Plain English summary not yet available
The full original text is available below. Check back soon as we process this bill.
II
116TH CONGRESS
1ST SESSION
S. 2422
To advance the integration of clean distributed energy into electric grids,
and for other purposes.
IN THE SENATE OF THE UNITED STATES
AUGUST 1, 2019
Mrs. SHAHEEN introduced the following bill; which was read twice and
referred to the Committee on Energy and Natural Resources
A BILL
To advance the integration of clean distributed energy into
electric grids, and for other purposes.
Be it enacted by the Senate and House of Representa-
1
tives of the United States of America in Congress assembled,
2
SECTION 1. SHORT TITLE.
3
This Act may be cited as the ‘‘Clean Energy Grid
4
Act of 2019’’.
5
SEC. 2. FINDINGS.
6
Congress finds that—
7
(1) research by the Secretary of Energy and the
8
Administrator of the Environmental Protection
9
Agency has found that clean distributed energy tech-
10
VerDate Sep 11 2014
02:15 Aug 15, 2019
Jkt 089200
PO 00000
Frm 00001
Fmt 6652
Sfmt 6201
E:\BILLS\S2422.IS
S2422
kjohnson on DSK79L0C42 with BILLS
2
•S 2422 IS
nologies can create important values for both the
1
host facility and the electric grid operator;
2
(2) the values described in paragraph (1) can
3
include, for the host facility—
4
(A) energy bill savings;
5
(B) additional revenue from offering ancil-
6
lary services to the electric grid operator;
7
(C) increased electric reliability in the
8
event of grid outages; and
9
(D) improved electric power quality;
10
(3) the values described in paragraph (1) can
11
include, for the electric grid operator—
12
(A) avoiding the need for transmission and
13
distribution upgrade investments;
14
(B) enhanced grid stability by providing
15
reactive power;
16
(C) voltage and frequency stabilization;
17
and
18
(D) more reliable and stable operation of
19
the grid by providing dispatchable energy to the
20
grid during periods of insufficient capacity or
21
supply; and
22
(4) new advances in intelligent sensing and sim-
23
ulation and control technologies offer the potential
24
to enhance the benefits of clean distributed genera-
25
VerDate Sep 11 2014
02:15 Aug 15, 2019
Jkt 089200
PO 00000
Frm 00002
Fmt 6652
Sfmt 6201
E:\BILLS\S2422.IS
S2422
kjohnson on DSK79L0C42 with BILLS
3
•S 2422 IS
tion to both the host facility and the electric grid op-
1
erator from dynamic, adaptive, and anticipatory re-
2
sponse to changing grid conditions.
3
SEC. 3. DEFINITIONS.
4
In this Act:
5
(1) ANCILLARY SERVICE.—The term ‘‘ancillary
6
service’’ means those services necessary to support
7
the transmission of electric power from seller to pur-
8
chaser given the obligations of control areas and
9
transmitting utilities within those control areas to
10
maintain reliable operations of the interconnected
11
transmission system.
12
(2) CLEAN DISTRIBUTED ENERGY.—The term
13
‘‘clean distributed energy’’ means energy tech-
14
nologies that are located on or near the customer
15
site operating on the customer side of the electric
16
meter and are interconnected with the electric grid,
17
including—
18
(A) clean electric generation;
19
(B) customer electric efficiency measures;
20
(C) electric demand flexibility; and
21
(D) energy storage.
22
(3) GRID.—The term ‘‘grid’’ means the electric
23
grid that is composed of both distribution and trans-
24
VerDate Sep 11 2014
02:15 Aug 15, 2019
Jkt 089200
PO 00000
Frm 00003
Fmt 6652
Sfmt 6201
E:\BILLS\S2422.IS
S2422
kjohnson on DSK79L0C42 with BILLS
4
•S 2422 IS
mission lines, and associated facilities, including sub-
1
stations, sensors, and operational controls.
2
(4) INTELLIGENCE.—The term ‘‘intelligence’’
3
means any devices or technologies that manifest
4
adaptive, anticipatory, and dynamic optimization be-
5
havior.
6
(5) SECRETARY.—The term ‘‘Secretary’’ means
7
the Secretary of Energy.
8
SEC. 4. RESEARCH AND DEPLOYMENT PLAN FOR EN-
9
HANCED INTEGRATION OF CLEAN DISTRIB-
10
UTED ENERGY WITH THE GRID.
11
(a) IN GENERAL.—The Secretary shall carry out ef-
12
forts for advancing the integration of clean distributed en-
13
ergy into electric grids.
