Federal
Missouri River Basin Drought and Snowpack Monitoring Act
Source: Congress.gov ·
1,874 words in original text
Plain English summary not yet available
The full original text is available below. Check back soon as we process this bill.
II
116TH CONGRESS
2D SESSION
S. 4444
To require installation of a network of soil moisture and snowpack monitoring
in the Upper Missouri River Basin and to establish a pilot program
for the acquisition and use of data generated by that network, and
for other purposes.
IN THE SENATE OF THE UNITED STATES
AUGUST 5, 2020
Mr. THUNE (for himself and Mr. ROUNDS) introduced the following bill; which
was read twice and referred to the Committee on Environment and Public
Works
A BILL
To require installation of a network of soil moisture and
snowpack monitoring in the Upper Missouri River Basin
and to establish a pilot program for the acquisition and
use of data generated by that network, and for other
purposes.
Be it enacted by the Senate and House of Representa-
1
tives of the United States of America in Congress assembled,
2
SECTION 1. SHORT TITLE.
3
This Act may be cited as the ‘‘Missouri River Basin
4
Drought and Snowpack Monitoring Act’’.
5
SEC. 2. SOIL MOISTURE AND SNOWPACK MONITORING.
6
(a) INSTALLATION OF NETWORK.—
7
VerDate Sep 11 2014
04:24 Aug 22, 2020
Jkt 099200
PO 00000
Frm 00001
Fmt 6652
Sfmt 6201
E:\BILLS\S4444.IS
S4444
kjohnson on DSK79L0C42PROD with BILLS
2
•S 4444 IS
(1) IN GENERAL.—In accordance with the ac-
1
tivities required under section 4003(a) of the Water
2
Resources Reform and Development Act of 2014
3
(128 Stat. 1311; 130 Stat. 1677), and to support
4
the goals of the Weather Research and Forecasting
5
Innovation Act of 2017 (Public Law 115–25; 131
6
Stat. 91) and the National Integrated Drought In-
7
formation System Reauthorization Act of 2018
8
(Public Law 115–423; 132 Stat. 5454), the Sec-
9
retary of the Army (referred to in this section as the
10
‘‘Secretary’’), in coordination with the Administrator
11
of the National Oceanic and Atmospheric Adminis-
12
tration (referred to in this section as the ‘‘Adminis-
13
trator’’), the Chief of the Natural Resources Con-
14
servation Service, the Director of the United States
15
Geological Survey, and the Commissioner of Rec-
16
lamation, shall continue installation of a network of
17
soil moisture and plains snowpack monitoring sta-
18
tions and modification of existing stations in the
19
Upper Missouri River Basin.
20
(2) REQUIREMENTS.—In carrying out installa-
21
tion and modification activities under paragraph (1),
22
the Secretary—
23
(A) may continue to enter into agreements,
24
including cooperative agreements, with State
25
VerDate Sep 11 2014
04:24 Aug 22, 2020
Jkt 099200
PO 00000
Frm 00002
Fmt 6652
Sfmt 6201
E:\BILLS\S4444.IS
S4444
kjohnson on DSK79L0C42PROD with BILLS
3
•S 4444 IS
mesonet programs for purposes of installing
1
new stations or modifying existing stations;
2
(B) shall transfer ownership and all re-
3
sponsibilities for operation and maintenance of
4
new stations to the respective State mesonet
5
program for the State in which the monitoring
6
station is located on completion of installation
7
of the station; and
8
(C) shall establish, in consultation with the
9
Administrator, requirements and standards for
10
the installation of new stations and modification
11
of existing stations to ensure seamless data in-
12
tegration into—
13
(i) the National Mesonet Program;
14
(ii) the National Coordinated Soil
15
Moisture Network; and
16
(iii) other relevant networks.
17
(b) SOIL MOISTURE AND SNOWPACK MONITORING
18
PILOT PROGRAM.—
19
(1) IN
GENERAL.—Not later than 180 days
20
after the date of the enactment of this Act, the Ad-
21
ministrator shall establish a pilot program for the
22
acquisition and use of data generated by the network
23
described in subsection (a).
