Federal
Energy Infrastructure Protection Act of 2020
Source: Congress.gov ·
10,528 words in original text
Plain English summary not yet available
The full original text is available below. Check back soon as we process this bill.
II
116TH CONGRESS
2D SESSION
S. 3688
To amend the Federal Power Act to authorize the Federal Energy Regulatory
Commission and the Secretary of Energy to offer assistance in securing
the assets of the owners and operators of energy infrastructure against
threats and increasing the security of the electric grid, and for other
purposes.
IN THE SENATE OF THE UNITED STATES
MAY 12, 2020
Ms. MURKOWSKI (for herself and Mr. RISCH) introduced the following bill;
which was read twice and referred to the Committee on Energy and Nat-
ural Resources
A BILL
To amend the Federal Power Act to authorize the Federal
Energy Regulatory Commission and the Secretary of En-
ergy to offer assistance in securing the assets of the
owners and operators of energy infrastructure against
threats and increasing the security of the electric grid,
and for other purposes.
Be it enacted by the Senate and House of Representa-
1
tives of the United States of America in Congress assembled,
2
SECTION 1. SHORT TITLE.
3
This Act may be cited as the ‘‘Energy Infrastructure
4
Protection Act of 2020’’.
5
VerDate Sep 11 2014
21:56 May 27, 2020
Jkt 099200
PO 00000
Frm 00001
Fmt 6652
Sfmt 6201
E:\BILLS\S3688.IS
S3688
jbell on DSKJLSW7X2PROD with BILLS
2
•S 3688 IS
SEC. 2. SENSE OF CONGRESS.
1
It is the sense of Congress that—
2
(1) electrical energy is essential to civil society;
3
(2) the infrastructure that delivers electrical en-
4
ergy to the people of the United States has been vul-
5
nerable to attacks of varying scope for more than
6
100 years;
7
(3) with the ready availability of information
8
about electric infrastructure, and the ease of inter-
9
national travel for individuals who seek to harm the
10
United States, threats to electric infrastructure have
11
multiplied in recent years;
12
(4) the geographic barriers of the Pacific Ocean
13
and the Atlantic Ocean no longer provide sufficient
14
protection for the people of the United States
15
against threats to electric infrastructure, especially
16
for threats coming from cyberspace;
17
(5) electric infrastructure around the world has
18
been attacked during times of war and times of
19
peace, on the ground and in cyberspace, by—
20
(A) individuals;
21
(B) criminal organizations; and
22
(C) foreign countries;
23
(6) like electric infrastructure, the fuel sup-
24
pliers and other vendors who supply the electricity
25
VerDate Sep 11 2014
21:56 May 27, 2020
Jkt 099200
PO 00000
Frm 00002
Fmt 6652
Sfmt 6201
E:\BILLS\S3688.IS
S3688
jbell on DSKJLSW7X2PROD with BILLS
3
•S 3688 IS
industry are vulnerable to attacks designed to dis-
1
rupt electricity service;
2
(7) before and during World War II, the Fed-
3
eral Power Commission assisted owners and opera-
4
tors of energy infrastructure in defending the assets
5
of those owners and operators;
6
(8) the Department of Energy and the Federal
7
Energy Regulatory Commission carry on the legacy
8
of security assistance established by the Federal
9
Power Commission;
10
(9) the Department of Energy, assisted by the
11
expertise at the National Laboratories, and utilizing
12
the statutory role of the Department as the lead
13
Federal agency for cybersecurity in the energy sec-
14
tor, has acted to assist owners and operators of elec-
15
tric infrastructure when those owners and operators
16
defend their assets;
17
(10) the Federal Energy Regulatory Commis-
18
sion, utilizing the jurisdiction of the Commission
19
over matters of cost recovery and electric reliability,
20
has acted to assist owners and operators of electric
21
infrastructure when those owners and operators de-
22
fend their assets;
23
(11) owners and operators of electric infrastruc-
24
ture, entities involved with electric infrastructure,
25
VerDate Sep 11 2014
21:56 May 27, 2020
Jkt 099200
PO 00000
Frm 00003
Fmt 6652
Sfmt 6201
E:\BILLS\S3688.IS
S3688
jbell on DSKJLSW7X2PROD with BILLS
4
•S 3688 IS
the Federal Energy Regulatory Commission, the De-
1
partment of Energy, other Federal departments and
2
agencies, States, and units of local government have
3
information that—
4
(A) can be used by those who seek to harm
5
the United States to disrupt electricity service;
6
and
7
(B) should be protected from excessive dis-
8
closure; and
9
(12) owners and operators of electric infrastruc-
10
ture—
11
(A) have been acting to reduce the vulner-
12
ability of their assets; and
13
(B) should have better opportunities to
14
further reduce the vulnerability of their assets.