14
(b) STUDY AND REPORT ON THE STATUS OF GRID
15
INTEGRATION.—
16
(1) IN
GENERAL.—Not later than 180 days
17
after the date of enactment of this Act, the Sec-
18
retary, after consultation with State public utility
19
commissions, State energy offices, regional trans-
20
mission organizations, electric and natural gas utili-
21
ties, independent power producers, clean distributed
22
energy providers, public interest organizations, and
23
other appropriate stakeholders, shall conduct a study
24
on the status of integration of clean distributed en-
25
VerDate Sep 11 2014
02:15 Aug 15, 2019
Jkt 089200
PO 00000
Frm 00004
Fmt 6652
Sfmt 6201
E:\BILLS\S2422.IS
S2422
kjohnson on DSK79L0C42 with BILLS
5
•S 2422 IS
ergy into the grid, identifying any issues that require
1
additional research or regulatory development.
2
(2) INCLUSIONS.—In conducting the study
3
under paragraph (1), the Secretary shall—
4
(A) identify and quantify the benefits to all
5
stakeholders of expanded integration of clean
6
distributed energy resources into the grid;
7
(B) identify any technical issues (including
8
cybersecurity concerns) that require research to
9
identify solutions; and
10
(C) identify any regulatory barriers that
11
inhibit the expanded integration of clean dis-
12
tributed energy resources into the grid.
13
(3) REPORT.—Not later than 1 year after the
14
date of enactment of this Act, the Secretary shall
15
submit to Congress a report describing the results of
16
the study conducted under paragraph (1).
17
(4) BEST PRACTICES.—Based on the findings
18
of the report described in paragraph (3), the Sec-
19
retary shall establish and distribute to States best
20
practices to encourage the integration of clean dis-
21
tributed energy into the grid.
22
(5) FUNDING.—The Secretary shall use unobli-
23
gated funds of the Department of Energy to carry
24
out this subsection.
25
VerDate Sep 11 2014
02:15 Aug 15, 2019
Jkt 089200
PO 00000
Frm 00005
Fmt 6652
Sfmt 6201
E:\BILLS\S2422.IS
S2422
kjohnson on DSK79L0C42 with BILLS
6
•S 2422 IS
(c) RESEARCH INTO THE TECHNICAL BARRIERS TO
1
THE INTEGRATION
OF CLEAN DISTRIBUTED ENERGY
2
WITH THE GRID.—
3
(1) IN GENERAL.—Not later than 18 months
4
after the date of enactment of this Act, the Sec-
5
retary shall—
6
(A) issue a solicitation for research pro-
7
posals to address the technical barriers identi-
8
fied in the report submitted under subsection
9
(b)(3); and
10
(B) make grants to those applicants with
11
research proposals selected by the Secretary in
12
accordance with paragraph (2).
13
(2) CRITERIA.—The Secretary shall select re-
14
search proposals to receive a grant under this sub-
15
section on the basis of merit, using criteria identified
16
by the Secretary, including the likelihood that the
17
research results will address critical barriers identi-
18
fied by the Secretary.
19
(3) FUNDING.—Beginning in the first full fiscal
20
year following the date of enactment of this Act, and
21
annually thereafter for 2 years, the Secretary may
22
request funding as necessary to carry out this sub-
23
section, but in no case shall funding exceed
24
$5,000,000 in any 1 fiscal year.
25
VerDate Sep 11 2014
02:15 Aug 15, 2019
Jkt 089200
PO 00000
Frm 00006
Fmt 6652
Sfmt 6201
E:\BILLS\S2422.IS
S2422
kjohnson on DSK79L0C42 with BILLS
7
•S 2422 IS
(d) CREATION
OF
A
STAKEHOLDER
WORKING
1
GROUP.—
2
(1) IN GENERAL.—Not later than 18 months
3
after the date of enactment of this Act, the Sec-
4
retary shall convene a working group (referred to in
5
this subsection as the ‘‘Group’’) to address regu-
6
latory barriers to deployment of intelligent grid inte-
7
gration of clean distributed energy technologies.
8
(2) PURPOSE.—The purpose of the Group is to
9
provide guidance on how to address the regulatory
10
and economic factors that limit widespread integra-
11
tion of grid-level clean distributed energy use in
12
order to advance the integration of clean distributed
13
energy into electric grids.