24
VerDate Sep 11 2014
04:24 Aug 22, 2020
Jkt 099200
PO 00000
Frm 00003
Fmt 6652
Sfmt 6201
E:\BILLS\S4444.IS
S4444
kjohnson on DSK79L0C42PROD with BILLS
4
•S 4444 IS
(2) REQUIREMENTS.—In establishing the pilot
1
program under paragraph (1), the Administrator
2
shall—
3
(A) enter into agreements with State
4
mesonet programs in the Upper Missouri River
5
Basin to acquire data generated by the network
6
described in subsection (a) that—
7
(i) are similar to the agreements in ef-
8
fect as of the date of the enactment of this
9
Act with States under the National Meso-
10
net Program; and
11
(ii) allow for sharing of data with
12
other Federal agencies and with institu-
13
tions engaged in federally supported re-
14
search,
including
the
United
States
15
Drought Monitor, as appropriate and fea-
16
sible;
17
(B) in coordination with the Secretary, the
18
Chief of the Natural Resources Conservation
19
Service, the Director of the United States Geo-
20
logical Survey, and the Commissioner of Rec-
21
lamation, gather data from the operation of the
22
network to inform ongoing efforts of the Na-
23
tional Oceanic and Atmospheric Administration
24
in support of—
25
VerDate Sep 11 2014
04:24 Aug 22, 2020
Jkt 099200
PO 00000
Frm 00004
Fmt 6652
Sfmt 6201
E:\BILLS\S4444.IS
S4444
kjohnson on DSK79L0C42PROD with BILLS
5
•S 4444 IS
(i) the National Integrated Drought
1
Information System, including the Na-
2
tional Coordinated Soil Moisture Moni-
3
toring Network;
4
(ii) the United States Drought Mon-
5
itor;
6
(iii) the National Water Model and
7
other relevant national modeling efforts;
8
(iv) validation, verification, and cali-
9
bration of satellite-based, in situ, and other
10
remote sensing activities and output prod-
11
ucts;
12
(v) flood risk and water resources
13
monitoring initiatives by the Secretary and
14
the Commissioner; and
15
(vi) any other programs or initiatives
16
the Administrator considers appropriate;
17
and
18
(C) at the request of State mesonet pro-
19
grams, or as the Administrator considers appro-
20
priate, provide technical assistance to such pro-
21
grams under the pilot program under para-
22
graph (1) to ensure proper data requirements;
23
and
24
VerDate Sep 11 2014
04:24 Aug 22, 2020
Jkt 099200
PO 00000
Frm 00005
Fmt 6652
Sfmt 6201
E:\BILLS\S4444.IS
S4444
kjohnson on DSK79L0C42PROD with BILLS
6
•S 4444 IS
(D) ensure an appropriate mechanism for
1
quality control and quality assurance is em-
2
ployed for the data acquired under the pilot
3
program, such as the Meteorological Assimila-
4
tion Data Ingest System.
5
(3) STUDY REQUIRED.—
6
(A) IN GENERAL.—Not later than 1 year
7
after the date of the enactment of this Act, the
8
Administrator shall initiate a study of the pilot
9
program required by paragraph (1) to evaluate
10
the data generated by the network described in
11
subsection (a) and the applications of that data
12
to programs and initiatives described in para-
13
graph (2)(B).
14
(B) ELEMENTS.—The study required by
15
subparagraph (A) shall include an assessment
16
of—
17
(i) the contribution of the soil mois-
18
ture, snowpack, and other relevant data
19
generated by the network described in sub-
20
section (a) to weather, subseasonal and
21
seasonal, and climate forecasting products
22
on the local, regional, and national levels;
23
(ii) the enhancements made to the
24
National Integrated Drought Information
25
VerDate Sep 11 2014
04:24 Aug 22, 2020
Jkt 099200
PO 00000
Frm 00006
Fmt 6652
Sfmt 6201
E:\BILLS\S4444.IS
S4444
kjohnson on DSK79L0C42PROD with BILLS
7
•S 4444 IS
System, the National Water Model, and
1
the United States Drought Monitor, and
2
other relevant national modeling efforts,
3
using data and derived data products gen-
4
erated by the network;
5
(iii) the contribution of data gen-
6
erated by the network to remote sensing
7
products and approaches;
8
(iv) the viability of the ownership and
9
operational structure of the network; and
10
(v) any other matters the Adminis-
11
trator considers appropriate, in coordina-
12
tion with the Secretary, the Chief of the
13
Natural Resources Conservation Service,
14
the Director of the United States Geologi-
15
cal Survey, and the Commissioner of Rec-
16
lamation.