15
SEC. 3. PROTECTING ENERGY INFRASTRUCTURE.
16
(a) IN GENERAL.—Part II of the Federal Power Act
17
(16 U.S.C. 824 et seq.) is amended—
18
(1) by adding at the end the following:
19
‘‘Subpart B—Protecting Energy Infrastructure’’;
20
(2) by redesignating section 215A (16 U.S.C.
21
824o–1) as section 230, and moving that section so
22
as to appear at the beginning of subpart B (as
23
added by paragraph (1)); and
24
VerDate Sep 11 2014
21:56 May 27, 2020
Jkt 099200
PO 00000
Frm 00004
Fmt 6652
Sfmt 6201
E:\BILLS\S3688.IS
S3688
jbell on DSKJLSW7X2PROD with BILLS
5
•S 3688 IS
(3) by inserting after section 201 (16 U.S.C.
1
824) the following:
2
‘‘Subpart A—General Requirements’’.
3
(b) DEFINITIONS.—Section 230 of the Federal Power
4
Act (as redesignated by subsection (a)(2)) is amended—
5
(1) in the section heading, by striking
6
‘‘CRITICAL ELECTRIC INFRASTRUCTURE SECU-
7
RITY’’ and inserting ‘‘DEFINITIONS’’;
8
(2) in subsection (a)—
9
(A) in the matter preceding paragraph (1),
10
by striking the subsection designation and
11
heading and all that follows through ‘‘this sec-
12
tion:’’ and inserting the following:
13
‘‘In this subpart:’’;
14
(B) in paragraph (1), by striking ‘‘such
15
terms’’ and all that follows through ‘‘respec-
16
tively.’’ and inserting ‘‘the terms in section
17
215(a).’’;
18
(C) by redesignating paragraphs (2), (3),
19
(4), (5), (6), (7), and (8) as paragraphs (3),
20
(4), (5), (6), (8), (9), and (12), respectively;
21
(D) by inserting after paragraph (1) the
22
following:
23
VerDate Sep 11 2014
21:56 May 27, 2020
Jkt 099200
PO 00000
Frm 00005
Fmt 6652
Sfmt 6201
E:\BILLS\S3688.IS
S3688
jbell on DSKJLSW7X2PROD with BILLS
6
•S 3688 IS
‘‘(2) COMMISSION.—The term ‘Commission’
1
means the Federal Energy Regulatory Commis-
2
sion.’’;
3
(E) in paragraph (3) (as so redesignated),
4
by inserting ‘‘energy infrastructure or’’ after
5
‘‘means’’;
6
(F) by striking paragraph (4) (as so redes-
7
ignated) and inserting the following:
8
‘‘(4) CRITICAL ELECTRIC INFRASTRUCTURE IN-
9
FORMATION.—
10
‘‘(A) IN
GENERAL.—The term ‘critical
11
electric infrastructure information’ means infor-
12
mation relating to critical electric infrastruc-
13
ture, or proposed critical electric infrastructure,
14
that—
15
‘‘(i) is generated by, or provided to,
16
the Secretary, the Commission, or any
17
other Federal department or agency;
18
‘‘(ii) is not classified national security
19
information; and
20
‘‘(iii) is designated as critical electric
21
infrastructure information by the Secretary
22
or the Commission under section 231(c) or
23
235.
