Plain English summary not yet available
The full original text is available below. Check back soon as we process this bill.
I
116TH CONGRESS
1ST SESSION H. R. 1502
To modernize the Public Utility Regulatory Policies Act of 1978, and for
other purposes.
IN THE HOUSE OF REPRESENTATIVES
MARCH 5, 2019
Mr. WALBERG (for himself, Mr. GIANFORTE, and Mr. MITCHELL) introduced
the following bill; which was referred to the Committee on Energy and
Commerce
A BILL
To modernize the Public Utility Regulatory Policies Act of
1978, and for other purposes.
Be it enacted by the Senate and House of Representa-
1
tives of the United States of America in Congress assembled,
2
SECTION 1. SHORT TITLE.
3
This Act may be cited as the ‘‘PURPA Modernization
4
Act of 2019’’.
5
SEC. 2. LOCATION OF SMALL POWER PRODUCTION FACILI-
6
TIES.
7
(a) REBUTTABLE PRESUMPTION.—The Federal En-
8
ergy Regulatory Commission shall, not later than 180
9
days after the date of enactment of this Act, publish in
10
VerDate Sep 11 2014
00:07 Mar 16, 2019
Jkt 089200
PO 00000
Frm 00001
Fmt 6652
Sfmt 6201
E:\BILLS\H1502.IH
H1502
kjohnson on DSK79L0C42 with BILLS
2
•HR 1502 IH
the Federal Register a final rule amending its regulations
1
implementing section 3(17)(A)(ii) of the Federal Power
2
Act (16 U.S.C. 796(17)(A)(ii)), regarding the method for
3
determining whether facilities are considered to be located
4
at the same site as the facility for which qualification is
5
sought for the purpose of calculating power production ca-
6
pacity, to provide a rebuttable presumption that—
7
(1) facilities located one mile or more away
8
from each other are not located at the same site;
9
and
10
(2) facilities located within one mile of each
11
other are located at the same site.
12
(b) OVERCOMING THE PRESUMPTION.—
13
(1) IN GENERAL.—Except as provided in para-
14
graph (3), the Commission shall allow any person
15
(as defined in section 385.102 of title 18, Code of
16
Federal Regulations, as in effect on the date of en-
17
actment of this Act) to rebut the presumption de-
18
scribed in subsection (a).
19
(2) FACTORS TO BE CONSIDERED.—In deter-
20
mining whether a facility is considered to be located
21
at the same site as the facility for which qualifica-
22
tion is sought, the Commission shall take into ac-
23
count, to the extent practicable, the following fac-
24
tors:
25
VerDate Sep 11 2014
00:07 Mar 16, 2019
Jkt 089200
PO 00000
Frm 00002
Fmt 6652
Sfmt 6201
E:\BILLS\H1502.IH
H1502
kjohnson on DSK79L0C42 with BILLS
3
•HR 1502 IH
(A) The extent to which the owners or op-
1
erators of the facilities are affiliated or associ-
2
ated with each other, or are under the control
3
of the same company or person.
4
(B) The extent to which the owners or op-
5
erators of the facilities have treated the facili-
6
ties as a single project for purposes of other
7
regulatory filings or applications.
8
(C) Whether the facilities use the same en-
9
ergy resource.
10
(D) Whether the facilities have a common
11
generator lead line or connect at the same or
12
nearby interconnection points or substations.
13
(E) The extent to which the owners or op-
14
erators of the facilities have a common land
15
lease or land rights with respect to land on
16
which the facilities are located.
17
(F) The extent to which the owners or op-
18
erators of the facilities have common financing
19
with respect to the facilities.
20
(G) The extent to which the facilities are
21
part of a common development plan or permit-
22
ting effort, even if the interconnection of the fa-
23
cilities occurs at separate points.
24
VerDate Sep 11 2014
00:07 Mar 16, 2019
Jkt 089200
PO 00000
Frm 00003
Fmt 6652
Sfmt 6201
E:\BILLS\H1502.IH
H1502
kjohnson on DSK79L0C42 with BILLS
4
•HR 1502 IH
(3) EXCEPTION.—Paragraphs (1) and (2) shall
1
not apply with respect to a facility that, as of the
2
date of enactment of this Act—
3
(A) produces both electric energy and use-
4
ful thermal energy; and
5
(B) on a million British thermal unit basis,
6
uses at least 80 percent of its total annual ag-
7
gregate net output of electric energy and useful
8
thermal energy for onsite industrial, commer-
9
cial, or institutional purposes, rather than for
10
sale.