17
(4) REPORT
REQUIRED.—Not later than 4
18
years after the date of the enactment of this Act, the
19
Administrator shall submit to Congress a report—
20
(A) setting forth the findings of the study
21
required by paragraph (3); and
22
(B) making recommendations based on
23
those findings to improve weather, subseasonal,
24
seasonal, and climate monitoring nationally.
25
VerDate Sep 11 2014
04:24 Aug 22, 2020
Jkt 099200
PO 00000
Frm 00007
Fmt 6652
Sfmt 6201
E:\BILLS\S4444.IS
S4444
kjohnson on DSK79L0C42PROD with BILLS
8
•S 4444 IS
(5) GOVERNMENT
ACCOUNTABILITY
OFFICE
1
AUDIT.—
2
(A) IN GENERAL.—Not later than 60 days
3
after the report required by paragraph (4) is
4
submitted, the Comptroller General of the
5
United States shall conduct an audit to evalu-
6
ate that report and determine whether—
7
(i) the Administrator, in conducting
8
the pilot program under paragraph (1),
9
has utilized the relevant data generated by
10
the network described in subsection (a) in
11
the manner most beneficial to the pro-
12
grams and initiatives described in para-
13
graph (2)(B);
14
(ii) the acquisition agreements entered
15
into under paragraph (2)(A) with State
16
mesonet programs fully comply with the
17
requirements of that paragraph; and
18
(iii) the heads of other agencies, in-
19
cluding the Secretary, the Chief of the
20
Natural Resources Conservation Service,
21
the Director of the United States Geologi-
22
cal Survey, and the Commissioner of Rec-
23
lamation, are utilizing the data generated
24
VerDate Sep 11 2014
04:24 Aug 22, 2020
Jkt 099200
PO 00000
Frm 00008
Fmt 6652
Sfmt 6201
E:\BILLS\S4444.IS
S4444
kjohnson on DSK79L0C42PROD with BILLS
9
•S 4444 IS
by the network to better inform and im-
1
prove the missions of those agencies.
2
(B) REPORT REQUIRED.—Not later than
3
270 days after initiating the audit required by
4
subparagraph (A), the Comptroller General
5
shall submit to Congress a report setting forth
6
the findings of the audit.
7
(c) AUTHORIZATION OF APPROPRIATIONS.—
8
(1) IN GENERAL.—There are authorized to be
9
appropriated—
10
(A) to supplement funds already author-
11
ized for installation of a network of new moni-
12
toring stations and modification of existing
13
monitoring stations in the Upper Missouri
14
River Basin under subsection (a), $7,000,000
15
for each of fiscal years 2021 through 2025; and
16
(B) to the Administrator to acquire under
17
subsection (b) data collected by the network de-
18
scribed in subsection (a)—
19
(i) $500,000 for fiscal year 2021;
20
(ii) $2,300,000 for fiscal year 2022;
21
(iii) $4,100,000 for fiscal year 2023;
22
(iv) $5,900,000 for fiscal year 2024;
23
and
24
(v) $7,900,000 for fiscal year 2025.
25
VerDate Sep 11 2014
04:24 Aug 22, 2020
Jkt 099200
PO 00000
Frm 00009
Fmt 6652
Sfmt 6201
E:\BILLS\S4444.IS
S4444
kjohnson on DSK79L0C42PROD with BILLS
10
•S 4444 IS
(2) LIMITATION
ON
ADMINISTRATIVE
EX-
1
PENSES.—Not more than 2 percent of the amounts
2
authorized to be appropriated under paragraph
3
(1)(B) may be used by the Administrator for admin-
4
istrative expenses.
5
Æ
VerDate Sep 11 2014
04:24 Aug 22, 2020
Jkt 099200
PO 00000
Frm 00010
Fmt 6652
Sfmt 6301
E:\BILLS\S4444.IS
S4444
kjohnson on DSK79L0C42PROD with BILLS
Important: This plain English summary was generated by AI and is provided for informational purposes only.
It is not legal advice. Always consult the official bill text on Congress.gov
or a qualified attorney for legal matters.