24
VerDate Sep 11 2014
21:56 May 27, 2020
Jkt 099200
PO 00000
Frm 00006
Fmt 6652
Sfmt 6201
E:\BILLS\S3688.IS
S3688
jbell on DSKJLSW7X2PROD with BILLS
7
•S 3688 IS
‘‘(B) INCLUSIONS.—The term ‘critical elec-
1
tric infrastructure information’ includes any in-
2
formation that qualified as critical energy infra-
3
structure information under the regulations of
4
the Commission in effect on the day before the
5
date of enactment of the Energy Infrastructure
6
Protection Act of 2020.’’;
7
(G) in paragraph (5) (as so redesignated),
8
by striking ‘‘subsection (c)’’ and inserting ‘‘sec-
9
tion 231(b)’’;
10
(H) by inserting after paragraph (6) (as so
11
redesignated) the following:
12
‘‘(7) ENERGY
INFRASTRUCTURE.—The term
13
‘energy infrastructure’ includes—
14
‘‘(A) systems or assets comprising the
15
bulk-power system;
16
‘‘(B) systems or assets owned by electric
17
utilities;
18
‘‘(C) systems or assets that—
19
‘‘(i) allow for the transportation of
20
fuel, electricity, water, steam, heat, cold, or
21
any commodity that is used in the provi-
22
sion of electricity service; and
23
‘‘(ii) facilitate the delivery of—
24
VerDate Sep 11 2014
21:56 May 27, 2020
Jkt 099200
PO 00000
Frm 00007
Fmt 6652
Sfmt 6201
E:\BILLS\S3688.IS
S3688
jbell on DSKJLSW7X2PROD with BILLS
8
•S 3688 IS
‘‘(I) electrical energy to con-
1
sumers;
2
‘‘(II) wholesale transactions in
3
electrical energy; or
4
‘‘(III) the import or export of
5
electrical energy; and
6
‘‘(D) all systems or assets subject to the
7
jurisdiction of the Commission, including—
8
‘‘(i) pipelines for the transportation of
9
oil;
10
‘‘(ii) natural gas pipelines; and
11
‘‘(iii) water resources.’’;
12
(I) by inserting after paragraph (9) (as so
13
redesignated) the following:
14
‘‘(10) NATURAL
GAS;
NATURAL-GAS
COM-
15
PANY.—The terms ‘natural gas’ and ‘natural-gas
16
company’ have the meanings given the terms in sec-
17
tion 2 of the Natural Gas Act (15 U.S.C. 717a).
18
‘‘(11) OIL; OIL PIPELINE.—The terms ‘oil’ and
19
‘oil pipeline’ have the meanings given the terms in
20
section 1804 of the Energy Policy Act of 1992 (42
21
U.S.C. 7172 note; Public Law 102–486).’’; and
22
(J) by inserting after paragraph (12) (as
23
so redesignated) the following:
24
VerDate Sep 11 2014
21:56 May 27, 2020
Jkt 099200
PO 00000
Frm 00008
Fmt 6652
Sfmt 6201
E:\BILLS\S3688.IS
S3688
jbell on DSKJLSW7X2PROD with BILLS
9
•S 3688 IS
‘‘(13) SOURCE
OF
THE
INFORMATION.—The
1
term ‘source of the information’ means—
2
‘‘(A) the electric utility, Transmission Or-
3
ganization, natural-gas company, licensee, or oil
4
pipeline that provides to the Secretary or the
5
Commission, as applicable, critical electric in-
6
frastructure information, including—
7
‘‘(i) critical electric infrastructure in-
8
formation that is provided directly to the
9
Secretary or the Commission by the elec-
10
tric utility, Transmission Organization,
11
natural-gas company, licensee, or oil pipe-
12
line; and
13
‘‘(ii) critical electric infrastructure in-
14
formation that is provided to the Secretary
15
or the Commission by an intermediary;
16
‘‘(B) the Secretary, with respect to critical
17
electric infrastructure information that is cre-
18
ated by the Secretary;
19
‘‘(C) the Commission, with respect to crit-
20
ical electric infrastructure information that is
21
created by the Commission; and
22
‘‘(D) with respect to any critical electric
23
infrastructure information not described in sub-
24
paragraphs (A) through (C), the individual or
25
VerDate Sep 11 2014
21:56 May 27, 2020
Jkt 099200
PO 00000
Frm 00009
Fmt 6652
Sfmt 6201
E:\BILLS\S3688.IS
S3688
jbell on DSKJLSW7X2PROD with BILLS
10
•S 3688 IS
entity that provides to the Secretary or the
1
Commission, as applicable, the critical electric
2
infrastructure information.’’; and
3
(3) by inserting before subsection (b) the fol-
4
lowing:
5
‘‘SEC. 231. CRITICAL ELECTRIC INFRASTRUCTURE SECU-
6
RITY.’’.
