Federal
A bill to establish a lower Missouri River flood prevention program, and for other purposes.
Source: Congress.gov ·
1,489 words in original text
Plain English summary not yet available
The full original text is available below. Check back soon as we process this bill.
II
116TH CONGRESS
2D SESSION
S. 3403
To establish a lower Missouri River flood prevention program, and for other
purposes.
IN THE SENATE OF THE UNITED STATES
MARCH 5, 2020
Mr. BLUNT (for himself, Mr. GRASSLEY, Mr. ROBERTS, Mr. MORAN, Mrs.
FISCHER, Mr. HAWLEY, Ms. ERNST, and Mr. SASSE) introduced the fol-
lowing bill; which was read twice and referred to the Committee on Envi-
ronment and Public Works
A BILL
To establish a lower Missouri River flood prevention
program, and for other purposes.
Be it enacted by the Senate and House of Representa-
1
tives of the United States of America in Congress assembled,
2
SECTION 1. LOWER MISSOURI RIVER FLOOD PREVENTION
3
PROGRAM.
4
(a) DEFINITIONS.—In this section:
5
(1) AFFECTED
COMMUNITY.—The term ‘‘af-
6
fected community’’ means a legally constituted pub-
7
lic body (as that term is used in section 221(b) of
8
the Flood Control Act of 1970 (42 U.S.C. 1962d–
9
VerDate Sep 11 2014
18:14 Mar 10, 2020
Jkt 099200
PO 00000
Frm 00001
Fmt 6652
Sfmt 6201
E:\BILLS\S3403.IS
S3403
pamtmann on DSKBC07HB2PROD with BILLS
2
•S 3403 IS
5b(b)) the jurisdiction of which has been subject to
1
flooding from the lower Missouri River or a tribu-
2
tary of the lower Missouri River in not less than 2
3
events during any 10-year period beginning on or
4
after January 1, 2000, notwithstanding the provi-
5
sion of emergency flood fighting assistance under
6
section 5 of the Act of August 18, 1941 (commonly
7
known as the ‘‘Flood Control Act of 1941’’) (55
8
Stat. 650, chapter 377; 33 U.S.C. 701n), from the
9
Corps of Engineers during those flooding events.
10
(2) LOWER MISSOURI RIVER.—The term ‘‘lower
11
Missouri River’’ means—
12
(A) the lower 735 miles of the Missouri
13
River from Sioux City, Iowa, to the mouth of
14
the Missouri River; and
15
(B) the tributaries of the portion of the
16
Missouri River described in subparagraph (A).
17
(3) MISSOURI
RIVER
PROJECT.—The term
18
‘‘Missouri River project’’ means—
19
(A) a project constructed as part of—
20
(i) the Pick-Sloan Missouri River
21
Basin Program authorized by section 9(b)
22
of the Act of December 22, 1944 (com-
23
monly known as the ‘‘Flood Control Act of
24
1944’’) (58 Stat. 891, chapter 665); or
25
VerDate Sep 11 2014
18:14 Mar 10, 2020
Jkt 099200
PO 00000
Frm 00002
Fmt 6652
Sfmt 6201
E:\BILLS\S3403.IS
S3403
pamtmann on DSKBC07HB2PROD with BILLS
3
•S 3403 IS
(ii) the Missouri River Bank Stabiliza-
1
tion and Navigation Project authorized by
2
section 2 of the Act of March 2, 1945
3
(commonly known as the ‘‘River and Har-
4
bor Act of 1945’’) (59 Stat. 19, chapter
5
19); and
6
(B) a locally owned levee system, as identi-
7
fied by the Secretary for participation under the
8
program under subsection (b).
9
(4) SECRETARY.—The term ‘‘Secretary’’ means
10
the Secretary of the Army.
11
(b) PROGRAM.—
12
(1) IN
GENERAL.—The Secretary shall carry
13
out a program to study, design, and construct water
14
resources development projects, and modifications to
15
completed water resources development projects, to
16
provide flood protection to affected communities.
17
(2) PRELIMINARY TECHNICAL EVALUATIONS.—
18
The Secretary shall carry out, at full Federal ex-
19
pense, any technical evaluations or analyses of a
20
Missouri River project determined by the Secretary
21
to be necessary to formulate flood protection rec-
22
ommendations for affected communities that avoid
23
or minimize—
24
VerDate Sep 11 2014
18:14 Mar 10, 2020
Jkt 099200
PO 00000
Frm 00003
Fmt 6652
Sfmt 6201
E:\BILLS\S3403.IS
S3403
pamtmann on DSKBC07HB2PROD with BILLS
4
•S 3403 IS
(A) the potential for flood risk transfer;
1
and
2
(B) adverse impacts to navigation and
3
other authorized purposes of the applicable Mis-
4
souri River project.
5
(3) SYSTEM PLAN.—
6
(A) IN GENERAL.—A preliminary technical
7
evaluation under paragraph (2) shall include
8
development of a system plan for reducing flood
9
risk and improving resiliency that shall be used
10
in recommending projects for construction.
