Federal
National Dam and Hydropower Safety Improvements Act of 2021
Source: Congress.gov ·
1,109 words in original text
Plain English summary not yet available
The full original text is available below. Check back soon as we process this bill.
I
117TH CONGRESS
1ST SESSION H. R. 2309
To improve dam and hydropower safety, and for other purposes.
IN THE HOUSE OF REPRESENTATIVES
APRIL 1, 2021
Mrs. DINGELL (for herself and Mr. MOOLENAAR) introduced the following bill;
which was referred to the Committee on Energy and Commerce
A BILL
To improve dam and hydropower safety, and for other
purposes.
Be it enacted by the Senate and House of Representa-
1
tives of the United States of America in Congress assembled,
2
SECTION 1. SHORT TITLE.
3
This Act may be cited as the ‘‘National Dam and Hy-
4
dropower Safety Improvements Act of 2021’’.
5
SEC. 2. DAM SAFETY CONDITIONS.
6
Section 10 of the Federal Power Act (16 U.S.C. 803)
7
is amended by adding at the end the following:
8
‘‘(k) That the dam and other project works meet the
9
Commission’s dam safety requirements and that the li-
10
censee shall continue to manage, operate, and maintain
11
VerDate Sep 11 2014
01:45 May 26, 2021
Jkt 019200
PO 00000
Frm 00001
Fmt 6652
Sfmt 6201
E:\BILLS\H2309.IH
H2309
pbinns on DSKJLVW7X2PROD with BILLS
2
•HR 2309 IH
the dam and other project works in a manner that ensures
1
dam safety and public safety under the operating condi-
2
tions of the license.’’.
3
SEC. 3. DAM SAFETY REQUIREMENTS.
4
Section 15 of the Federal Power Act (16 U.S.C. 808)
5
is amended by adding at the end the following:
6
‘‘(g) The Commission may issue a new license under
7
this section only if the Commission determines that the
8
dam and other project works covered by the license meet
9
the Commission’s dam safety requirements and that the
10
licensee can continue to manage, operate, and maintain
11
the dam and other project works in a manner that ensures
12
dam safety and public safety under the operating condi-
13
tions of the new license.’’.
14
SEC. 4. VIABILITY PROCEDURES.
15
The Federal Energy Regulatory Commission shall es-
16
tablish procedures to assess the financial viability of an
17
applicant for a license under the Federal Power Act (16
18
U.S.C. 791a et seq.) to—
19
(1) meet applicable dam safety requirements;
20
and
21
(2) operate the dam and project works under
22
the license.
23
VerDate Sep 11 2014
01:45 May 26, 2021
Jkt 019200
PO 00000
Frm 00002
Fmt 6652
Sfmt 6201
E:\BILLS\H2309.IH
H2309
pbinns on DSKJLVW7X2PROD with BILLS
3
•HR 2309 IH
SEC. 5. FERC DAM SAFETY TECHNICAL CONFERENCE WITH
1
STATES.
2
(a) TECHNICAL CONFERENCE.—Not later than April
3
1, 2022, the Federal Energy Regulatory Commission, act-
4
ing through the Director of the Office of Energy Projects,
5
shall hold a technical conference with the States to discuss
6
and provide information on—
7
(1) dam maintenance and repair;
8
(2) Risk Informed Decision Making;
9
(3) climate and hydrological regional changes
10
that may affect the structural integrity of dams; and
11
(4) high hazard dams.
12
(b) AUTHORIZATION OF APPROPRIATIONS.—There is
13
authorized to be appropriated to carry out this section
14
$1,000,000 for fiscal year 2022.
15
(c) STATE DEFINED.—In this section, the term
16
‘‘State’’ has the meaning given such term in section 3 of
17
the Federal Power Act (16 U.S.C. 796).
18
SEC. 6. REQUIRED DAM SAFETY COMMUNICATIONS BE-
19
TWEEN FERC AND STATES.
20
(a) IN GENERAL.—The Commission, acting through
21
the Director of the Office of Energy Projects, shall notify
22
each State within which a project is located when—
23
(1) the Commission issues a finding, following
24
a dam safety inspection, that requires the licensee
25
for such project to take actions to repair the dam
26
VerDate Sep 11 2014
01:45 May 26, 2021
Jkt 019200
PO 00000
Frm 00003
Fmt 6652
Sfmt 6201
E:\BILLS\H2309.IH
H2309
pbinns on DSKJLVW7X2PROD with BILLS
4
•HR 2309 IH
and other project works that are the subject of such
1
finding;
2
(2) after a period of 5 years starting on the
3
date a finding under paragraph (1) is issued, the li-
4
censee has failed to take actions to repair the dam
5
and other project works; and
6
(3) the Commission initiates a non-compliance
7
proceeding or otherwise takes steps to revoke a li-
8
cense due to the failure of a licensee to take actions
9
to repair a dam and other project works.
10
(b) NOTICE UPON REVOCATION, SURRENDER, OR IM-
11
PLIED SURRENDER OF A LICENSE.—If the Commission
12
issues an order to revoke a license or approve the sur-
13
render or implied surrender of a license under the Federal
14
Power Act (16 U.S.C. 792 et seq.), the Commission shall
15
provide to the State within which the project that relates
16
to such license is located—
17
(1) all records pertaining to the structure and
18
operation of the applicable dam and other project
19
works, including, as applicable, any dam safety in-
20
spection reports by independent consultants, speci-
21
fications for required repairs or maintenance of such
22
dam and other project works that have not been
23
completed, and estimates of the costs for such re-
24
pairs or maintenance;
25
VerDate Sep 11 2014
01:45 May 26, 2021
Jkt 019200
PO 00000
Frm 00004
Fmt 6652
Sfmt 6201
E:\BILLS\H2309.IH
H2309
pbinns on DSKJLVW7X2PROD with BILLS
5
•HR 2309 IH
(2) all records documenting the history of main-
1
tenance or repair work for the applicable dam and
2
other project works;
3
(3) information on the age of the dam and
4
other project works and the hazard classification of
5
the dam and other project works;
6
(4) the most recent assessment of the condition
7
of the dam and other project works by the Commis-
8
sion;
9
(5) as applicable, the most recent hydrologic in-
10
formation used to determine the potential maximum
11
flood for the dam and other project works; and
12
(6) the results of the most recent risk assess-
13
ment completed on the dam and other project works.
14
(c) DEFINITION.—In this section:
15
(1) COMMISSION.—The term ‘‘Commission’’
16
means the Federal Energy Regulatory Commission.
17
(2) LICENSEE.—The term ‘‘licensee’’ has the
18
meaning given such term in section 3 of the Federal
19
Power Act (16 U.S.C. 796).
20
(3) PROJECT.—The term ‘‘project’’ has the
21
meaning given such term in section 3 of the Federal
22
Power Act (16 U.S.C. 796).
23
Æ
VerDate Sep 11 2014
01:45 May 26, 2021
Jkt 019200
PO 00000
Frm 00005
Fmt 6652
Sfmt 6301
E:\BILLS\H2309.IH
H2309
pbinns on DSKJLVW7X2PROD with BILLS
Important: This plain English summary was generated by AI and is provided for informational purposes only.
It is not legal advice. Always consult the official bill text on Congress.gov
or a qualified attorney for legal matters.