7
(c) CRITICAL ELECTRIC INFRASTRUCTURE SECU-
8
RITY.—Section 231 of the Federal Power Act (as des-
9
ignated by subsection (b)(3)) is amended—
10
(1) by redesignating subsections (b) through (f)
11
as subsections (a) through (e), respectively;
12
(2) in paragraph (6)(B) of subsection (a) (as so
13
redesignated), by striking ‘‘subsection (c)’’ and in-
14
serting ‘‘subsection (b)’’;
15
(3) in subsection (c) (as so redesignated)—
16
(A) in paragraph (2)—
17
(i) in the matter preceding subpara-
18
graph (A), by striking ‘‘Not later’’ and all
19
that follows through ‘‘shall’’ and inserting
20
‘‘Each of the Secretary and the Commis-
21
sion, after consultation with the other,
22
shall’’;
23
(ii) in subparagraph (A), by adding
24
‘‘and’’ at the end after the semicolon;
25
VerDate Sep 11 2014
21:56 May 27, 2020
Jkt 099200
PO 00000
Frm 00010
Fmt 6652
Sfmt 6201
E:\BILLS\S3688.IS
S3688
jbell on DSKJLSW7X2PROD with BILLS
11
•S 3688 IS
(iii) in subparagraph (B), by striking
1
the semicolon at the end and inserting a
2
period; and
3
(iv) by striking subparagraphs (C)
4
and (D);
5
(B) by striking paragraph (3) and insert-
6
ing the following:
7
‘‘(3) AUTHORITY TO DESIGNATE.—
8
‘‘(A) IN GENERAL.—The Secretary and the
9
Commission may each designate information as
10
critical electric infrastructure information pur-
11
suant to the criteria and procedures established
12
by the Secretary or the Commission, as applica-
13
ble, under paragraph (2)(A).
14
‘‘(B) SUBMISSION OF REQUEST FOR DES-
15
IGNATION.—
16
‘‘(i) IN GENERAL.—Any individual or
17
entity may request that—
18
‘‘(I) the Secretary designate in-
19
formation in the possession of the
20
Secretary as critical electric infra-
21
structure information; and
22
‘‘(II) the Commission designate
23
information in the possession of the
24
VerDate Sep 11 2014
21:56 May 27, 2020
Jkt 099200
PO 00000
Frm 00011
Fmt 6652
Sfmt 6201
E:\BILLS\S3688.IS
S3688
jbell on DSKJLSW7X2PROD with BILLS
12
•S 3688 IS
Commission as critical electric infra-
1
structure information.
2
‘‘(ii) TREATMENT
OF
INFORMATION
3
SUBMITTED
FOR
DESIGNATION.—On re-
4
ceipt of a request under clause (i), the Sec-
5
retary or the Commission, as applicable,
6
shall treat the information that is the sub-
7
ject of the request as critical electric infra-
8
structure information until the earlier of—
9
‘‘(I) the date on which the Sec-
10
retary or the Commission, as applica-
11
ble, designates the information as crit-
12
ical electric infrastructure informa-
13
tion; and
14
‘‘(II) the date that is 21 days
15
after the date on which the Secretary
16
or the Commission, as applicable, pro-
17
vides written notice to the individual
18
or entity that submitted the request
19
that the request is denied.
20
‘‘(C) CONFLICTS BETWEEN DESIGNATIONS
21
BY THE SECRETARY AND THE COMMISSION.—
22
‘‘(i) INITIAL MEETING.—In the event
23
of a conflict between a designation made
24
by the Secretary and a designation made
25
VerDate Sep 11 2014
21:56 May 27, 2020
Jkt 099200
PO 00000
Frm 00012
Fmt 6652
Sfmt 6201
E:\BILLS\S3688.IS
S3688
jbell on DSKJLSW7X2PROD with BILLS
13
•S 3688 IS
by the Commission as to whether certain
1
information is critical electric infrastruc-
2
ture information, and the conflict has a
3
material impact on the work of the Sec-
4
retary or the Commission, the Secretary
5
and the Commission shall confer to resolve
6
the conflict for the purpose of achieving
7
consistency across the Federal Government
8
in the designation of the information.
9
‘‘(ii) UNRESOLVED
CONFLICTS.—If
10
the Secretary and the Commission are un-
11
able to resolve a conflict under clause (i)—
12
‘‘(I) the Commission may con-
13
tinue to designate any information in
14
the possession of the Commission ac-
15
cording to the criteria and procedures
16
established by the Commission u
[Text truncated for display. Full text available on Congress.gov.]
Important: This plain English summary was generated by AI and is provided for informational purposes only.
It is not legal advice. Always consult the official bill text on Congress.gov
or a qualified attorney for legal matters.