICTION ON USE OF FUNDS.—Any eli-
5
gible entity that receives a loan under paragraph (1)
6
may only use the loan to fund projects for, and pro-
7
grams relating to, the demonstration and deploy-
8
ment of energy storage systems in households, busi-
9
nesses, and communities.
10
(b) LOAN TERMS AND CONDITIONS.—
11
(1) TERMS AND CONDITIONS.—Notwithstanding
12
any other provision of law, in providing a loan under
13
this section, the Secretary shall provide the loan on
14
such terms and conditions as the Secretary deter-
15
mines, after consultation with the Secretary of the
16
Treasury, in accordance with this section.
17
(2) SPECIFIC APPROPRIATION.—No loan shall
18
be made under this section unless an appropriation
19
for the full amount of the loan has been specifically
20
provided for that purpose.
21
(3) REPAYMENT.—No loan shall be made under
22
this section unless the Secretary determines that
23
there is reasonable prospect of repayment of the
24
principal and interest by the borrower of the loan.
25
VerDate Sep 11 2014
22:34 Jun 07, 2021
Jkt 019200
PO 00000
Frm 00007
Fmt 6652
Sfmt 6201
E:\BILLS\H2822.IH
H2822
pamtmann on DSKBC07HB2PROD with BILLS
8
•HR 2822 IH
(4) INTEREST RATE.—A loan provided under
1
this section shall bear interest at a fixed rate that
2
is equal or approximately equal, in the determination
3
of the Secretary, to the interest rate for Treasury
4
securities of comparable maturity.
5
(5) TERM.—The term of a loan provided under
6
this section shall require full repayment over a pe-
7
riod not to exceed the lesser of—
8
(A) 20 years; or
9
(B) 90 percent of the projected useful life
10
of the physical asset to be financed by the loan
11
(as determined by the Secretary).
12
(6) USE OF PAYMENTS.—Payments of principal
13
and interest on a loan provided under this section
14
shall—
15
(A) be retained by the Secretary to support
16
energy research and development activities; and
17
(B) remain available until expended, sub-
18
ject to such conditions as are contained in an-
19
nual appropriations Acts.
20
(7) NO PENALTY ON EARLY REPAYMENT.—The
21
Secretary may not assess any penalty for early re-
22
payment of a loan provided under this section.
23
(8) RETURN OF UNUSED PORTION.—In order to
24
receive a loan under this section, an eligible entity
25
VerDate Sep 11 2014
22:34 Jun 07, 2021
Jkt 019200
PO 00000
Frm 00008
Fmt 6652
Sfmt 6201
E:\BILLS\H2822.IH
H2822
pamtmann on DSKBC07HB2PROD with BILLS
9
•HR 2822 IH
shall agree to return to the general fund of the
1
Treasury any portion of the loan amount that is un-
2
used by the eligible entity within a reasonable period
3
of time after the date of the disbursement of the
4
loan, as determined by the Secretary.
5
(9) COMPARABLE WAGE RATES.—Each laborer
6
and mechanic employed by a contractor or subcon-
7
tractor in performance of construction work fi-
8
nanced, in whole or in part, by a loan provided
9
under this section shall be paid wages at rates not
10
less than the rates prevailing on similar construction
11
in the locality as determined by the Secretary of
12
Labor in accordance with subchapter IV of chapter
13
31 of title 40, United States Code.
14
(c) RULES AND PROCEDURES; DISBURSEMENT OF
15
LOANS.—
16
(1) RULES AND PROCEDURES.—Not later than
17
180 days after the date of enactment of this Act, the
18
Secretary shall adopt rules and procedures for car-
19
rying out the loan program under subsection (a).
20
(2) DISBURSEMENT OF LOANS.—Not later than
21
1 year after the date on which the rules and proce-
22
dures under paragraph (1) are adopted, the Sec-
23
retary shall disburse the initial loans provided under
24
this section.
25
VerDate Sep 11 2014
22:34 Jun 07, 2021
Jkt 019200
PO 00000
Frm 00009
Fmt 6652
Sfmt 6201
E:\BILLS\H2822.IH
H2822
pamtmann on DSKBC07HB2PROD with BILLS
10
•HR 2822 IH
(d) REPORTS.—Not later than 2 years after the date
1
of receipt of the loan and annually thereafter for the term
2
of the loan, an eligible entity that receives a loan under
3
this section shall submit to the Secretary a report describ-
4
ing the performance of each program and activity carried
5
out using the loan, including itemized loan performance
6
data.