11
(B) CONSIDERATIONS.—In developing a
12
system plan under subparagraph (A), the Sec-
13
retary shall consider—
14
(i) recommendations of the Pick-Sloan
15
Missouri River Basin Program authorized
16
by section 9(b) of the Act of December 22,
17
1944 (commonly known as the ‘‘Flood
18
Control Act of 1944’’) (58 Stat. 891, chap-
19
ter 665), and subsequent relevant engi-
20
neering observations and reports; and
21
(ii) the use of both structural and
22
nonstructural measures, including the set-
23
ting back of levees and removing struc-
24
tures from areas of recurring flood vulner-
25
VerDate Sep 11 2014
18:14 Mar 10, 2020
Jkt 099200
PO 00000
Frm 00004
Fmt 6652
Sfmt 6201
E:\BILLS\S3403.IS
S3403
pamtmann on DSKBC07HB2PROD with BILLS
5
•S 3403 IS
ability where advantageous to reduce sys-
1
tem flood risk and damages, and where lo-
2
cally acceptable.
3
(4) CONSULTATION.—The Secretary shall carry
4
out the program under this subsection in consulta-
5
tion with applicable Federal and State agencies, In-
6
dian Tribes, and other stakeholders.
7
(5) CONSTRUCTION.—
8
(A)
FEASIBILITY
REPORT.—For
each
9
project recommended for construction under
10
this subsection, the District Commander of the
11
district in which the project is located shall de-
12
velop a feasibility report for approval by the
13
Commander of the Northwestern Division of
14
the Corps of Engineers that includes project
15
features, costs, cooperation requirements, and
16
justification.
17
(B) CONSTRUCTION OF PROJECTS.—After
18
approval of a feasibility report under subpara-
19
graph (A) and subject to paragraph (6), the
20
Secretary shall construct the project.
21
(C) TIMELINESS.—The Secretary shall
22
carry out feasibility studies and construction
23
phase activities under this subsection as expedi-
24
tiously as possible, including by concurrently
25
VerDate Sep 11 2014
18:14 Mar 10, 2020
Jkt 099200
PO 00000
Frm 00005
Fmt 6652
Sfmt 6201
E:\BILLS\S3403.IS
S3403
pamtmann on DSKBC07HB2PROD with BILLS
6
•S 3403 IS
conducting project planning and construction
1
activities where advisable.
2
(6) COST.—
3
(A) IN
GENERAL.—Except as provided
4
under subparagraph (B), not more than
5
$75,000,000 may be used for the Federal costs
6
of construction of a project under this sub-
7
section.
8
(B) SPECIFIC AUTHORIZATION.—The Sec-
9
retary may carry out a project under this sub-
10
section for which the Federal share of the cost
11
of the project exceeds $75,000,000 if Congress
12
provides a specific authorization for the project
13
prior to construction.
14
(7) COST-SHARE.—
15
(A) IN
GENERAL.—Notwithstanding any
16
other provision of law and subject to subpara-
17
graph (C), the Federal share of the cost of a
18
feasibility study or project carried out under
19
this subsection shall be 80 percent.
20
(B) INCLUSIONS.—Costs of a project car-
21
ried out under this subsection shall include the
22
costs of—
23
(i) design;
24
VerDate Sep 11 2014
18:14 Mar 10, 2020
Jkt 099200
PO 00000
Frm 00006
Fmt 6652
Sfmt 6201
E:\BILLS\S3403.IS
S3403
pamtmann on DSKBC07HB2PROD with BILLS
7
•S 3403 IS
(ii) design-related activities and data
1
gathering;
2
(iii) all land, easements, right-of-way
3
acquisitions, and borrow and disposal
4
areas, including related administrative
5
costs, required for construction and main-
6
tenance of the project;
7
(iv) costs to relocate compensable
8
public and private utilities; and
9
(v)
construction
and
construction
10
management.
11
(C) ABILITY TO PAY.—
12
(i)
IN
GENERAL.—A
cost-sharing
13
agreement for a project under this sub-
14
section shall be subject to the ability of the
15
affected community to pay.
16
(ii) DETERMINATION.—The ability of
17
an affected community to pay shall be de-
18
termined by the Secretary, in accordance
19
with procedures established by the Sec-
20
retary.
21
(iii) TREATMENT.—Any reduction in
22
the share of the affected community of the
23
cost of a project under this subsection in
24
accordance with clause (i) shall not be in-
25
VerDate Sep 11 2014
18:14 Mar 10, 2020
Jkt 099200
PO 00000
Frm 00007
Fmt 6652
Sfmt 6201
E:\BILLS\S3403.IS
S3403
pamtmann on DSKBC07HB2PROD with BILLS
8
•S 3403 IS
cluded for purposes of the amount de-
1
scribed in paragraph (6)(A).
2
(8) TRANSFER.—On completion of a project
3
under this subsection, the Secretary shall transfer
4
ownership (including operation and maintenance re-
5
sponsibility) of the project, including any permanent
6
land and easements acquired for the project, to the
7
non-Federal interest.
8
(9) AUTHORIZATION
OF
APPROPRIATIONS.—
9
There is authorized to be appropriated for planning,
10
design,
and
construction
under
this
section
11
$500,000,000, to remain available until expended.
12
Æ
VerDate Sep 11 2014
18:14 Mar 10, 2020
Jkt 099200
PO 00000
Frm 00008
Fmt 6652
Sfmt 6301
E:\BILLS\S3403.IS
S3403
pamtmann on DSKBC07HB2PROD with BILLS
Important: This plain English summary was generated by AI and is provided for informational purposes only.
It is not legal advice. Always consult the official bill text on Congress.gov
or a qualified attorney for legal matters.