11
(c) AFFILIATION AND ASSOCIATION.—The Commis-
12
sion shall consider the owners or operators of facilities to
13
be affiliated or associated for purposes of this section if
14
they are affiliates or associate companies within the mean-
15
ing of those terms as defined in section 1262 of the Public
16
Utility Holding Company Act of 2005 (42 U.S.C. 16451).
17
(d) CONTROL.—The Commission shall consider the
18
owner or operator of a facility to be under the control of
19
a company or person for purposes of this section if—
20
(1) the company or person directly or indirectly
21
owns, controls, or holds, with power to vote, 10 per-
22
cent or more of the outstanding voting securities of
23
the owner or operator; or
24
VerDate Sep 11 2014
00:07 Mar 16, 2019
Jkt 089200
PO 00000
Frm 00004
Fmt 6652
Sfmt 6201
E:\BILLS\H1502.IH
H1502
kjohnson on DSK79L0C42 with BILLS
5
•HR 1502 IH
(2) the Commission determines, after notice
1
and opportunity for hearing, that the company or
2
person exercises, directly or indirectly (either alone
3
or pursuant to an arrangement or understanding
4
with one or more companies or persons), a control-
5
ling influence over the management of the owner or
6
operator.
7
SEC. 3. NONDISCRIMINATORY ACCESS.
8
Section 210(m) of the Public Utility Regulatory Poli-
9
cies Act of 1978 (16 U.S.C. 824a–3(m)) is amended by
10
adding at the end the following:
11
‘‘(8) NONDISCRIMINATORY ACCESS.—
12
‘‘(A) IN GENERAL.—For purposes of this
13
subsection, except as provided in subparagraph
14
(B), a qualifying small power production facility
15
with an installed generation capacity of 2.5
16
megawatts or greater is presumed to have non-
17
discriminatory access to transmission and inter-
18
connection services and wholesale markets de-
19
scribed in subparagraphs (A), (B), or (C) of
20
paragraph (1).
21
‘‘(B)
EXCEPTION.—Subparagraph
(A)
22
does not apply to a qualifying small power pro-
23
duction facility that, as of the date of enact-
24
ment of this paragraph—
25
VerDate Sep 11 2014
00:07 Mar 16, 2019
Jkt 089200
PO 00000
Frm 00005
Fmt 6652
Sfmt 6201
E:\BILLS\H1502.IH
H1502
kjohnson on DSK79L0C42 with BILLS
6
•HR 1502 IH
‘‘(i) produces both electric energy and
1
useful thermal energy; and
2
‘‘(ii) on a million British thermal unit
3
basis, uses at least 80 percent of its total
4
annual aggregate net output of electric en-
5
ergy and useful thermal energy for onsite
6
industrial, commercial, or institutional pur-
7
poses, rather than for sale.’’.
8
SEC. 4. RECOGNITION OF STATE OR LOCAL DETERMINA-
9
TIONS.
10
Section 210(m) of the Public Utility Regulatory Poli-
11
cies Act of 1978 (16 U.S.C. 824a–3(m)), as amended by
12
section 3, is further amended by adding at the end the
13
following:
14
‘‘(9) STATE OR LOCAL DETERMINATION.—After
15
the date of enactment of this paragraph, no electric
16
utility shall be required to enter into a new contract
17
or obligation to purchase electric energy under this
18
section from a qualifying small power production fa-
19
cility that is not a qualifying small power production
20
facility described in paragraph (8)(B) if the appro-
21
priate State regulatory agency or non-regulated elec-
22
tric utility finds, and submits to the Commission a
23
written determination, that—
24
VerDate Sep 11 2014
00:07 Mar 16, 2019
Jkt 089200
PO 00000
Frm 00006
Fmt 6652
Sfmt 6201
E:\BILLS\H1502.IH
H1502
kjohnson on DSK79L0C42 with BILLS
7
•HR 1502 IH
‘‘(A) the electric utility has no need to pur-
1
chase electric energy from such qualifying small
2
power production facility in the amounts to be
3
offered within the timeframe proposed by the
4
qualifying small power production facility, con-
5
sistent with the needs for electric energy and
6
the timeframe for those needs as specified in an
7
electric utility’s integrated resource plan, in
8
order to meet its obligation to serve customers;
9
or
10
‘‘(B) the electric utility employs integrated
11
resource planning and conducts a competitive
12
resource procurement process for long-term en-
13
ergy resources that provides an opportunity for
14
qualifying small power production facilities to
15
supply electric energy to the electric utility in
16
accordance with the integrated resource plan of
17
the electric utility.’’.
18
Æ
VerDate Sep 11 2014
00:07 Mar 16, 2019
Jkt 089200
PO 00000
Frm 00007
Fmt 6652
Sfmt 6301
E:\BILLS\H1502.IH
H1502
kjohnson on DSK79L0C42 with BILLS