7
(e) AUTHORIZATION
OF APPROPRIATIONS.—There
8
are authorized to be appropriated to carry out this section
9
such sums as are necessary.
10
SEC. 5. TECHNICAL ASSISTANCE AND GRANT PROGRAM.
11
(a) PROGRAM.—
12
(1) IN GENERAL.—The Secretary, in consulta-
13
tion with the Assistant Secretary, Office of Elec-
14
tricity, shall carry out a technical assistance and
15
grant program (referred to in this section as the
16
‘‘program’’)—
17
(A) to disseminate information and provide
18
technical assistance directly to eligible entities
19
so the eligible entities can identify, evaluate,
20
plan, and design energy storage systems; and
21
(B) to make grants to eligible entities so
22
that the eligible entities may contract to obtain
23
technical assistance to identify, evaluate, plan,
24
and design energy storage systems.
25
VerDate Sep 11 2014
22:34 Jun 07, 2021
Jkt 019200
PO 00000
Frm 00010
Fmt 6652
Sfmt 6201
E:\BILLS\H2822.IH
H2822
pamtmann on DSKBC07HB2PROD with BILLS
11
•HR 2822 IH
(2) TECHNICAL
ASSISTANCE.—The technical
1
assistance described in paragraph (1) shall include
2
assistance with 1 or more of the following activities
3
relating to energy storage systems:
4
(A) Identification of opportunities to use
5
energy storage systems.
6
(B) Assessment of technical and economic
7
characteristics.
8
(C) Utility interconnection.
9
(D) Permitting and siting issues.
10
(E) Business planning and financial anal-
11
ysis.
12
(F) Engineering design.
13
(3) INFORMATION DISSEMINATION.—The infor-
14
mation disseminated under paragraph (1)(A) shall
15
include—
16
(A) information relating to the topics de-
17
scribed in paragraph (2), including case studies
18
of successful examples;
19
(B) computer software for assessment, de-
20
sign, and operation and maintenance of energy
21
storage systems; and
22
(C) public databases that track the oper-
23
ation and deployment of existing and planned
24
energy storage systems.
25
VerDate Sep 11 2014
22:34 Jun 07, 2021
Jkt 019200
PO 00000
Frm 00011
Fmt 6652
Sfmt 6201
E:\BILLS\H2822.IH
H2822
pamtmann on DSKBC07HB2PROD with BILLS
12
•HR 2822 IH
(b) ELIGIBILITY.—Any nonprofit or for-profit entity
1
shall be eligible to receive technical assistance and grants
2
under the program.
3
(c) APPLICATIONS.—
4
(1) IN GENERAL.—An eligible entity desiring
5
technical assistance or grants under the program
6
shall submit to the Secretary an application at such
7
time, in such manner, and containing such informa-
8
tion as the Secretary may require.
9
(2) APPLICATION
PROCESS.—The Secretary
10
shall seek applications for technical assistance and
11
grants under the program—
12
(A) on a competitive basis; and
13
(B) on a periodic basis, but not less fre-
14
quently than once every 12 months.
15
(3) PRIORITIES.—In selecting eligible entities
16
for technical assistance and grants under the pro-
17
gram, the Secretary shall give priority to eligible en-
18
tities with projects that have the greatest potential
19
for—
20
(A) facilitating the use of renewable energy
21
sources;
22
(B) strengthening the reliability and resil-
23
iency of energy infrastructure to the impact of
24
VerDate Sep 11 2014
22:34 Jun 07, 2021
Jkt 019200
PO 00000
Frm 00012
Fmt 6652
Sfmt 6201
E:\BILLS\H2822.IH
H2822
pamtmann on DSKBC07HB2PROD with BILLS
13
•HR 2822 IH
extreme weather events, power grid failures,
1
and interruptions in supply of fossil fuels;
2
(C) improving the feasibility of microgrids
3
or islanding, particularly in
[Text truncated for display. Full text available on Congress.gov.]
Important: This plain English summary was generated by AI and is provided for informational purposes only.
It is not legal advice. Always consult the official bill text on Congress.gov
or a qualified attorney for legal matters.