Federal
Interregional Transmission Planning Improvement Act of 2021
Source: Congress.gov ·
661 words in original text
Plain English summary not yet available
The full original text is available below. Check back soon as we process this bill.
II
117TH CONGRESS
1ST SESSION
S. 1015
To require the Federal Energy Regulatory Commission to initiate a rule-
making to reform the interregional transmission planning process, and
for other purposes.
IN THE SENATE OF THE UNITED STATES
MARCH 25, 2021
Mr. HEINRICH introduced the following bill; which was read twice and referred
to the Committee on Energy and Natural Resources
A BILL
To require the Federal Energy Regulatory Commission to
initiate a rulemaking to reform the interregional trans-
mission planning process, and for other purposes.
Be it enacted by the Senate and House of Representa-
1
tives of the United States of America in Congress assembled,
2
SECTION 1. SHORT TITLE.
3
This Act may be cited as the ‘‘Interregional Trans-
4
mission Planning Improvement Act of 2021’’.
5
VerDate Sep 11 2014
23:58 Apr 18, 2021
Jkt 019200
PO 00000
Frm 00001
Fmt 6652
Sfmt 6201
E:\BILLS\S1015.IS
S1015
kjohnson on DSK79L0C42PROD with BILLS
2
•S 1015 IS
SEC. 2. RULEMAKING TO INCREASE THE EFFECTIVENESS
1
OF INTERREGIONAL TRANSMISSION PLAN-
2
NING.
3
(a) IN GENERAL.—Not later than 180 days after the
4
date of enactment of this Act, the Federal Energy Regu-
5
latory Commission shall initiate a rulemaking address-
6
ing—
7
(1) the effectiveness of existing planning proc-
8
esses for identifying interregional transmission
9
projects that provide economic, reliability, oper-
10
ational, public policy, and environmental benefits
11
(including reductions in carbon emissions), taking
12
into consideration the public interest, the integrity of
13
markets, and the protection of consumers;
14
(2) changes to the processes described in para-
15
graph (1) to ensure that efficient, cost-effective, and
16
broadly beneficial interregional transmission solu-
17
tions are selected for cost allocation, taking into con-
18
sideration—
19
(A) the public interest;
20
(B) the integrity of markets;
21
(C) the protection of consumers;
22
(D) the broad range of economic, reli-
23
ability, operational, public policy, and environ-
24
mental benefits that interregional transmission
25
VerDate Sep 11 2014
23:58 Apr 18, 2021
Jkt 019200
PO 00000
Frm 00002
Fmt 6652
Sfmt 6201
E:\BILLS\S1015.IS
S1015
kjohnson on DSK79L0C42PROD with BILLS
3
•S 1015 IS
provides, including reductions in carbon emis-
1
sions;
2
(E) the need for single projects to secure
3
approvals based on a comprehensive assessment
4
of the multiple benefits provided;
5
(F) that projects that meet interregional
6
benefit criteria should not be subject to subse-
7
quent reassessment by transmission planning
8
authorities;
9
(G) the importance of synchronization of
10
planning processes in neighboring regions, such
11
as using a joint model on a consistent timeline
12
with a single set of needs, input assumptions,
13
and benefit metrics;
14
(H) that evaluation of long-term scenarios
15
should align with the expected life of a trans-
16
mission asset;
17
(I) that transmission planning authorities
18
should allow for the identification and joint
19
evaluation of alternatives proposed by stake-
20
holders;
21
(J) that interregional planning should be
22
done regularly and not less frequently than
23
once every 3 years; and
24
VerDate Sep 11 2014
23:58 Apr 18, 2021
Jkt 019200
PO 00000
Frm 00003
Fmt 6652
Sfmt 6201
E:\BILLS\S1015.IS
S1015
kjohnson on DSK79L0C42PROD with BILLS
4
•S 1015 IS
(K) the elimination of arbitrary project
1
voltage, size, or cost requirements for inter-
2
regional solutions; and
3
(3) cost allocation methodologies that reflect
4
the multiple benefits provided by interregional trans-
5
mission solutions, including economic, reliability,
6
operational, public policy, and environmental bene-
7
fits (including reductions in carbon emissions).
8
(b) TIMING.—Not later than 18 months after the
9
date of enactment of this Act, the Federal Energy Regu-
10
latory Commission shall promulgate a final rule to com-
11
plete the rulemaking initiated under subsection (a).
12
Æ
VerDate Sep 11 2014
23:58 Apr 18, 2021
Jkt 019200
PO 00000
Frm 00004
Fmt 6652
Sfmt 6301
E:\BILLS\S1015.IS
S1015
kjohnson on DSK79L0C42PROD with BILLS
Important: This plain English summary was generated by AI and is provided for informational purposes only.
It is not legal advice. Always consult the official bill text on Congress.gov
or a qualified attorney for legal matters.