← Back to results
Federal

A bill to make certain irrigation districts eligible for Pick-Sloan Missouri Basin Program pumping power, and for other purposes.

Source: Congress.gov  ·  448 words in original text
This bill changes which irrigation districts can receive pumping power through the Pick-Sloan Missouri Basin Program. Specifically, it makes certain irrigation districts eligible to get this power if they are located in specific areas that were previously analyzed but not developed.
Irrigation districts located in the test area or in a 28,000-acre area that was analyzed but not developed. The Secretary (the head of the federal agency overseeing this program) who makes contracts with these districts.
• Irrigation districts in the test area become eligible to receive Pick-Sloan Missouri Basin Program pumping power (Sec. 1(6)(A)(i)) • Irrigation districts in the 28,000-acre area that was analyzed but not developed become eligible to receive pumping power (Sec. 1(6)(A)(ii)) • The Secretary can set any terms and rates for providing pumping power to eligible districts (Sec. 1(6)(B)(i)) • The Secretary may enter into a contract with eligible irrigation districts to provide pumping power (Sec. 1(6)(C)(i)) • No pumping power can be delivered until a contract between the Secretary and the irrigation district is signed (Sec. 1(6)(C)(ii))
Previously, certain irrigation districts were not eligible for Pick-Sloan Missouri Basin Program pumping power. After this bill becomes law, those irrigation districts in the specified locations become eligible to receive this power if they sign a contract with the Secretary.
Eligible irrigation district: an irrigation district located in the test area or in the 28,000-acre area that was analyzed but not developed.
Not specified in bill text
Important: This plain English summary was generated by AI and is provided for informational purposes only. It is not legal advice. Always consult the official bill text on Congress.gov or a qualified attorney for legal matters.