California
SB1283
SB1283 - Electric vehicle charging stations: installation: permits.
Source: Congress.gov ·
5,746 words in original text
Plain English summary not yet available
The full original text is available below. Check back soon as we process this bill.
Enrolled August 27, 2026 Passed IN Senate August 25, 2026 Passed IN Assembly August 24, 2026 Amended IN Assembly August 19, 2026 Amended IN Senate May 14, 2026 Amended IN Senate April 23, 2026 Amended IN Senate April 08, 2026 Amended IN Senate March 23, 2026 CALIFORNIA LEGISLATURE— 2025–2026 REGULAR SESSION Senate Bill No. 1283 Introduced by Senator Ashby February 20, 2026 An act to amend Sections 65850.7 and 65850.71 of the Government Code, relating to electric vehicle charging stations. LEGISLATIVE COUNSEL'S DIGEST SB 1283, Ashby. Electric vehicle charging stations: installation: permits. Existing law requires a city, county, or city and county (local government) to administratively approve an application to install an electric vehicle charging station (EV station) through the issuance of a building permit or similar nondiscretionary permit. Existing law requires those EV stations to meet all applicable safety and performance standards established by specified entities. This bill would require this administrative approval to extend to EV stations with a canopy, as defined, or onsite energy storage systems sized to support charging. This bill would also require any electric vehicle supply equipment installed at the EV station to meet all applicable safety and performance standards. Existing law requires every local government to adopt, pursuant to specified deadlines, an ordinance that creates an expedited, streamlined permitting process for EV stations. Existing law requires the local government to adopt a checklist of all requirements with which the EV stations must comply with for expedited review. This bill would require the ordinance to also address expedited streamlining for any supporting infrastructure necessary for or accessory to the operation of EV stations, as described, and would clarify that the checklist may be amended. The bill would require the ordinance and checklist to be amended to implement the bill’s provisions no later than December 31, 2027. This bill would further provide that if the local government has not adopted or amended such a checklist, an application to install an EV station must contain specified information about the proposed project to the building official of the local government, including, but not limited to, the specific location of the EV station. The bill would require the Governor’s Office of Business and Economic Development (GO-Biz) to develop and publicly post a standardized form that applicants may use and submit to the local government for purposes of satisfying this requirement. The bill would also require GO-Biz to develop and publicly post an optional template that applicants may use to document their application’s compliance with specified provisions relating to the submittal of their EV station application. This bill would require a local government to provide, no later than 30 days after an application has been deemed approved, a written notice to the applicant of the date the application was deemed approved and identify all permits and authorizations that have been granted. The bill would authorize an applicant to proceed with project construction following that notice, as described. This bill would prohibit its provisions from being construed to limit a local agency’s ability to, among other things, require plans or supporting documentation that are necessary to verify an electric vehicle charging station, including supporting infrastructure, meets all health and safety requirements of local, state, and federal law, as provided. This bill would make conforming changes and revise various definitions in these provisions, including by redefining an EV station for purposes of these provisions to mean a physical site where one or more devices with one or more charging ports and connectors for charging electric vehicles are available for use. By imposing additional duties on local agencies, the bill would impose a state-mandated local program. The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement. This bill would provide that no reimbursement is required by this act for a specified reason. Digest Key Vote: MAJORITY Appropriation: NO Fiscal Committee: YES Local Program: YES Bill Text The people of the State of California do enact as follows: SECTION 1. Section 65850.7 of the Government Code, as amended by Section 1 of Chapter 607 of the Statutes of 2024, is amended to read: 65850.7. (a) The Legislature finds and declares all of the following: (1) The implementation of consistent statewide standards to achieve the timely and cost-effective installation of electric vehicle charging stations and hydrogen-fueling stations is not a municipal affair, as that term is used in Section 5 of Article XI of the California Constitution, but is instead a matter of statewide concern. Therefore, this section applies to all cities, including charter cities. (2) It is the intent of the Legislature that local agencies not adopt ordinances that create unreasonable barriers to the installation of zero-emission vehicle infrastructure and not unreasonably restrict the ability of homeowners and agricultural and business concerns to install electric vehicle charging and hydrogen-fueling stations. (3) It is the policy of the state to promote and encourage the use of electric vehicle charging stations and hydrogen-fueling stations and to limit obstacles to their use. (4) It is the intent of the Legislature that local agencies comply not only with the language of this section, but also the legislative intent to encourage the installation of electric vehicle charging stations and hydrogen-fueling stations by removing obstacles to, and minimizing costs of, permitting for charging and hydrogen-fueling stations so long as the action does not supersede the building official’s authority to identify and address higher priority life-safety situations. (b) (1) A city, county, or city and county shall administratively approve an application to install electric vehicle charging stations through the issuance of a building permit or similar nondiscretionary permit, including, but not limited to, an electric vehicle charging station with a canopy or onsite energy storage systems sized to support charging. (2) A city, county, or city and county shall administratively approve an application to install hydrogen-fueling stations through the issuance of a building permit or similar nondiscretionary permit. This paragraph shall only apply to an application to install hydrogen-fueling stations on a parcel that satisfies either of the following: (A) It is zoned for industrial or commercial development and does not contain any residential units. (B) It was previously developed with a service station. For purposes of this subparagraph, “service station” means any establishment which offers for sale or sells gasoline or other motor vehicle fuel to the public. (3) Review of an application to install an electric vehicle charging station or hydrogen-fueling station shall be limited to the building official’s review of whether it meets all health and safety requirements of local, state, and federal law. The requirements of local law shall be limited to those standards and regulations necessary to ensure that the electric vehicle charging station or hydrogen-fueling station will not have a specific, adverse impact upon the public health or safety. However, if the building official of the city, county, or