117TH CONGRESS
1ST SESSION H. R. 1855
To promote new manufacturing in the United States by providing for greater
transparency and timeliness in obtaining necessary permits, and for other
purposes.
IN THE HOUSE OF REPRESENTATIVES
MARCH 11, 2021
Mr. SCALISE introduced the following bill; which was referred to the
Committee on Energy and Commerce
A BILL
To promote new manufacturing in the United States by
providing for greater transparency and timeliness in ob-
taining necessary permits, and for other purposes.
Be it enacted by the Senate and House of Representa-
1
tives of the United States of America in Congress assembled,
2
SECTION 1. SHORT TITLE.
3
This Act may be cited as the ‘‘Promoting New Manu-
4
facturing Act’’.
5
SEC. 2. BUILDING AND MANUFACTURING PROJECTS DASH-
6
BOARD.
7
(a) IN GENERAL.—The Administrator shall, with re-
8
spect to fiscal year 2016 and each subsequent fiscal year,
9
VerDate Sep 11 2014
20:58 May 03, 2021
Jkt 019200
PO 00000
Frm 00001
Fmt 6652
Sfmt 6201
E:\BILLS\H1855.IH
H1855
pamtmann on DSKBC07HB2PROD with BILLS
2
•HR 1855 IH
publish in a readily accessible location on the Environ-
1
mental Protection Agency’s public website the Agency’s
2
estimate of the following:
3
(1) The total number of preconstruction per-
4
mits issued during the fiscal year.
5
(2) The percentage of such preconstruction per-
6
mits issued within one year after the date of filing
7
of a completed application.
8
(3) The average length of time for the Agency’s
9
Environmental Appeals Board to issue a final deci-
10
sion on petitions appealing decisions to grant or
11
deny a preconstruction permit application.
12
(b) INITIAL PUBLICATION; UPDATES.—The Adminis-
13
trator shall—
14
(1) make the publication required by subsection
15
(a) for fiscal years 2016 through 2020 not later
16
than 60 days after the date of enactment of this
17
Act; and
18
(2) update such publication not less than annu-
19
ally.
20
(c) SOURCES OF INFORMATION.—In carrying out this
21
section:
22
(1) With respect to information to be published
23
for fiscal years 2016 through 2020, the Environ-
24
mental Protection Agency’s estimates shall be based
25
VerDate Sep 11 2014
20:58 May 03, 2021
Jkt 019200
PO 00000
Frm 00002
Fmt 6652
Sfmt 6201
E:\BILLS\H1855.IH
H1855
pamtmann on DSKBC07HB2PROD with BILLS
3
•HR 1855 IH
on information that is in the Agency’s possession as
1
of the date of enactment of this Act, including infor-
2
mation in the RACT/BACT/LAER Clearinghouse
3
database.
4
(2) With respect to information to be published
5
for any fiscal year, nothing in this section compels
6
the Environmental Protection Agency to seek or col-
7
lect any information in addition to the information
8
that is voluntarily provided by States and local air
9
agencies for the RACT/BACT/LAER Clearinghouse
10
database.
11
SEC. 3. TIMELY ISSUANCE OF REGULATIONS AND GUID-
12
ANCE TO ADDRESS NEW OR REVISED NA-
13
TIONAL AMBIENT AIR QUALITY STANDARDS
14
IN PRECONSTRUCTION PERMITTING.
15
(a) IN GENERAL.—In publishing any final rule estab-
16
lishing or revising a national ambient air quality standard,
17
the Administrator shall, as the Administrator determines
18
necessary and appropriate to assist States, permitting au-
19
thorities, and permit applicants, concurrently publish reg-
20
ulations and guidance for implementing the standard, in-
21
cluding information relating to submission and consider-
22
ation of a preconstruction permit application under the
23
new or revised standard.
24
VerDate Sep 11 2014
20:58 May 03, 2021
Jkt 019200
PO 00000
Frm 00003
Fmt 6652
Sfmt 6201
E:\BILLS\H1855.IH
H1855
pamtmann on DSKBC07HB2PROD with BILLS
4
•HR 1855 IH
(b)
APPLICABILITY
OF
STANDARD
TO
1
PRECONSTRUCTION PERMITTING.—If the Administrator
2
fails to publish final regulations and guidance that include
3
information relating to submission and consideration of a
4
preconstruction permit application under a new or revised
5
national ambient air quality standard concurrently with
6
such standard, then such standard shall not apply to the
7
review and disposition of a preconstruction permit applica-
8
tion until the Agency has published such final regulations
9
and guidance.
10
(c) RULES OF CONSTRUCTION.—
11
(1) After publishing regulations and guidance
12
for implementing national ambient air quality stand-
13
ards under subsection (a), nothing in this section
14
shall preclude the Environmental Protection Agency
15
from issuing subsequent regulations or guidance to
16
assist States and facilities in implementing such
17
standards.
18
(2) Nothing in this section shall be construed to
19
eliminate the obligation of a preconstruction permit
20
applicant to install best available control technology
21
and lowest achievable emission rate technology, as
22
applicable.
23
(3) Nothing in this section shall be construed to
24
limit the authority of a State, local, or Tribal per-
25
VerDate Sep 11 2014
20:58 May 03, 2021
Jkt 019200
PO 00000
Frm 00004
Fmt 6652
Sfmt 6201
E:\BILLS\H1855.IH
H1855
pamtmann on DSKBC07HB2PROD with BILLS
5
•HR 1855 IH
mitting authority to impose more stringent emissions
1
requirements pursuant to State, local, or Tribal law
2
than Federal national ambient air quality standards
3
established by the Environmental Protection Agency.