14
(3) MEMBERSHIP.—The Group shall be com-
15
posed of—
16
(A) representatives from—
17
(i) State public utility commissions;
18
(ii) State energy offices;
19
(iii) regional transmission organiza-
20
tions;
21
(iv) electric and natural gas utilities;
22
(v) independent power producers;
23
(vi) clean distributed energy providers;
24
and
25
VerDate Sep 11 2014
02:15 Aug 15, 2019
Jkt 089200
PO 00000
Frm 00007
Fmt 6652
Sfmt 6201
E:\BILLS\S2422.IS
S2422
kjohnson on DSK79L0C42 with BILLS
8
•S 2422 IS
(vii) public interest organizations; and
1
(B) any other appropriate stakeholders de-
2
termined by the Secretary to have a material
3
interest in the development, implementation,
4
siting, and integration of clean distributed en-
5
ergy technology or systems into the electric
6
grid.
7
(4) DUTIES.—The duties of the Group shall
8
be—
9
(A) to review the regulatory barriers iden-
10
tified in the report prepared by the Secretary
11
under subsection (b)(3);
12
(B) to identify any additional regulatory
13
barriers that inhibit the installation of distrib-
14
uted energy; and
15
(C) to recommend to the Secretary actions
16
that should be considered to remove the bar-
17
riers identified under subparagraphs (A) and
18
(B).
19
(5) REPORT.—Not later than 3 years after the
20
date of enactment of this Act, the Secretary shall
21
prepare and submit to Congress a report based on
22
the recommendations of the Group under paragraph
23
(4)(C), to be made publicly available.
24
VerDate Sep 11 2014
02:15 Aug 15, 2019
Jkt 089200
PO 00000
Frm 00008
Fmt 6652
Sfmt 6201
E:\BILLS\S2422.IS
S2422
kjohnson on DSK79L0C42 with BILLS
9
•S 2422 IS
(6) FUNDING.—The Secretary may request
1
funding as necessary to carry out this subsection,
2
but in no case shall funding exceed $2,000,000 in
3
any 1 fiscal year.
4
(e) DEMONSTRATIONS OF INTELLIGENT GRID INTE-
5
GRATION OF CLEAN DISTRIBUTED ENERGY SYSTEMS.—
6
(1) IN GENERAL.—Based on the findings in the
7
reports conducted under this section and not later
8
than 3 years after the date of enactment of this Act,
9
the Secretary shall issue a solicitation for dem-
10
onstration of integration of distributed energy re-
11
sources into the grid.
12
(2) ELIGIBLE ENTITIES.—Any individual entity
13
or group of entities may submit to the Secretary
14
proposals for demonstration projects based on the
15
solicitation described in paragraph (1), including—
16
(A) State and local agencies;
17
(B) public institutions;
18
(C) private companies;
19
(D) electric and natural gas utilities; and
20
(E) equipment manufacturers.
21
(3) GRANTS AUTHORIZED.—The Secretary may
22
make grants, in amounts not to exceed a total of
23
$5,000,000, to eligible entities to carry out dem-
24
onstration projects, to be selected based on—
25
VerDate Sep 11 2014
02:15 Aug 15, 2019
Jkt 089200
PO 00000
Frm 00009
Fmt 6652
Sfmt 6201
E:\BILLS\S2422.IS
S2422
kjohnson on DSK79L0C42 with BILLS
10
•S 2422 IS
(A) the technical merits of the demonstra-
1
tion project;
2
(B) the likelihood that the demonstration
3
project will address critical barriers identified
4
by the Secretary under this section; and
5
(C) the share of non-Federal funds for the
6
demonstration project.
7
(4) FUNDING.—Beginning in the third full fis-
8
cal year following the date of enactment of this Act,
9
and annually thereafter for 3 years, the Secretary
10
may request funding as necessary to carry out this
11
subsection, but in no case shall funding exceed
12
$15,000,000 in any 1 fiscal year.
13
(f) REPORT.—The Secretary annually shall submit to
14
Congress a report that—
15
(1) describes the progress made in carrying out
16
this section; and
17
(2) identifies any technical or regulatory issues
18
that require legislative action.
19
Æ
VerDate Sep 11 2014
02:15 Aug 15, 2019
Jkt 089200
PO 00000
Frm 00010
Fmt 6652
Sfmt 6301
E:\BILLS\S2422.IS
S2422
kjohnson on DSK79L0C42 with BILLS
Important: This plain English summary was generated by AI and is provided for informational purposes only.
It is not legal advice. Always consult the official bill text on Congress.gov
or a qualified attorney for legal matters.