city and county makes a finding, based on substantial evidence, that the electric vehicle charging station or hydrogen-fueling station could have a specific, adverse impact upon the public health or safety, the city, county, or city and county may require the applicant to apply for a use permit. (c) A city, county, or city and county may not deny an application for a use permit to install an electric vehicle charging station or hydrogen-fueling station unless it makes written findings based upon substantial evidence in the record that the proposed installation would have a specific, adverse impact upon the public health or safety, and there is no feasible method to satisfactorily mitigate or avoid the specific, adverse impact. The findings shall include the basis for the rejection of potential feasible alternatives of preventing the adverse impact. (d) The decision of the building official pursuant to subdivisions (b) and (c) may be appealed to the planning commission of the city, county, or city and county. (e) Any conditions imposed on an application to install an electric vehicle charging station or hydrogen-fueling station shall be designed to mitigate the specific, adverse impact upon the public health or safety at the lowest cost possible. (f) (1) An electric vehicle charging station or hydrogen-fueling station shall meet applicable health and safety standards and requirements imposed by state and local permitting authorities. (2) Any electric vehicle supply equipment installed at an electric vehicle charging station shall meet all applicable safety and performance standards established by the California Electrical Code, the Society of Automotive Engineers, the National Electrical Manufacturers Association, and accredited testing laboratories such as Underwriters Laboratories and, where applicable, rules of the Public Utilities Commission regarding safety and reliability, or rules of the Department of Food and Agriculture regarding safety, reliability, weights, and measures. (3) A hydrogen-fueling station shall meet all of the following, as applicable: (A) Safety and performance standards established by the Society of Automotive Engineers and accredited nationally recognized testing laboratories. (B) All applicable state laws and regulations pertaining to hydrogen fueling, including any rules established by the State Air Resources Board, Energy Commission, or Department of Food and Agriculture regarding safety, reliability, weights, and measures. (C) Guidance established by the Governor’s Office of Business and Economic Development, as outlined in the Hydrogen Station Permitting Guidebook. (g) (1) (A) On or before September 30, 2016, every city, county, or city and county with a population of 200,000 or more residents, and, on or before September 30, 2017, every city, county, or city and county with a population of less than 200,000 residents, shall, in consultation with the local fire department or district and the utility director, if the city, county, or city and county operates a utility, adopt an ordinance, consistent with the goals and intent of this section, that creates an expedited, streamlined permitting process for electric vehicle charging stations, including any supporting infrastructure necessary for or accessory to the operation of the station. That supporting infrastructure includes, but is not limited to, any paving, concrete pad, utility trench, canopy, or onsite energy storage system sized to support electric vehicle charging. In developing an expedited permitting process, the city, county, or city and county shall adopt or amend a checklist of all requirements with which electric vehicle charging stations shall comply to be eligible for expedited review. (B) On or before September 30, 2025, every city, county, or city and county with a population of 250,000 or more residents, and, on or before September 30, 2028, every city, county, or city and county with a population of fewer than 250,000 residents, shall, in consultation with the local fire department or district and the utility director, if the city, county, or city and county operates a utility, adopt an ordinance, consistent with the goals and intent of this section, that creates an expedited, streamlined permitting process for hydrogen-fueling stations that meet the requirements of paragraph (2) of subdivision (b). In developing an expedited permitting process, the city, county, or city and county shall adopt a checklist of all requirements with which hydrogen-fueling stations shall comply to be eligible for expedited review. (C) Amendments to ordinances and checklists to implement the amendments to this section made by the act that added this subparagraph shall be completed no later than December 31, 2027. (2) An application that satisfies the information requirements in either checklist adopted pursuant to paragraph (1), as determined by the city, county, or city and county, shall be deemed complete. Upon confirmation by the city, county, or city and county of the application and supporting documents being complete and meeting the requirements of the checklist, and consistent with the ordinance, a city, county, or city and county shall, consistent with subdivision (b), approve the application and issue all required permits or authorizations. However, the city, county, or city and county may establish a process to prioritize competing applications for expedited permits. Upon receipt of an incomplete application, a city, county, or city and county shall issue a written correction notice detailing all deficiencies in the application and any additional information required to be eligible for expedited permit issuance. An application submitted to a city, county, or city and county that owns and operates an electric utility shall demonstrate compliance with the utility’s interconnection policies prior to approval. (3) Each checklist and required permitting documentation shall be published on a publicly accessible internet website, if the city, county, or city and county has an internet website, and the city, county, or city and county shall allow for electronic submittal of a permit application and associated documentation, and shall authorize the electronic signature on all forms, applications, and other documentation in lieu of a wet signature by an applicant. In developing the ordinance, the city, county, or city and county may refer to the recommendations contained in the most current version of the “Electric Vehicle Charging Station Permitting Guidebook” or the “Hydrogen Station Permitting Guidebook” published by the Governor’s Office of Business and Economic Development. A city, county, or city and county may adopt an ordinance that modifies the checklists and standards found in the guidebooks due to unique climactic, geological, seismological, or topographical conditions. If a city, county, or city and county determines that it is unable to authorize the acceptance of an electronic signature on all forms, applications, and other documents in lieu of a wet signature by an applicant, the city, county, or city and county shall state, in the ordinance required under this subdivision, the reasons for its inability to accept electronic signatures and acceptance of an electronic signature shall not be required. (h) A city, county, or city and county shall not condition approval for any el
[Text truncated for display. Full text available on Congress.gov.]
Important: This plain English summary was generated by AI and is provided for informational purposes only.
It is not legal advice. Always consult the official bill text on Congress.gov
or a qualified attorney for legal matters.