4
SEC. 4. REPORT TO CONGRESS ON ACTIONS TO EXPEDITE
5
REVIEW OF PRECONSTRUCTION PERMITS.
6
(a) IN GENERAL.—Not later than 180 days after the
7
date of enactment of this Act, and annually thereafter,
8
the Administrator shall submit to Congress a report—
9
(1) identifying the activities being undertaken
10
by the Environmental Protection Agency to increase
11
the efficiency of the preconstruction permitting proc-
12
ess;
13
(2) identifying the specific reasons for delays in
14
issuing—
15
(A) preconstruction permits required under
16
part C of the Clean Air Act (42 U.S.C. 7470
17
et seq.) beyond the one-year statutory deadline
18
mandated by section 165(c) of the Clean Air
19
Act (42 U.S.C. 7475(c)); or
20
(B) preconstruction permits required under
21
part D of the Clean Air Act (42 U.S.C. 7501
22
et seq.) beyond the one-year period beginning
23
on the date on which the permit application is
24
determined to be complete;
25
VerDate Sep 11 2014
20:58 May 03, 2021
Jkt 019200
PO 00000
Frm 00005
Fmt 6652
Sfmt 6201
E:\BILLS\H1855.IH
H1855
pamtmann on DSKBC07HB2PROD with BILLS
6
•HR 1855 IH
(3) describing how the Agency is resolving
1
delays in making completeness determinations for
2
preconstruction permit applications;
3
(4) describing how the Agency is resolving proc-
4
essing delays for preconstruction permits, including
5
any increases in communication with State and local
6
permitting authorities; and
7
(5) summarizing and responding to public com-
8
ments concerning the report received under sub-
9
section (b).
10
(b) PUBLIC COMMENT.—Before submitting each re-
11
port required by subsection (a), the Administrator shall
12
publish a draft report on the website of the Environmental
13
Protection Agency and provide the public with a period
14
of at least 30 days to submit comments on the draft re-
15
port.
16
(c) SOURCES OF INFORMATION.—Nothing in this sec-
17
tion compels the Environmental Protection Agency to seek
18
or collect any information in addition to the information
19
that is voluntarily provided by States and local air agen-
20
cies for the RACT/BACT/LAER Clearinghouse database.
21
SEC. 5. DEFINITIONS.
22
In this Act:
23
VerDate Sep 11 2014
20:58 May 03, 2021
Jkt 019200
PO 00000
Frm 00006
Fmt 6652
Sfmt 6201
E:\BILLS\H1855.IH
H1855
pamtmann on DSKBC07HB2PROD with BILLS
7
•HR 1855 IH
(1) ADMINISTRATOR.—The term ‘‘Adminis-
1
trator’’ means the Administrator of the Environ-
2
mental Protection Agency.
3
(2)
BEST
AVAILABLE
CONTROL
TECH-
4
NOLOGY.—The term ‘‘best available control tech-
5
nology’’ has the meaning given to that term in sec-
6
tion 169(3) of the Clean Air Act (42 U.S.C.
7
7479(3)).
8
(3) LOWEST
ACHIEVABLE
EMISSION
RATE.—
9
The term ‘‘lowest achievable emission rate’’ has the
10
meaning given to that term in section 171(3) of the
11
Clean Air Act (42 U.S.C. 7501(3)).
12
(4) MAJOR
EMITTING
FACILITY; MAJOR
STA-
13
TIONARY SOURCE.—The terms ‘‘major emitting fa-
14
cility’’ and ‘‘major stationary source’’ have the
15
meanings given to those terms in section 302(j) of
16
the Clean Air Act (42 U.S.C. 7602(j)).
17
(5) NATIONAL AMBIENT AIR QUALITY STAND-
18
ARD.—The term ‘‘national ambient air quality
19
standard’’ means a national ambient air quality
20
standard for an air pollutant under section 109 of
21
the Clean Air Act (42 U.S.C. 7409) that is finalized
22
on or after the date of enactment of this Act.
23
(6) PRECONSTRUCTION
PERMIT.—The term
24
‘‘preconstruction permit’’—
25
VerDate Sep 11 2014
20:58 May 03, 2021
Jkt 019200
PO 00000
Frm 00007
Fmt 6652
Sfmt 6201
E:\BILLS\H1855.IH
H1855
pamtmann on DSKBC07HB2PROD with BILLS
8
•HR 1855 IH
(A) means a permit that is required under
1
part C or D of title I of the Clean Air Act (42
2
U.S.C. 7470 et seq.) for the construction or
3
modification of a major emitting facility or
4
major stationary source; and
5
(B) includes any such permit issued by the
6
Environmental Protection Agency or a State,
7
local, or Tribal permitting authority.
8
(7)
RACT/BACT/LAER
CLEARINGHOUSE
9
DATABASE.—The term ‘‘RACT/BACT/LAER Clear-
10
inghouse database’’ means the central database of
11
air pollution technology information that is posted
12
on the Environmental Protection Agency’s website.
13
Æ
VerDate Sep 11 2014
20:58 May 03, 2021
Jkt 019200
PO 00000
Frm 00008
Fmt 6652
Sfmt 6301
E:\BILLS\H1855.IH
H1855
pamtmann on DSKBC07HB2PROD with BILLS
Important: This plain English summary was generated by AI and is provided for informational purposes only.
It is not legal advice. Always consult the official bill text on Congress.gov
or a qualified attorney for legal matters.