I
117TH CONGRESS
1ST SESSION H. R. 3717
To require the Secretary of Energy to establish a program to provide grants
to improve power lines.
IN THE HOUSE OF REPRESENTATIVES
JUNE 4, 2021
Mr. SEAN PATRICK MALONEY of New York introduced the following bill;
which was referred to the Committee on Energy and Commerce
A BILL
To require the Secretary of Energy to establish a program
to provide grants to improve power lines.
Be it enacted by the Senate and House of Representa-
1
tives of the United States of America in Congress assembled,
2
SECTION 1. SHORT TITLE.
3
This Act may be cited as the ‘‘Power Line Resiliency
4
Act’’.
5
SEC. 2. POWER LINE IMPROVEMENT GRANT PROGRAM.
6
(a) ESTABLISHMENT.—Not later than 1 year after
7
the date of enactment of this section, the Secretary of En-
8
ergy shall establish a program to provide grants to electric
9
utilities to carry out eligible activities.
10
VerDate Sep 11 2014
16:25 Jun 28, 2021
Jkt 019200
PO 00000
Frm 00001
Fmt 6652
Sfmt 6201
E:\BILLS\H3717.IH
H3717
pamtmann on DSKBC07HB2PROD with BILLS
2
•HR 3717 IH
(b) GRANTS.—
1
(1) APPLICATION.—To apply for a grant pro-
2
vided under this section, an electric utility shall sub-
3
mit to the Secretary of Energy an application at
4
such time, in such manner, and containing such in-
5
formation as the Secretary of Energy may require.
6
(2) SELECTION.—The Secretary of Energy
7
shall provide grants under this section—
8
(A) on a competitive basis; and
9
(B) to geographically diverse electric utili-
10
ties.
11
(3) PRIORITY.—The Secretary of Energy shall
12
prioritize providing a grant under this section to any
13
electric utility that sells electricity in an area that
14
has a history of extreme weather events.
15
(c) SUNSET.—The program established under sub-
16
section (a) shall terminate on the date that is 5 years after
17
the date of enactment of this section.
18
(d) DEFINITIONS.—In this section:
19
(1) ELECTRIC
UTILITY.—The term ‘‘electric
20
utility’’ has the meaning given such term in section
21
3(22) of the Federal Power Act (16 U.S.C.
22
796(22)).
23
(2) ELIGIBLE ACTIVITY.—
24
VerDate Sep 11 2014
16:25 Jun 28, 2021
Jkt 019200
PO 00000
Frm 00002
Fmt 6652
Sfmt 6201
E:\BILLS\H3717.IH
H3717
pamtmann on DSKBC07HB2PROD with BILLS
3
•HR 3717 IH
(A) IN GENERAL.—The term ‘‘eligible ac-
1
tivity’’ means an activity that—
2
(i) is designed to improve the per-
3
formance or efficiency of a power line;
4
(ii) makes a power line more resilient
5
to an extreme weather event; or
6
(iii) otherwise ensures that an end-
7
user has access to electricity during an ex-
8
treme weather event.
9
(B) INCLUDES.—The term ‘‘eligible activ-
10
ity’’ includes—
11
(i) burying a power line;
12
(ii) hardening a power line; and
13
(iii) if burying a power line is not fea-
14
sible, providing a generator to a household
15
that is located in a remote area.
16
(3) EXTREME
WEATHER
EVENT.—The term
17
‘‘extreme weather event’’ means an historically rare
18
or severe natural disaster, including a heat wave,
19
drought, flood, tornado, and hurricane.
20
(4) POWER LINE.—The term ‘‘power line’’ in-
21
cludes distribution lines and transmission lines.
22
Æ
VerDate Sep 11 2014
16:25 Jun 28, 2021
Jkt 019200
PO 00000
Frm 00003
Fmt 6652
Sfmt 6301
E:\BILLS\H3717.IH
H3717
pamtmann on DSKBC07HB2PROD with BILLS