Plain English summary not yet available
The full original text is available below. Check back soon as we process this bill.
II
117TH CONGRESS
1ST SESSION
S. 171
To authorize the Keystone XL Pipeline.
IN THE SENATE OF THE UNITED STATES
FEBRUARY 2, 2021
Mr. DAINES (for himself, Mr. HOEVEN, Mr. CRAMER, Mr. BARRASSO, Ms.
LUMMIS, Mr. RISCH, Mr. CRAPO, Mr. MORAN, Mr. MARSHALL, Mr. SUL-
LIVAN, Mr. CASSIDY, Mr. INHOFE, Mr. COTTON, Mr. CRUZ, and Mr.
KENNEDY) introduced the following bill; which was read twice and re-
ferred to the Committee on Energy and Natural Resources
A BILL
To authorize the Keystone XL Pipeline.
Be it enacted by the Senate and House of Representa-
1
tives of the United States of America in Congress assembled,
2
SECTION 1. SHORT TITLE.
3
This Act may be cited as the ‘‘Keystone XL Pipeline
4
Construction and Jobs Preservation Act’’.
5
SEC. 2. KEYSTONE XL AUTHORIZATION.
6
(a) AUTHORIZATION.—TransCanada Keystone Pipe-
7
line, L.P., may construct, connect, operate, and maintain
8
the pipeline facilities at the international border of the
9
United States and Canada at Phillips County, Montana,
10
VerDate Sep 11 2014
20:50 Feb 14, 2021
Jkt 019200
PO 00000
Frm 00001
Fmt 6652
Sfmt 6201
E:\BILLS\S171.IS
S171
pamtmann on DSKBC07HB2PROD with BILLS
2
•S 171 IS
for the import of oil from Canada to the United States
1
described in the Presidential Permit of March 29, 2019
2
(84 Fed. Reg. 13101).
3
(b) NO PRESIDENTIAL PERMIT REQUIRED.—No
4
Presidential permit (or similar permit) under Executive
5
Order 13867 (3 U.S.C. 301 note; relating to the issuance
6
of permits with respect to facilities and land transpor-
7
tation crossings at the international boundaries of the
8
United States), Executive Order 12038 (42 U.S.C. 7151
9
note; relating to the transfer of certain functions to the
10
Secretary of Energy), Executive Order 10485 (15 U.S.C.
11
717b note; relating to the performance of functions re-
12
specting electric power and natural gas facilities located
13
on United States borders), or any other Executive order
14
shall be required for the construction, connection, oper-
15
ation, or maintenance of the pipeline facilities described
16
in subsection (a).
17
Æ
VerDate Sep 11 2014
20:50 Feb 14, 2021
Jkt 019200
PO 00000
Frm 00002
Fmt 6652
Sfmt 6301
E:\BILLS\S171.IS
S171
pamtmann on DSKBC07HB2PROD with BILLS